Loading...
PA9702-LR000427CONCRETE COMPREu IVE STRENGTH TES a division 8901 Carpenter Frwy., Suite ~1~ Date of Service: 03/28/20~ Report No.: 0008311 Report Date 04/27/20~ Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: CoppellAquatic~reationCtr Atm: Bra~Reid 732 DeForest 3~ Block of P~kway Blvd Coppell TX 75019 Coppell, Texas~rj. ~6051 Services: Ob~in samples offresh concrete at the placement l~afions, peffo~requ~ed field test and cast compresslye strength samples. PROJECT DATA CO~OR: ~$aW ~ Assoc. ~ I.D.: N/A CONC~SUPPL~R: NelsonBrothers P~CE~DA~: 03/28/2~ BATCHT~: 7:52am ~LA~: ~wisville T~SA~LED: 8:15~ nY: JoeyGordon SPEC~ICATION ~QUI~S ~R CO~ffIONS: Clear ST~NGTH: 3~ psi ~ 28 Days TE~E~ (~ - AIR ~ F CONC~: 73 F SLY: 5.0" Max TRUCK NO: ~07 TIC~T NO: N/A Am: N/A AmCO~(~): N/A UNIT~IGHT,(p~: N/A TnS~ ~OD: ASTM C- 143 ~ACE~ LOCA~ON: ~k of p~l ASTM C-172 ASTM C-39 S~led from SABLE LOCATION: Pool deck PORT OF TESTS ACC A WVA S: CYLINDER MEASURED MAX~[UM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inch~) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.00 0410412000 7 104670 3700 1 2 4.00 04/04/2000 7 106010 3750 Average 3730 1 3 4.00 04/25/2000 28 1455 10 5150 I 4 4.00 04/25/2000 28 140210 4960 Average 5060 Technician: Joey Gordon Started: 7:00am Finished: 9:00am I'~ E g, Inc. Report Distribution: ( 1 ) Ciiy of Coppell ( l ) City of Coppell * Engineering (1) Bfinkley Sargent Architects (1) City ofCoppell - Bldg. Insp. Paul D. Smith, P.E. (1) Turner Engineers (1) City of Copper - Leisure Serv Dept Senior Project Engineer (1) Hisaw & ASsociates This veporl is exclusively for the Use of die Client indicated above and shall not be reproduced except in full widiout the written approval of HBC Engineering, Inc. 01LL Page I of 1