Loading...
Woodlands-LR 950831ALPHA TESTIN ,G~.NC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 MEC ' NiCAL STABILIZATION REPORT FINAL MIX TESTED FOR W.O.C. INVESTMENTS, INC. C/O FINLEY DEVELOPMENT ADDISON, TEXAS WOODLANDS OF COPPELL COPPELL, TEXAS ~OJECT VARIOUS STREETS AreaofWork: DATE 08/31/95 95230-37 OUR REPORT NO. Date cement initially applied: 08/31/95 depth: 6 inches. Date of final mixing: SampleLocation STA. 1+30 8RECKLAND HEIGHTS STA. 4+20 8RECKLAND HEIGHTS STA. 0+35 WINDING HOLLOW LN. STA. 4+50 WINDING HOLLOW LN. STA. 0+90 DARTMOUTH LN. STA. 6+00 COPPELL RD. STA. 9+10 QOPPELL RD. STA. 11+00 COPPELL RD. STA. 14+00 COPPELL RD. STA. 17+00 COPPELL RD. STA. 19+00 COPPELL RD. TEST DATA Remarks: , Average final compacted 08/31/95 . Passing ~ Passing 3/4" Sieve #4 Sieve 100 66 100 70 100 65 100 66 100 69 100 69 100 67 100 64 100 63 100 64 100 66 R I.ly Subm AI'I~-IA TJE~TI~If~. IN~. ALPHA TESTING, I1~_. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPOHT OF FIELD COMPACTION TESTS TESTEDFOR: W.O.C. INVESTMENTS, INC. DATE: C/O FINLEY DEVELOPHENT ADDISON, TEXAS 08t31/g5 WOODLANDS OF COPPELL PROJECT: COPPELL, TEXAS OURREPORTNO. 95230-36A TEST DATA: TEST '~. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. DATE NUMBER % PCF % PCF 136 08/31 SG 3C 16.6 107.6 17.3 103 96 4-A 13~ 08/31 $6 3C 16.6 107.6 18.9 104 96 4-A 136 08/31 56 3C 16.6 107.6 16.7 104 135 08/31 SiS 3C 16.6 107.6 17.8 105 97 4-A TEST LOCATION: 136 NEWCASTLE CT. 8 STATION 1+51 137 8RECKLAND HIEGHTS ~ STATION 4+00 138 8RECKLAND HIEGHTS 8 STATION 2+00 135 WINDING HOLLOW LANE 8 STATION 1+50 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, IN~. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 · (214) 620-8911 DAILY FIELD REPORT TESTED FOR W.O.C. INVESTMENTS, INC. C/O FINLEY DEVELOPMENT ADDISON, TEXAS DATE 08/31/95 PROJECT WOODLANDS OF COPPELL COPPELL, TEXAS OUR REPORT NO. 95230--36 DATE: WEATHER: CLEAR TEMPERATURE RANGE: TO: 75 100 ALPHA Representaltve: E. R. THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED 8Y THE CLIENT'S REPRESENTATIVE, TO PERFORM FIELD DENSITY TESTING. A TOTAL OF FOUR FIELD DENSITY TESTS WERE PERFORMED ON CEMENT STABILIZED SOILS FOR PAVING AREA. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS. CONTRACTOR WAS INFORMED OF TEST RESULTS WHICH APPEARED l'O COMPLY WITH PROJECT SPECIFICATIONS. TECHNICIAN RETURNED TO THE LABORATORY .UPON COMPLETION OF SCHEDULED TESTING AND INSPECTION.