Woodlands-LR 950831ALPHA TESTIN ,G~.NC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
MEC ' NiCAL
STABILIZATION REPORT
FINAL MIX
TESTED FOR
W.O.C. INVESTMENTS, INC.
C/O FINLEY DEVELOPMENT
ADDISON, TEXAS
WOODLANDS OF COPPELL
COPPELL, TEXAS
~OJECT
VARIOUS STREETS
AreaofWork:
DATE 08/31/95
95230-37
OUR REPORT NO.
Date cement initially applied: 08/31/95
depth: 6 inches. Date of final mixing:
SampleLocation
STA. 1+30 8RECKLAND HEIGHTS
STA. 4+20 8RECKLAND HEIGHTS
STA. 0+35 WINDING HOLLOW LN.
STA. 4+50 WINDING HOLLOW LN.
STA. 0+90 DARTMOUTH LN.
STA. 6+00 COPPELL RD.
STA. 9+10 QOPPELL RD.
STA. 11+00 COPPELL RD.
STA. 14+00 COPPELL RD.
STA. 17+00 COPPELL RD.
STA. 19+00 COPPELL RD.
TEST DATA
Remarks:
, Average final compacted
08/31/95 .
Passing ~ Passing
3/4" Sieve #4 Sieve
100 66
100 70
100 65
100 66
100 69
100 69
100 67
100 64
100 63
100 64
100 66
R I.ly Subm
AI'I~-IA TJE~TI~If~. IN~.
ALPHA TESTING, I1~_.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
REPOHT OF FIELD
COMPACTION TESTS
TESTEDFOR: W.O.C. INVESTMENTS, INC. DATE:
C/O FINLEY DEVELOPHENT
ADDISON, TEXAS
08t31/g5
WOODLANDS OF COPPELL
PROJECT: COPPELL, TEXAS OURREPORTNO.
95230-36A
TEST DATA:
TEST '~. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT*
NO. DATE NUMBER % PCF % PCF
136 08/31 SG 3C 16.6 107.6 17.3 103 96 4-A
13~ 08/31 $6 3C 16.6 107.6 18.9 104 96 4-A
136 08/31 56 3C 16.6 107.6 16.7 104
135 08/31 SiS 3C 16.6 107.6 17.8 105 97 4-A
TEST LOCATION:
136 NEWCASTLE CT. 8 STATION 1+51
137 8RECKLAND HIEGHTS ~ STATION 4+00
138 8RECKLAND HIEGHTS 8 STATION 2+00
135 WINDING HOLLOW LANE 8 STATION 1+50
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENTTREATED
A. TEST RESULTS COMPLY WITH SPECIFICATIONS
B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
D. RETEST
ALPHA TESTING, IN~.
2209 wisconsin St., Suite 100
Dallas, Texas 75229 ·
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
W.O.C. INVESTMENTS, INC.
C/O FINLEY DEVELOPMENT
ADDISON, TEXAS
DATE
08/31/95
PROJECT
WOODLANDS OF COPPELL
COPPELL, TEXAS
OUR REPORT NO.
95230--36
DATE:
WEATHER: CLEAR
TEMPERATURE RANGE: TO:
75 100
ALPHA Representaltve: E. R.
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED 8Y THE
CLIENT'S REPRESENTATIVE, TO PERFORM FIELD DENSITY TESTING.
A TOTAL OF FOUR FIELD DENSITY TESTS WERE PERFORMED ON CEMENT STABILIZED
SOILS FOR PAVING AREA. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS.
CONTRACTOR WAS INFORMED OF TEST RESULTS WHICH APPEARED l'O COMPLY WITH
PROJECT SPECIFICATIONS.
TECHNICIAN RETURNED TO THE LABORATORY .UPON COMPLETION OF SCHEDULED TESTING
AND INSPECTION.