Waterside P2-CS 920127 January 27, 1992 Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas parkway, Ste. 100 Dallas, TX 75248-2684 Re: Waterside Estates Phase II Development Fee Assessment Dear Mr. Anderson: Enclosed is a revised copy of the City of Coppell Development Fee Assessment list for Waterside Estates Phase II. Please disregard the previous list (dated January 23, 19921. The Wastewater Impact Fee was inadvertently omitted from that list. Please provide a check made payable to the City of Coppell in the amount of $127,251.23 plus 2% of the construction cost, and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the EnGineer's Estimate for this project or the contract amount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, · enneth M. Griffin, P.E. City EnGineer KMG/bd cc: Steve Goram, Director of Public Woiks Alan Johnson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Daneshmand, P.E., Civil Engineer WATER7 CITY OF COPPELL DEVELOPMENT FEES Date: January 27, 1992 Project: Waterside Estates Phase II Amount Due Prior to Council Total Fees Approval Park Fee Assessment $ 19,800.00 (132 lots X $150 Per Lot) (50% due at final plat approval) $ 9,900.00 (50% due prior to bld§. permits issuance Water Impact Fee $ 85,800.00 $ 85,800.00 (100% due prior to Council approval of final plat) Water Tap Inspection Fee $ 13,200.00 - (100% due prior to issuance of building permit) Wastewater Impact Fee $ 29,700.00 $ 29,700.00 (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ 13,200.00 - (100% due prior to issuance of building permit) Street Sign Assessment $ 1,851.23 $ 1,851.23 (see attached) Street Li§ht Assessment · - ($292.60 X .... poles) (see attached) Construction Inspection Fee $ $ (2% of construction cost) TOTAL AMOUNT DUE: $163,551.23 $127,251.23 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $127,251.23 Plus 2% Contruction Inspection Fee · THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. WATER6 COPPEL~ PUBLIC WORKS ~Y: DATE: December 31, 1991 TO: Shohre d, Acting City Engineer FROM: Publ i c/Works St a ff RE: Development Fees for Waterside Estates Phase II The following fees should be assessed on the above referenced project. Water Impact Fee: (Does not include Irrigation) 132 - 5/8" x 3/4" Domestic Meter/s = 132 ESU's - Irrigation Meter/s = ESU's - Fireline Meter/s = ESU's Total 132 ESU's @ $650.00 ea = $85,800.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: (MUD) 132-5/8" x 3/4" Domestic Meter/s = 132 ESU's ~ $225.00 = $29,700.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 132 Connections ~ $100.00 each = $13,200.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 132 Connections ~ $100.00 each = $13,200.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 132 Residential Lots at $150.00 each = $19,800.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP /mp cc: Steven G. Goram, Director of Public Works DEVELFE3.HLP STREET SIGN ASSESSMENT for Waterside Estates No. 2 The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 11 $ 698.94 Yield $ 58.56 2 117.12 Stop $ 65.12 Street Name $ 11.60 4 46.40 Stop & Street Combo $ 96.85 9 871.65 OTHER No Outlet $ 58.56 2 $ 117.12 TOTAL $1,851.23 * Cost breakdowns may be obtained from Public Works by written request. Revised 4/1/91