Loading...
SWM-CS 092618 ��'�E ��' �� ` � Jon Niermann, Chairman ,w ,,� � Emily Lindley, Commissioner ��' � � ToUy 13aker,Executive Director � TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Protecting I'exas hy Reducing and Prevenring Pollution September 2G, 2018 Mr. Mark Bland, City Manager c/o Mr. Michael Garza, P.E., Assistant Director of Engineering City of Coppell 2G5 East Parkway Boulevard Coppell, Texas 75019 Re: City of Coppell Phase II MS4 - Year 4 Annual Report Review TPDES Permst A�thorization No. TXR0403�5 (CNG0��5GG�9; RN105GI3�58) Dear Mr. Bland: We have received the annual report for the City of Coppell MS4 that was suUmitted on March 19, 2018, for the Year 4 reporting period for the above-referenced perinit authorization and subsequent information submitted Uy postal mail on April 19, 2018. We have performed an administrative and technical review of this report and based on the information provided it appears that your annual report includes all of the required inforination. Please note that additional information or revisions inay be required as a result of an inspection or an audit to deterinine compliance with the approved municipal separate storm sewer system (MS4) Storinwater Management Program (S4VMP) and the Phase II MS4 General Permit TXR040000. If there are any differences between the approved SWMP and the information provided in this annual report or future reports, you must subinit a Notice of Change (NOC) forin (`1'C�Q-203�2j, as required i�y The Phase iI iviS4 Generai Perinit (TXR�4�G�^v). The annual report is due within 90 days of each reporting year as specified in your Notice of Intent (NOI). The TeYas Coininission on Environmental Quality (TCE� has an annual report form (TCEQ-205G1) available, and the MS4 operators must use the template when preparing and submitting suUsequent reports (See Part IV.B.2 of the general permit). This will greatly assist us in reviewing the reports and will help to ensure that you include all the required elements. The form is available at the TCEQ website at: https://www.tceq:texas.gov/search forms.html. After you open the weUpage scroll to Current Form Search. Enter 20561 in the box under Form Number and click on Submit to download the annual report form. P.O.Boi 13087 • Austin,Tc�as 78711-3087 • 512-239-]000 • tceq.te�as.gov How is our customer service? tceq.texas.gov/customersurvey printed on rccycled paper Mr. Mark Bland, City Manager Page 2 September 26, 2018 Please make sure to also forward a copy of your annual reports to your local TCEQ regional office. If we have asked you to make changes to the annual report during our review process, please submit the updated annual report to your local regional office. Finally, please be aware that discharges of the pollutant(s) of concern to impaired water bodies for which there is a total maximum daily load (TMDL) implementation plan are not eligible for coverage under the Phase II MS4 General Permit unless they are consistent with the approved TMDL and the associated implementation plan. Permitted MS4 operators must incorporate the limitations, conditions and requirements applicable to their discharges, including monitoring frequency and reporting required by TCEQ rules, into their SWMP in order to continue to be eligible for coverage under the general permit. If the discharge is no longer eligible for coverage under the Phase II MS4 General Perinit, then the MS4 operator would be required to apply for and receive an individual TPDES permit. If you have any questions about the information in this letter, please do not hesitate to contact me at (512) 239-4749. Sincerely, r �1 �� V Dan Siebeneicher, Natural Resource Specialist Stormwater Team (MC-148) Water Quality Division TeYas Commission on Environmental Quality DDS/sh cc: Ms. Luay Rahil, City of Coppell, 2G5 East Parkway Boulevard Coppell, TeYas i 5019