YMCA-CS 990910 Coppell. Texas 75019
//~"~/~ The City With A Beautiful Future 972-462-0022
k,,...~// //_.._.~/ PO. BOX478
~Z2~~ CO~'~'~l,T~ XAS 7~019
September 10, 1999
Mr. Rannie Hampton FILE
Hill & Wilkinson, Inc.
11969 Plano Rd., Suite 190
Dallas, TX 75243
RE: YMCA
Final Acceptance
Dear Mr. Hampton:
A final inspection of paving and utilities for the referenced project has been confLrmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Construction Inspector
cc: Mike Martin, Assistant City Engineer
Doug Stevens, Engineering Technician
Glenn Holloweli, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
davistymcafac