Loading...
Woodlands-LR 950609ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR W.O.C. INVESTMENTS, INC. C/O FINLEY DEVELOPMENT ADDISON, TEXAS DATE 06/09/95 PROJECT WOODLANDS OF COPPELL COPPELL, TEXAS OUR REPORT NO, 95230-7 WEATHER: CLEAR DATE: TEMPERATURE RANGE: 90 TO: 95 ALPHA Repte~enta#v~: T. E. THE ALPHA TECHNICIAN TRAVELED TO THE CLIENT'S REPRESENTATIVE, TO PERFORM SUSGRADE PREPARATION. PROJECT SITE A5 REQUESTEO FIELD DENSITY TESTING AND 8Y THE VERIFY SUBGRADE FOR BUILDING PAD AREAS WAS VISUALLY INSPECTEO TO ASSURE THAT ALL VEGETATION HAD SEEN PROPERLY REMOVED AND THAT AREAS HAD SEEN PREPARED IN ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS. LOT ELEVEN ON 8LOCK 'A" WAS INSPECTED AND APPEARED TO COMPLY WITH GEOTECHNICAL RECOMMENDATIONS. A TOTAL OF SEVEN FIELD DENSITY TESTS WERE PERFORMEO ON FILL ANO NATURAL SUBGRADE SOILS FOR WOODLANDS OF COPPELL. SEE ATTACHED REPORT OF FIELO COMPACTION TESTS. RON WITH RODMAN WAS INFORMED OF TEST RESULTS WHICH APPEARED TO COMPLY WITH PROJECT SPECIFICATIONS. TECHNICIAN RETURNED TO THE LABORATORY UPON COMPLETION OF SCHEDULED TESTING AND INSPECTION. ALPHA TESTING, 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: W.O.C. INVESTMENTS, INC. DATE: C/O FINLEY DEVELOPMENT ADDISON, TEXAS 06/09/95 WOODLANDS OF COPPELL PROJECT: COPPELL, TEXAS OURREPORTNO. 95230-7A TEST DATA: MOISTURE DRY DENS~ M~S~RE DRY DE~ COMPA~ON COMMENT NO. DATE ~DEP~ ~-I NUMBER % PCF % PCF 20 06/09 FG-O.5 I 15.9 110.9 15.6 108 98 1-A 21 06/09 FG 1 15.9 110.9 16.4 107 97 1-A 22 06/09 NSG 1 15.9 110.9 16.9 107 96 2-A 23 06/09 FG-4.0 1 15.9 110.9 17.2 107 97 1-A 24 06/09 FG-3.S i 15.9 110.9 17.4 i07 97 1-A 25 06/09 FG-3.0 1 15.9 110.9 17.7 107 97 1-A 26 06/09 FG-2.5 I 15.9 110.9 16.2 107 97 1-A TEST LOCATION: 20 DARTMOUTH LANE STA. 0+00 0 CENTER LINE 21 DARTMOUTH LANE STA. 0+10 0 CENTER LINE 22 8LK 'A' LOT 11 23 BLK 'A' LOT 11 24 8LK 'A' LOT 11 25 BLK 'A" LOT 11 26 8LK "A" LOT 11 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST