Loading...
Vista Ridge Addition- The Plaza-Lt 3R PT060331Mike Brown Services, Inc 817-881-5991 (Mobile)mbs0336@att.net 817-473-0336 (Office)4401 CR 617 817-477-3318 (Fax)Alvarado, TX 76009 Expected Commencement Date:Estimate Date: Expected Completion Date:October 30, 2018 Project Name:Questcare Water/Fire 100' 6" Fireline w/fittings Total Water/Fire 2$ 220' 4" Fireline w/fittings Layout 880.00$ 6" SS Riser Trench Safety 550.00$ 4" SS Riser Spoil Removal 1,500.00$ 4" Remote FDC Subtotal 26,435.00$ 120' 2" Waterline 2" RPZ w/"Hot Box" Sewer 70' 6" SDR-26 w/fittings Total Sewe 8,710.00 $ 70' 4" SDR-26 w/fittings Layout 280.00$ Trench Safety 560.00$ Spoil Removal 350.00$ Subtotal $ 9,900.00 Storm 2 - 5' Curb Inlets Total Storm 12,309.32$ (No pipe included as plan shows existing pipe)Layout 100.00$ Trench Safety 300.00$ Spoil Removal 325.00$ Subtotal 13,124.00$ 1 Total 52,923.06$ Notes: - This quote must be added to any contract as an exhibit. - All utilities to end 5' outside building slab. - Bonds are not included in bid price. - If a bond is necessary, a 10 day notice is required. - If additional insurance is required, it will be provided at additional cost. - Material prices are good for 30 days only. - Impact, tap, and inspection fees are not included in bid price. - All taps are priced for PVC, unless stated above. - CG is responsible for providing metered water, usable for back fill and compaction. - Concrete and asphalt removal and/or replacement is not included in bid price. - No D.O.T. permits are included in bid price. - No Traffic Control included in bid price. - If rock is encountered, additional charges will incur. - Any changes or additions will result in additional charges. - The overhead fire contractor will be responsible for stamped approval of fire plan. - For stand alone FDC, Mike Brown Services, Inc. will provide brass plugs. If anything different is required, there will be an additional charge. - Any bid with 4" sewer must have a minimum 2% grade. If less than 2% is required, the GC or Property Owner will be responsible for any problems or corrections that arise. - Materials damaged on or stolen from the jobsite will be replaced at the General Contractor's expense. - There is no warranty against damages once material has been installed. If damage occurs, there will be an additional charge for repairs. - If daily work hours have any restrictions, this could affect the bid price. - Any additional labor expenses incurred due to information missing from plans will be the responsibility of the GC. 2