Loading...
Wynnpage-CS 910813 unzicker * schnurbusch * associates * inC. civil en neers * surveyors * planners dallas, texas ~524~ AUgUSt 13, 1991 , ' ~ Nathan D. Maier Consulting Engineers Attn: Mike Boyd, Project Manager 3 North Park, Suite 300 8800 North Central Expressway Dallas, Texas 75231 Re: Wynnpage Addition Coppell, Texas Job No. 90051-0 Dear Mr. Boyd: We are in the process of 'developing a 20.72 acre tract of land in Coppell, Texas located on the west side of Denton Tap Road between Bethel School road and Sandy Lake Road. The proposed 78 lot single family subdivision is also located along the South line of a tract of land owned by H.T. Ardinger, Jr., a client of yours from what I have been told. I have been instructed by the acting City Engineer and our client to investigate the possibility of obtaining a temporary drainage and access easement from Mr. Ardinger. Please find attached a copy of the Final Plat for the referenced additions as well as the Drainage Area Map, the Storm Sewer Plan Profile Exhibit for line "D-2", the Paving Plan/Profile of Tealwood Drive, and the Lot Grading Plan this development. In general, you will notice that approximately 13.1 acres ~-f-f q~_A~.~_~r~-~ property drain~ ~ross our north prope~-~--~e. Therefore~ we propose to extend a storm sewer system in Tealwood Drive and construct a 3' x 3' "Y" inlet just inside your clients property. There would also need to be some grade work around the inlet and along his south property line to help collect the runoff in the proposed inlet. I believe that this design is a sound design and has been found acceptable by the city of Coppell (according to their initial review of these plans). When your client develops his property, this easement can be abandon and the runoff from his site collected in the storm sewer system which can be extended off the end of our proposed system. I have marked the location of the proposed easement on the Lot Grading Plan. If you find this reguest acceptable please contact me at your earliest convenience. I will prepare a draft of the easement document, field notes and all necessary exhibits once Mr. Ardinger's concerns have been addressed. PAUL 5. UNZICKER, P.E. DAVID M. 5CHNURBUSCN, P.E. PRESIDENT VICE.PRESIDENT 'Page 2 Mr. Nathan D. Maier August 13, 1991 I look forward to working with you on this matter. If you have any questions, please feel free to call me at (214) 634-3300. Sincerely, Kevin R. Kendrick, P.E. Project Manager cc: Jim Siepiela - Siepiela Interest Wayman Levell - JWC Investment ~/ Shore Daneshmand, P.E. - City of Coppell