Loading...
Waterside P2-CN 920831 CONTRACT DOCUMENTS GRADING IMPROVEMENTS FOR WATERSIDE ESTATES NO. 2, PHASE II CITY OF COPPELL, DALLAS COUNTY, TEXAS AUGUST, 1992 OWNER STANDARD PACIFIC OF TExAs, L. P. 5525 MACARTHUR BOULEVARD, SUITE 580 IRVING, TEXAS 75238 (214) 550-0426 ENGINEER DAN M. DOWDEY AND ASSOCIATES, INC. CIVIL ENGINEERS 16250 DALLAS PARKWAY, SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 INDEX CONTRACT AGREEMENT PROPOSAL INSURANCE CERTIFICATE AMENDMENT TO GENERAL CONDITIONS GENERAL CONDITIONS SPECIAL CONDITIONS AND TECHNICAL SPECIFICATIONS ! CONTRACT AGREEMENT i This Agreement is dated the ~/~day of p~.~ ~$ ~ , 1992 by and between Standard Pacific of Texas L. (hereinafter called Owner) and Brazes Valley Contracting Co., (hereinafter call the Contractor). i Owner and Contractor, in consideration of the mutual · covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK Contractor shall complete all Work as specified or indicated in 'the Contract Documents. The work is generally described as follows: Grading Construction for Waterside Estates No. 2, Phase II reflected in the construction plans entitled "Construction Plans for Waterside Estates No. 2," , County, and prepared by Dan M. Dowdey Coppell Dallas Texas and Associates, Inc. ' ' The project for which the Work under the Contract Documents may be the whole or only a part is generally described as Waterside Estates No. 2. ARTICLE 2. ENGINEER The Project has been designed by Dan M. Dowdey and Associates Inc 16250 Dallas Parkway Suite 100 Dallas Texas , , , , 75248, (214) 931-0694, (hereinafter call the Engineer) and who will assume all duties and responsibilities and will have the rights and authority assigned to Engineer in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents· ARTICLE 3. CONTRACT TIME COMPLETION. The work will be substantially completed on or before Twenty-Five (25) working days following Contractor's reCeipt of Written Notice to Proceed, and completed and ready for final payment in accordance with the General Conditions on or before ~z~ ~ ,1 992. ARTICLE 4. CONTRACT PRICE Owner shall pay Contractor for performance of the work in accordance with the Contract Documents in current funds as follows: ARTICLE 5. PAYMENT PROCEDURES Contractor shall submit application for payment in accordance with Artice 14 of the General Conditions. Applications for payment will be 'processed by the Engineer as provided in the General Conditions'. 5.1 PROGRESS PAYMENTS: Owner shall make progress payments on account of the Contract price on the basis of Contractor's applications for payment as recommended by Engineer and approved by Owner on or about the Friday following the 10th of each month during construction as provided below. All progress payments on the work measured by the schedule of will be the basis of values provided in paragraph 14.1 of the General Conditions. 5.1a. Prior to substantial completion, progress payments will be made in the amount equal to 90% of the work completed only. Contractor's request for payment shall be as of the--25th day.- and shall be submitted to the Engineer no later than the last day of each month. 5.1b. Upon substantial completion, Owner shall pay (within 30 days of receipt of Engineers recommendation for payment) an amount sufficient to increase total payments to Contractor to ~0% of the contract price, less such amounts as Engineer and Owner shall determine in accordance with paragraph 14.13 of the General Conditions. 5.2 FINAL PAYMENT: Upon final completion and acceptance by the Engineer, Owner and reviewing agency of the Work in accordance with Paragraph 14.13 of the General Conditions, Owner shall pay the remainder of the contract price as recommended by the Engineer and Owner as provided in said Paragraph 14.13. ARTICLE 6. CONTRACTOR'S REPRESENTATION On order to induce Owner to enter into the Agreement, Contractor makes the following representations: 6.1 Contractor has fam'iliarized themselves with the nature and extent of the Contract Documents, Work locality and with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress, or performance of the Work.' 6.2 Contractor has studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affectinq cost, progress, or performance of the work which were relied upon by the Engineer in the preparation of the Drawing and Specifications and which have been identified in the Supplementary conditions. 6.3 Contractor has made or caused to be made examinations., investigations, and tests and studies of such reports and related data in addition to those referred to in Paragraph 6.2 as he deems necessary for the performance of the Work at the Contract Price, within the Contract Time, and in accordance with other terms and conditions of the Contract Documents; or other similar data are or will be required by Contractor for such purposes. 6.4 Contractor has correlated the results of all such observations, examinations, errors or discrepancies that he has discovered in the Contract Documents~ and the written resolution thereof by Owner is acceptable to Contractor. 6.5 Contractor has given Engineer and Owner .writ~en'.notice of all conflicts, errors, or discrepancies that he has. discovered- in the Contract Documents and the written resolution thereof. by Owner is acceptable to Contractor. 6.6 All liens of the contractor and any right to remove removable improvements are subordinate 'to the Mortgage and Lender's rights and all subcontracts 'and purchase' orders shall contain a provision subordinating the subcontractors' and Materialmen's liens and any right to remove -removable improvements to the Mortgage and Lender's rights thereunder. No change order shall be effective without the prior written approval of the Lender except for permitted scope changes. ARTICLE 7.0 CONTRACT DOCUMENTS The Contract Documents which com~'rise the entire agreement between the Owner and Contractor are attached to this Agreement, made part hereof, and consist of the following: 7.1 This agreement; 7.2 Contractor's Bid 7.3 Insurance in the amount reflected in attached certificates 7.4 Amendments to General Conditions; 7.5 General Conditions 7.6 Special Conditions and Technical specifications; 7.8-Drawings (sheet I to 28); COVER $~EET WATERSIDE ESTATES'No. 2, PHASE I I Cover Sheet 2-3 Final Plat 4-11 Street Paving .12-13 Alley Paving 14-20 Storm Sewer 21-23 Water and Sanitary Sewer 24-27 Grading ~28 Utility Conduit Layout 7.9 Any modifications, including Change Orders, duly delivered after execution of Agreement. There are no Contract Documents other than those 'listed '~bove in this Article 7.0. The Contract Documents may only .be altered, amended or repealed by modification (as defined in' Section I of the General Conditions). ARTICLE 8. MISCELLAREOUS 8.1 Terms used in the Agreement which are defined in Article 1 of the General Conditions shall have the meanings indicated in the General Conditions. 8.2 No assignment by a party of hereto of any rights under or interests in the Contract Documents will be binding anokher party hereto without the written consent of the party sought to be bound; and specifically but without limitations, moneys 'that may become due and moneys that are due may not be-assigned without such consent (except to the extent that the.,effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written-consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. Not withstanding the foregoing, assignment of any are all rights and interests by the Owner to Owner's development lender is hereby approved by Contractor. Contractor hereby agrees to subordinate any mechanic's or materia!man's liens to the development loan. 8.3 Owner and Contractor each binds himself, his partners, successors, assigns, and legal representatives to the other partners, successors, assigns and legal party hereto, h±s representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. ,_,' ARTICLE 9. OT~ PROVISIONS IN WITNESS WHEREOF, the parties hereto signed this Agreement in triplicate. One counterpart each has been delivered to Owner, Contractor and Engineer. All portions of the Contract DocUment have been signed or identified by Owner and Contractor or by Engineer on their behalf. This Agreement will be effective on the ~- day of ~~S~ , 1992. co c o : Standard Pacific of Texas, ~ Brazos Valley Contracting 5525 MacArthur Blvd., Suite 580 Route 7, Box 327 Irving, Texas 75038 Waco, Texas 76705 Michael Brady ~/ Division Presiderct (214) 550-0426 (817) 875-2552 WATERSIDE ESTATES NO. TWO COPPELL, TEXAS EXCAVATION Unit Quantity Price Amount Unclassified Street, Alley 21,568 C.Y. $ 1.30 $28,038.40 and Lot Excavation ~inal Lot Grading Tolerance (-0.10' to +0.30') Full Width Benched Pad 68 Lots 175.00 11,900.00 Undercut pad areas C.Y. $ 1.30 Clearing & Disposal I L.S. $3,190.00 3,190.00 Total $43,128.40 Working Days = 25 * Note: I . Street and alley excavation to be 0.10'_+ of design elevation. 2. Contractor is responsible for restaking expense in the event stakes are destroyed. 3. A $100.00 per day penalty will be. incurred on the Contractor if the work is not in the completed said amount of working days. 4. Quantity for Undercut & Rework area to be determined by field verification by Engineer. 5. Clearing and Disposal per hourly rates as follows: Loader 20 hours @ $ 55.00 = $ 1 ,100.00 Dump Truck 20 hours @ $ 30.00 = 600.00 Burner = 500.00 Loader for Burner 18 hours @ $ 55.00 = 990.00 Total = $ 3,1 90.00 1 JO8 = WATERSIDE I I Phase ...... ( '~' - ~ S'T m T ................ ' ~ ............... AREA bP .~t- ~ ER °pTNG) RE~ION LAYER MATERIAL SECT~ TOTAL CUT FILL L. UI FILL .............................................. ALLEY "E" - NAT'L GROUND ct' ' ' ......... . .... 0 0 .,JI TABLE 0 o0 4(])01 4001 ~88 ALLEY "D- 1" NAT ' L GROUND SU£ TABLE 0.00 39 (::, 39 0 1 ALLEY "D-,°'' NAT'L GROUND SUITABLE 0.00 840,'7 1159 t;'48 17 SUB TOTAL: NAT'L GROUND SUITABLE 13433 9'755 36.,-'~ 49,7-. BLOCK 'IA" LOT 81 NAT'L GROUND SOl TABLE 0.00 0 0 0 0 0 BLOCK "A LOTS 1-~C) NAT _ GROUND SUTTABLE. (]:. C,C) ~i8~54 118c,'-~?._... -'"'" ...... ~: /..J ~41=',-, BLOCK 'mB" LOTS 1-11 NAT _ GROUND SUITABLE 0.00' ' C', 0 0 C' BLOCK "C" LOTS 1- 1'3 NAT _ GROUND SUITABLE C". 0C, ':}- 0 0 0 BLOCK "D" LOTS 1 -~0 NAT_ GROUND ..,_cii .~'~,', ~:.~ ~,_,,_~_= 0 . (]x} 0 0 0 r;... 0 --BLOCK""D" LOTS ~1 '36 NAT_ GROUND SUITABLE '--(~]-00 7 ...... i-4'~830 ~5160 181670 b~.~' o, 815F' BLOCK "D" LOTS 37-4,_') NAT _ GROUND SUITABLE 0 00 ~ 34079 5097 ~898;-:' 91 168(i: BLOCK "E" LOTS 1-8 NAT _ GROUND SOl'FABLE 0.00 i-' 66961 318'70 35091 758 644 BEOCK "F" LOTS 1 iO NAT _ GROUND SU!'T'ASLE ...... (])-/71:('.') .......... 0 0 0 -(.:) .... 0 BLOCK "F", LOTS 11-~0 NAT _ GROUND SUITABLE 0.C)0 1(}687:3 38530 68P243 754 1888 · . BLOCK "F", LOTS ~1-30 NAT _ GROUND .... _~,JI]'ABLE 0 0(') 1~$185 8(':889 43~36 ~389 --BEOCK "F , LOTS' 31"39 NAT _ GRO'JND SUITABLE 0.00 ;' .) 0 0 0 C., SUB 'TOTAL: NAT ' L GROUND SUITABLE 6973~8 300~53 397(2)69 9'388 18858 CHELSEA BAY NAT L GROUND SUiTA., L._E ...... .; ,., 0 0 GREENWAY COURT NAT'L GROUND SUITABLE : 1.()(]: ~'! ' 9986 9986 0 1!85 0 GREENWAY DR. "EAST'I NAT ' L GROUND SUITABLE 1 . 00 ~ .... 0 ". ) 0 0 0 GREENWAY DR. "WEST" NAT'L GROUND SUITABLE ' '1.00 ~: 38~i4 3356Ci 4654 34(:)7 131 SUB TOTAL: NAT'L GROUND' SUITABLE ~ "$8.~00 43546 4654 453~ 131