Loading...
Spectrum-PT190624RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: Applicant’s Job # / Work Order # PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Utility Company Represented: Oncor Electric Delivery Atmos Energy Verizon SBC/ AT&T Time Warner Cable CoServ Electric/Gas Other Estimated Start Date Estimated Completion Date* * Completion requires submittal of Completion Verification Notice (see page 4) ¾Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: Yes No ¾Is removal of existing streets, alleys, or sidewalks necessary? Yes No if YES, project must have City inspection prior to concrete replacement CC: Applicant Public Works Permit File Orig. to Project File Page 1 of 4 Rev. 06/2012 A copy of the approved permit must be on the job site at all times. Yes No General Description of Work (In accordance with Ord. No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) General Contractor Project Name/Location or address Contact # E-mail address to return permit E-mail address: Telephone #: Representative: Franchise Company: (for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete)  CHARTER SPECTRUM   5(3/$&('$0$*('8*&$%/(,152: $//%25( &DEOHQHHGVUHSODFHGIURPWDSDWJUHHQULGJHGUWRWDSDWJUHHQULGJHGU&DEOHLVFXWXQGHUQHZ DOOH\GULYHZD\DWIWIURPWDSDQGIWIURPWDS1HHGVDSSUR[IWWRUHSODFH *5((1%5,'*('5 &5266675((7+,//+$9(1'5 KINETIC SOLUTIONS LLC 972-832-7665 KEVIN_PIATT@KINETIC-ENG.COM LYLE.BRADLEY@CHARTER.COM 214-846-5286 LYLE BRADLEY Right-of-Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. ¾Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 ¾Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE:Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. ¾Attach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov. ¾NOTE:Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Comments Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) DateSignature of City Representative DateSignature of Contractor Representative DateSignature of Utility Company Representative KEVIN PIATT LYLE BRADLEY 24 June 2019 Coordinate access to private property with all residentsadjacent to work area prior to beginning construction.