Frontier-PT190315A copy of the approved permit must be on the job site at all times.
CC: Applicant
Public Works
Permit File
Orig. to Project File
T H a • C 1 T Y
a IF
RIGHT-OF-WAY USE PERMIT APPLICATION
Page 1014
Rev. 06/2012
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 3 / 15 / 2 0.19 Applicant's Job # /Work Order # 5 2 3 7 9 3 9
PERMIT FEE: $100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider?
❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address Sandy Lake between Moore and MacArthur
General Contractor Green Planet 21
E-mail address to return permit clester@greenplanet2l .com
Contact# (859)443.
j 1 Representative: Timothy P Neal
Franchise; Telephone#: 972-318-5186
Compiany:
E-mail address: tim.neal@ftr. com
(for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete)
Utility Company Represented:
(' Oncor Electric Delivery C) Atmos Energy (') Verizon C I� SBC/ AT&T
C. Time Warner Cable C' CoSery Electric/Gas GZ Other Frontier
GeneraLDescription.ofrWork pn a«ordan�e wltn ora. No. 2001-994): PLEASE ATTACH PLAN OF PROPOSED WORK
Estimated Start Date 3 / 15 / 2 019
Estimated Completion Date* 4 / 3 0 / 2 019
* Completion requires submittal of Completion Verification Notice (see page 4)
➢Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason:no digging required, manhole access only ('� Yes �� No
➢Is removal of existing streets, alleys, or sidewalks necessary? n Yes No
4
f YES, project must have City inspection prior to concrete replacement
Right-of-Wav Use Permit Aunlication Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to. Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972=462=5155.
➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department @ 972=304-3600
Fire Department @ 972-304-3512
Street Department @ 972462-5150
Engineering Department @ 972-304-3679
➢Attach barricade plan /trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9:00 a.m. und13.30 p.m. ONLY unless otherwise approved by City
Engineer.
➢Attach Work Order (franchise only) and/or 1 set of prints showing proposed work.
`Locates forexisting:
For City utility locate
lust;tie done 48 hours prior to beginining work.
i to schedule 48 hours prior to beginning, work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Timothy Neal 3/15/2019
Signature of Utility Company Representative Date
Cody Lester
Signature of Contractor Representative
Darryl Zbranek
Signature of City Representative
Comments
ntact Eric Perkins for field inspection (916)529-0132
➢NOTE:
3/15/2019
Date
3/15/19
Date
and
all construction standards approved by the City of Coppell.
to
ust meet
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
T H a c! T Y O F
"'OPPELL
woo
�r�v,� �-a�
Wt
A. ¢ l
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
Page 3 of 4
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
8.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
10.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:00 a. in. or after 3:00 p.m.
12.Prior notice of work activity on weekends and holidays must be in writing.
13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx.cov/utility-operations-division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT,
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE
214/ 320-5455 (Mike Rasmussen)
AT&T LOCAL NETWORK
214/ 215-3031 (Rich Millenman)
COSERV no
&Electric
940/ 321-7800 x 7624 (Greg Ward)
EXPLORER PIPELINE
918/ 493-5100 (Patrick Nwakoby)
ONCOR Electric Deli
very
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
972/ 318-5277
FEDERAL EMERGENCY MGMT. ADMIN.
940/ 898-5138
TEXAS COMM. on ENVIRONMENTAL QUALITY
817/ 588-5800
DENTON CO. LEVEE DISTRICT
214/ 352-5118 (Richard Hightower)
Atmos Energy
972/360=4428 (Gary Dickinson)
1 800 DIG TESS for line locates
(344 - 8377)
14.Contaminants must be removed from work area daily and disposed of properly out
the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16. "Clean-up" requires returning work area to pre -project condition or better.
17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
T H S C I T YbpoeOO F
PPEL
15;0 . 4 >!
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
14014
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility &Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name
Project Location /Applicant's Work Order # c�eapp���abie>
Sub -contractor Company Name
24 hr. Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
❖Inspected by
of Utilities Maintenance Division on:
and found to be acceptable /not acceptable because
Follow-up needed? C'' Yes r, No Follow-up scheduled for
****Inspected
by
of Streets Maintenance Division on
and found to be acceptable /not acceptable because
Follow-up needed? (')
Yes C', No Follow-up scheduled for
A copy of this completed notice can be provided to the a
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office:972-304-3679 Fax:972-304-3570
'. Submit. by E-mail ' Print Forme