20190304132823244DENTON CREEK DRAINAGE STUDY CITY OF COPPELL, TX STUDY AREA f v bI ! ✓ +ly 10 is q Y dd Air Drainage Area: At Denton Tap = 12.3 sq. mi. Cottonwood Creek = 6.1 sq. mi. D/S Limit of DCLID = 22.3 sq. mi. Total = 25.4 sq. mi. HALFF ASSOCIATES, INC. Oty 0 Lewisville. Tinein of Flower Mound Upstream Study Umit Oenton County Lrvee 121 Impawemeae INrt.kt No, l �1 OentoacRyo( �'. ��,. Gnollton n C� y�„C Gnpovine Q to Lake Ury of Grapevine S�� �aYa ypA s V. oewwWwm SWdL. Link 11 �:rrrr � 1. @vo/DeWe 12/6/2017 L •ALTA RMF l:,J:AMP A[WJL%RSEE OR1/!\ 1!rE[• • Analyze the current conon of the of the channel through visual survey • Conduct a stability analysis • Assess stable channel configurations • Assess sediment contribution and source of sediment • Physically measure erodibility of banks • Assess incipient motion of bed material ■■■ HALFF ASSOCIATES, INC. n %� Sy.►/(F— TrY "cF krtc—i ^Channel Evo�lutio,,n�s Model U/i7QrliZabtDi9 �� �Tnrac>3� T.mc., No ■■■ HALFF ASSOCIATES, INC. 12/6/2017 Channel Evo�utlon Model aua. t...r.� � � I s.k �• .,k n le...�,..� . ��' � ' �1 b, a ,a 4 � , �h �� �: � 1 � .� a� �; ��� ��� HALFF ASSOCIATES. INC. � � a��sye�M �.�—.s�.iy .mss.-�������a.,. Lctkt Grtrps�rne syr �;Ny�. �vs+��N �yy'� /9fIL ar.'¢'r�'r" exryefaflur ir.ns� f(r�dp:i� •/h.oya,. �s � � ��� eras edci�ned' .�. `�� lJr�77piZ4rEr0h _ " °'� "\'`rpt. .. . , �� ,7,Ynf�r 02ek Sya�eM Z�.+�--s.��/y .�� Channel Evolution Motlel '��,'... iii ��� HALFF ASSOCIATES, INC. 12/6/2017 n Not Alf ;.000FFIFFA��Ilf. vo _717= For f 1� 1 ` (All -j 1- CICPFF 1`` d7Cr Fps\yJ///(///5 ❑ I� 1}r:e JFK t- t�4_i ..!'\ IF it kFAA� e i r 111 s (�\•' 1 Il l__. T till, IFa.tWlr RIAlitJ 11 ttof IF WA Z !IF I t : , t. /�//�/ .es t yV `? ;- APS iIt r menlc of ® (sTi •' 1 !Y d t ,- IFIFFFFFAF In ,I1, masa y lFIF to It if If ---- c -. Al .t SURVEY OF SUPPLY REACH IF tap' -vin ,rapeit L:ineeCC I Twenty "`yy °o"yA°"'re' — DENTON CREEK y� r'C a �r ,+ �►�t -Ar�,SS Fs` �' a 7a .4ftti ', it y wC �~ yNo, of �r i- .sd!..If 0 FF p�j'4�''i'� x'971 "Not Bob .,. N. All _..if a F IF� z ,oIllook A, AFIF Flat -:Al t - IF - — - = _ _F . it. to 0 to It i t e F + :'� J a� I k i. �y For PO l — ',- IF `` .. ter,_ IF dd FAFF IN a. Ic _:.-- COMPARISON WIDTHS UPSTREAM & DOWNSTREAM OF DENTON TAP p rN 7 lit' ; V�V 'Opt, it I aAkim_ - do loll e— r. t> sss as, AT ass mvv Ariz asPOW> '� ''` . - 12/6/2017 Mean Movement= 1.56 fUday. sid oev. = i. i s Minimum=0.47 fl/day Maximum= 3.375 Way kJerangvarirerey B yaya3rs m Fq hmi AAwlrt/uu ro ae Oenfon ��� HALFF ASSOCIATES, INC. • Sand is suspended less than 6 - feet with larger flows • Approximately 7.5% of the sand is deposited within the DCLID-1 • Minimum 35 -years of deposition 7 �l M ►I M RVA ►' MM :,» ;W, :l• llfl(D 2100D 13000 2lpm 1 �_ �l Pbler SUtbn tGR Plans —t Creek Survey t Flood Control Channel Survey • Preliminary Erosion Hazard Zone (EHZ) • Estimated 41 homes in EHZ • 21.5 protected • 15 toe erosion/slope problems • Four (4) no erosion currently • Further geotechnical investigation needed to itemize ■■■ HALFF AssoclnTEs, INc. Summary: Erosion Corridor Evaluation -EHZ - 12/6/2017 i • Stable Channel Design Recommendations: • Bottom Width = 47-53 feet • Depth = 5-6 feet • Side Slope = 3H:1V • Channel Slope = 0.0004 ft/ft (1 ft drop in elevation over 2200 feet) • Continued downcutting and widening of channel upstream of Denton Tap expected • Preliminary EHZ HALFF ASSOCIATES, INC. • USACE HEC -HMS model updated to reflect current lag times, curve numbers, and drainage areas due to storm sewer • Results in 300-1,000 cfs lower discharges for the 100 -year through DCLID compared to FEMA and 800- 1,700 cfs lower than USACE • Preliminary USACE 500 -year flow increased from 36,200 cfs to 55,500 cfs no No l�00 HALFF ASSOCIATES, INC. 17892 A roximate Beginning of Levee Approximately 3,300 feet downstream of MacArthur 18826 20,600 22,000 20,300 Boulevard MacArthur Boulevard 24519 Approximate End of Levee Approximately 3,769 feet downstream of Denton Tap 25499 21,300 21,000 20,200 Road Approximately 2,500 feet downstream of Denton Tap 26688 21,300 21,000 13,100 Road Approximately 1,000 feet downstream of Denton Tap 28217 21,300 13,500 13,000 Road Denton Tap Road 12/6/2017 •1r11�V1�VI1[• • USACE HEC -RAS model updated/modified with survey and updated topography • Three hydraulic models developed for study: • Steady-state to compare to FEMA and USACE • Unsteady state to incorporate Elm Fork Trinity River backwater effects • 2 -Dimensional to evaluate low flows and velocities ■■■ HALFF ASSOCIATES. INC. • Releases from Lake Grapevine and Lake Lewisville for the May 2015 were used to calibrate hydraulic models • 2 USGS Gages • SH 121 at Denton Creek • Carrollton Dam on the Elm of the Trinity River (below Denton Creek Confluence) • Modeled releases from Grapevine and Lewisville Lake based on USGS gage data with 10 -year frequency • Models reproduced flooding in Wellington Place Apartments am EN ■00 HALFF ASSOCIATES, INC. •2 -year discharge "10 -year plus releases from Lewisville • Gage datum at SH 121 is approximately 4 -ft lower than surveyed flowline (439.11 vs. 443.21) • May 2015 storm event was reported as a 10 -year event 12/6/2017 HYDRAULIC MODEL CALIBRATION A 5 r EXISTING 2 YEAR VELOCITIES Denton Creek Sandy Lake Road i tF 1 tot�.: tip t f,. • \ o _ �e•ti EXISTING 2 YEAR VELOCITIES ,= , 4 +�r � , } , I I I E -1I =154 0 P , = =6,0-5 5 y ,ate _ ,I tf `► _ ' a.� EXISTING 2 YEAR VELOCITIES LM 4 r, Z 4' EXISTING 2 YEAR VELOCITIES 00 O 12010 _ 12t500 ,� mf6at �� •'1 ill �.&A AS OCITIES f grr EXISTING 2 YEAR VEL ® EXISTING 2 YEAR VELOCITIES 46 St ALTERNATIVE ANALYSIS ■■■ HALFF ASSOCIATES, INC. • Located just downstream of Denton Tap Road • Concrete structure recommended to prevent further downcutting upstream of Denton Tap Road • Would result in less sediment transported to DCLID-1 • Estimated Cost = $287,000 ■■■ HALFF ASSOCIATES, INC. • Berm constructed at upstream junction • Length and meander mimic existing channel ® Utilize stable channel design • Four (4) hard points along channel • Banks must be protected • Estimated Cost = $7.4 million 12/6/2017 15 -..� o '''' STRUCTURE PROFILE O • Located just downstream of Denton Tap Road • Concrete structure recommended to prevent further downcutting upstream of Denton Tap Road • Would result in less sediment transported to DCLID-1 • Estimated Cost = $287,000 ■■■ HALFF ASSOCIATES, INC. • Berm constructed at upstream junction • Length and meander mimic existing channel ® Utilize stable channel design • Four (4) hard points along channel • Banks must be protected • Estimated Cost = $7.4 million 12/6/2017 15 Advantages • Eliminates erosive velocities • Excess excavation may be provided to homeowners • Increased flood storage ... HALFF ASSOCIATES, INC. • Divert erosive flows away from bank • Alignment and placement are key • Fully submerged at bankfull elevation • Total of seven (7) barbs • Estimated Cost = $836,000 ... HALFF ASSOCIATES, INC. Disadvantages • Expensive • Environmenta permitting negotiations and ROW • High 0&M cost • Stagnant water in existing channel 12/6/2017 C1J • 12/6/2017 e�reTa,au-e nv��n,mn��s� !'ey mho bnk� �71V dtmk xryr bsh Taneftame / odowth"" \\ 76edbW -M�V s \` Fm M" ~ \\\\\ - 3 � r � - TaedbankJ !; ,bpdb=k \ nlwa ��� FIAIFF ASSOCIATES, INC. 17 12/6/2017 12/6/2017 19