Loading...
Woodlands-LR 950713ALPHA TESTING, ~ 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REP ' T OF FIELD COMPACTION TESTS TESTED FOR: W.O.C. INVESTMENTS, INC. C/O FINLEY DEVELOPHENT ADDISON, TEXAS DATE: 07/13/95 PROJECT: ~OODLANDS OF COPPELL OURREPORTNO. 95230--16 COPPELL, TEXAS TEST DATA: TESTI [~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DEHSITY COMPACTION COMMENT* NO.I DATE mDEPTH~ NUMBER % PCF % PCF 77 07/13 ;G-4.0 2 1,5.3 111.3 15.5 10/) 97 L-A 78 07/13 FG-2.0 2 15.3 111.3 1,5.6 108 97 L-A 79 07/13 FG-4.0 2 15.3 111.3 15, .8 108 97 L-A 80 07/13 FG-2.0 2 15.3 111.3 16.0 108 97 1-A 81 07/13 FG-6.0 2 15.3 111.3 16.2 108 97 1-A 82 07/13 FG-4.0 2 15.3 111.3 16.4 109 98 1-A 93 07/13 FG-2.0 2 15.3 111.3 16.5 108 97 1-A TEST LOCATION: 77 WATER LINE ALONG BRECKLAND HEIGHTS 0 PAVEMENT STA. O+SO 78 WATER LINE ALONG 8RECKLAND HEIGHTS · PAVEMENT STA. 0+60 79 WATER LINE ALONG 8RECKLAND HEIGHTS 8 PAVEMENT STA. 3+70 80 WATER LINE ALONG BRECKLAND HEIGHTS ~ PAVEMENT STA. 3+80 81 WATER LINE ALONG NEWCASTLE CT. 8 PAVEMENT STA. 0+90 82 WATER LINE ALONG NEWCASTLE CT. 8 PAVEMENT STA. 1+00 83 WATER LINE ALONG NEWCASTLE CT. 0 PAVEMENT STA. 1+20 ~y Submiffed,~~'~' / / 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST