Waterside P2-CS 920127 January 27, 1992
Mr. Bill Anderson
Dan M. Dowdey & Associates
16250 Dallas parkway, Ste. 100
Dallas, TX 75248-2684
Re: Waterside Estates Phase II
Development Fee Assessment
Dear Mr. Anderson:
Enclosed is a revised copy of the City of Coppell Development Fee
Assessment list for Waterside Estates Phase II. Please disregard the
previous list (dated January 23, 19921. The Wastewater Impact Fee was
inadvertently omitted from that list.
Please provide a check made payable to the City of Coppell in the amount
of $127,251.23 plus 2% of the construction cost, and forward it to Alan
Johnson, Finance Department, along with a copy of the Fee Assessment
list. In addition, please provide me with a copy of the EnGineer's
Estimate for this project or the contract amount for verification of the
construction inspection fee.
If you should have any questions, please do no hesitate to contact me.
Sincerely,
· enneth M. Griffin, P.E. City EnGineer
KMG/bd
cc: Steve Goram, Director of Public Woiks
Alan Johnson, Assistant Finance Director
Frank Trando, Finance Director
M. Shohre Daneshmand, P.E., Civil Engineer
WATER7
CITY OF COPPELL
DEVELOPMENT FEES
Date: January 27, 1992
Project: Waterside Estates Phase II
Amount Due
Prior to
Council
Total Fees Approval
Park Fee Assessment $ 19,800.00
(132 lots X $150 Per Lot)
(50% due at final plat approval) $ 9,900.00
(50% due prior to bld§. permits
issuance
Water Impact Fee $ 85,800.00 $ 85,800.00
(100% due prior to Council approval
of final plat)
Water Tap Inspection Fee $ 13,200.00 -
(100% due prior to issuance of
building permit)
Wastewater Impact Fee $ 29,700.00 $ 29,700.00
(100% due prior to Council approval
of final plat)
Sewer Tap Inspection Fee $ 13,200.00 -
(100% due prior to issuance of
building permit)
Street Sign Assessment $ 1,851.23 $ 1,851.23
(see attached)
Street Li§ht Assessment · -
($292.60 X .... poles)
(see attached)
Construction Inspection Fee $ $
(2% of construction cost)
TOTAL AMOUNT DUE: $163,551.23 $127,251.23
TOTAL AMOUNT DUE PRIOR TO
COUNCIL APPROVAL $127,251.23
Plus 2% Contruction
Inspection Fee
· THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE
LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED
$292.60 PER LIGHT WILL BE ASSESSED.
WATER6
COPPEL~ PUBLIC WORKS ~Y:
DATE: December 31, 1991
TO: Shohre d, Acting City Engineer
FROM: Publ i c/Works St a ff
RE: Development Fees for Waterside Estates Phase II
The following fees should be assessed on the above referenced
project.
Water Impact Fee: (Does not include Irrigation)
132 - 5/8" x 3/4" Domestic Meter/s = 132 ESU's
- Irrigation Meter/s = ESU's
- Fireline Meter/s = ESU's
Total 132 ESU's @ $650.00 ea = $85,800.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee: (MUD)
132-5/8" x 3/4" Domestic Meter/s = 132 ESU's ~ $225.00 = $29,700.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
132 Connections ~ $100.00 each = $13,200.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
132 Connections ~ $100.00 each = $13,200.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
132 Residential Lots at $150.00 each = $19,800.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP /mp
cc: Steven G. Goram, Director of Public Works
DEVELFE3.HLP
STREET SIGN ASSESSMENT
for Waterside Estates No. 2
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 11 $ 698.94
Yield $ 58.56 2 117.12
Stop $ 65.12
Street Name $ 11.60 4 46.40
Stop & Street Combo $ 96.85 9 871.65
OTHER
No Outlet $ 58.56 2 $ 117.12
TOTAL $1,851.23
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91