Loading...
Connell Skaggs (Andy's)-FE190219 January 30, 2019 Mr. Aaron King Andy's Frozen Custard 211 E. Water Street Springfield, Missouri 65806 RE: Connell Skaggs Addition, Lot 3R2, Block 1 Fee Assessment Letter Dear Mr. King, Below is City of Coppell development fee assessment table for the proposed development. Attached are the backup for the fee calculations. Fee Type Fee Amount Fee Due Pay To Roadway Impact $5,785 Plat Submittal for Staff Signatures Engineering Department Water and Wastewater Impact $11,097 Issuance of Building Permit Building Inspections Water Meter Calculated During Issuance of Meter Issuance of Water Meter Building Inspections Construction Inspection Fees Calculated After Construction Plans are Approved Prior to Scheduling Pre-Construction Meeting Engineering Department Appropriate payment of the required fees will help ensure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please let me know. Sincerely, Kumar Gali, P.E. Assistant Director of Public Works - Engineering cc: Kent Collins, P.E. Director of Public Works & Engineering Unofficial City of Coppell 1/30/2019 4:39 PM Roadway Impact Fees:(Charged at time of Plat filing or at site plan approval or change in land  use) Land Use: S.U.s Devel. Residential Units Fee per vehicle mile Residential (Medium/Low) 4.24 No. Lots/Units 150.00$                    ‐$                        Residential (High Density) 2.6 No. Lots/Units 150.00$                    ‐$                        Residential Others Not Specified 4.24 No. Lots/Units 150.00$                    ‐$                        Office Building Area (sf) divide sf/1000 General Office Building 7.15 Building Area (sf) 150.00$                    ‐$                        Medical/Dental Office 16.61 Building Area (sf) 150.00$                    ‐$                        Office Others Not Specified 7.15 Building Area (sf) 150.00$                    ‐$                        Retail/Commercial Shopping Center 6.38 Building Area (sf) 150.00$                    ‐$                        Home Improvement Superstore 2.19 Building Area (sf) 150.00$                    ‐$                        Super market 4.87 Building Area (sf) 150.00$                    ‐$                        Restaurant 10.02 Building Area (sf) 150.00$                    ‐$                        1168 Fast food with drive thru 33.02 Building Area (sf) 150.00$                   5,785.00$              Gasoline/Service Station 4.79 No. Fuel Positions 150.00$                    ‐$                        Convenience Store 6.38 Building Area (sf) 150.00$                    ‐$                        Hotel 1.89 No. Rooms 150.00$                    ‐$                        Bank with Drive thru 12.66 Building Area (sf) 150.00$                    ‐$                        Commercial Others Not Specified 6.38 Building Area (sf) 150.00$                    ‐$                        Light Industrial General Light Industrial 3.2 Building Area (sf) 150.00$                    ‐$                        Industrial Park 2.84 Building Area (sf) 150.00$                    ‐$                        Mini Warehouse (Self Storage) 0.86 Building Area (sf) 150.00$                    ‐$                        Industrial Others Not Specified 3.2 Building Area (sf) 150.00$                    ‐$                        Institutional Primary/Middle School 0.32 # of Students 150.00$                    ‐$                        Private School 1.26 # of Students 150.00$                    ‐$                        High School 0.29 # of Students 150.00$                    ‐$                        Junior/Community College 0.36 # of Students 150.00$                    ‐$                        Day Care Center 1.72 # of Students 150.00$                    ‐$                        Church/Synagogue 0.8 Building Area (sf) 150.00$                    ‐$                        Institutional Others Not Specified 0.8 Building Area (sf) 150.00$                    ‐$                        Other use not identified,  150.00$                    ‐$                        use ITE Trip Generation Manual for S.U.s Sub Total: 5,785.00$              Impact Fee Estimate:Liability for use of this spreadsheet is entirely on the user. The City of Coppell will not be held liable for improper  use. S:\Asbuilts\Design_Files\Connell Skaggs Addition\Lots 3r2, Blk 1 (Andys Custard)\Impact Fees\Working\Andy's Frozen Custard Impact Fees 1 of 3 Unofficial City of Coppell 1/30/2019 4:39 PM Water Impact Fee:(Charged when meters are pulled) # of Meters Meter Size ESUs/meter # meters * ESUs $ per ESU Domestic: 5/8 in x 3/4 in 1 0 900.00$                    ‐$                        1 in 1.67 0 900.00$                    ‐$                        1 1/2 in 3.33 0 900.00$                    ‐$                        12 in 5.33 5.33 900.00$                   4,797.00$              3 in 11.67 0 900.00$                    ‐$                        4 in 21 0 900.00$                    ‐$                        6 in 46.67 0 900.00$                    ‐$                        8 in 80 0 900.00$                    ‐$                        10 in 115 0 900.00$                    ‐$                        5.33 Sub Total: 4,797.00$              Irrigation: (Charged when meters are pulled) 5/8 in x 3/4 in 1 0 900.00$                    ‐$                        11 in 1.67 1.67 900.00$                   1,503.00$              1 1/2 in 3.33 0 900.00$                    ‐$                        2 in 5.33 0 900.00$                    ‐$                        3 in 11.67 0 900.00$                    ‐$                        4 in 21 0 900.00$                    ‐$                        6 in 46.67 0 900.00$                    ‐$                        8 in 80 0 900.00$                    ‐$                        10 in 115 0 900.00$                    ‐$                        1.67 Sub Total: 1,503.00$              Fire: (Charged when meters are pulled) 4 in ‐ 12 in 2.5 0 900.00$                    ‐$                        Sub Total:‐$                        Wastewater Impact Fee:(Charged when meters are pulled) *Same as Domestic Water Impact Fee 1 various 5.33 5.33 900.00$                   4,797.00$              Sub Total: 4,797.00$              Park Development Fee:(Charged at time of Plat filing) (For Residential Developments only): # of Units or Lots: Single‐family 1,285.00$                 ‐$                        Multi‐family 1,285.00$                 ‐$                        Sub Total:‐$                        Street Lighting Fee:(Charged prior to final acceptance of development) # 352.44$                    ‐$                        Sub Total:‐$                         Assessed for lighting in the City's right‐of‐way.    This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. of Lights $352.44 is based on the annual cost Oncor Charges for the operation and  maintenance for 3 years S:\Asbuilts\Design_Files\Connell Skaggs Addition\Lots 3r2, Blk 1 (Andys Custard)\Impact Fees\Working\Andy's Frozen Custard Impact Fees 2 of 3 Unofficial City of Coppell 1/30/2019 4:39 PM Street Sign Fees:(Charged prior to final acceptance of development) Construction Inspection Fees:(Charged day of Pre‐construction Meeting) Public Improvements Contract  Amount x 4% Private  Improvements  Contract Amount x 2% Grading:‐$               ‐$                        Paving:‐$               ‐$                        Water:‐$               ‐$                        Wastewater:‐$               ‐$                        Storm Sewer:‐$               ‐$                        Alleys:‐$               ‐$                        Sidewalks:‐$               ‐$                        SWPPP:‐$               ‐$                        Other:‐$               ‐$                        Total:‐$                                                        ‐$               ‐$                          ‐$                        Inspection Fees Total:‐$                             Contact the Engineering Department for an estimate. Assessed for signage in the City's right‐of‐way.  Based on number and type of signs that the City will install.  A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements private maintenance) (4% of development cost required for public improvements dedicated to the city) S:\Asbuilts\Design_Files\Connell Skaggs Addition\Lots 3r2, Blk 1 (Andys Custard)\Impact Fees\Working\Andy's Frozen Custard Impact Fees 3 of 3