Loading...
Waterside P1-CN 920401 CONTRACT DOCUMENTS PAVING IMPROVEMENTS FOR WATERSIDE ESTATES NO. 2, PHASE I -- CITY OF COPPELL, DALLAS COUNTY, TEXAS _ -April, 1992 OWNER STANDARD PACIFIC OF TEXAS, ~ 5525 MACARTHUR BOULEVARD, SUITE 580 -- IRVING, TEXAS 75238 (214) 550-0426 ENGINEER DAN M. DOWDEY AND ASSOCIATES, INC. CIVIL ENGINEERS -- 16250 DALLAS PARKWAY, SUITE 100 DALLAS, TEXAS 75248 (214) 931-0694 -- INDEX CONTRACT AGREEMENT -- PROPOSAL INSURANCE CERTIFICATE AMENDMENT TO GENERAL CONDITIONS GENERAL CONDITIONS SPECIAL CONDITIONS AND TECHNICAL SPECIFICATIONS CONTRACT AGREEMENT This Agreement is dated the day of MAg , 1992 by and between Standard Pacific of Texas L. P~ ~hereinafter called Owner) and Tiseo Paving Company, (hereinafter called -- the Contractor). Owner and Contractor, in consideration of the mutual _ covenants hereinafter set forth, agree as follows: ARTICLE 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents. The work is generally described -- as follows: Paving Construction for Waterside Estates No. 2, Phase I reflected in the construction plans entitled "Construction Plans for Waterside Estates No. 2, Phase I," _ Coppell, Dallas County, Texas and prepared by Dan 'M. Dowdey and Associates, Inc. The project for which the Work under the Contract Documents -- may be the whole or only a part is generally described as Waterside Estates No. 2, Phase I. _ ARTICLE 2. ENGINEER The Project has been designed by Dan M. Dowdey and Associates, Inc., 16250 Dallas Parkway, Suite 100, Dallas, Texas 75248, (214) 931-0694, (hereinafter call the Engineer) and who will assume all duties and responsibilities and will have the rights and authority assigned to Engineer in the Contract -- Documents in connection with completion of the Work in accordance with the Contract Documents. _ ARTICLE 3. CONTRACT TIME COMPLETION. The work will be substantially completed on or before Twenty (20) working days following Contractor's -- receipt of Written Notice to Proceed, and completed and ready for' final payment in accordance with the General Conditions on or before ~fA , 1992. ARTICLE 4. CONTRACT PRICE _ Owner shall pay Contractor for performance of the work in accordance with the Contract Documents in current funds as follows: Two Hundred Twenty Four Thousand Four Hundred Thirty One and 50/100 ($224,431.50). ARTICLE 5. PAYMENT PROCEDURES -- Contractor shall submit application for payment in accordance with Artice 14 of the General Conditions. Applications for payment will be Processed by the Engineer as provided in _ the General Conditions. 5.1 PROGRESS PAYMENTS: Owner shall make progress payments on account of the Contract price on the basis of Contractor's applications for payment as recommended by Engineer and approved by Owner on or about the Friday following the 10th of each month -- during construction as provided below. All progress payments will be on the basis of the work measured by the schedule of values provided in paragraph 14.1 ~of the General Conditions. 5.1a. Prior to substantial completion, progress payments will be made in the amount equal to 90% of the work completed only. Contractor's - request for payment shall be as of the 25th day and shall be ~submitted to the Engineer no later than the last day of each month. 5.1b. Upon substantial completion, Owner shall pay (within 30 days of receipt of Engineers recommendation for payment) an amount sufficient -- to increase total payments to Contractor to 90% of the contract price, less such amounts as Engineer and Owner shall determine in accordance -- with paragraph 14.13 of the General Conditions. 5.2 FINAL PAYMENT: Upon final completion and acceptance ~ by the Engineer, Owner and reviewing agency of the Work in accordance with Paragraph 14.13 of the General Conditions, Owner shall pay the remainder of the contract price as recommended by the Engineer and Owner as provided in said Paragraph 14.13. ARTICLE 6. cONTRACTOR'S REPRESENTATION On order to induce Owner to enter into the Agreement, Contractor makes the following representations: 6.1 Contractor has familiarized themselves with the nature and extent of the Contract Documents, Work locality and with all local conditions and federal, state and local laws, ordinances, rules and regulations that in any manner may affect cost, progress, or performance of the Work.' 6.2 Contractor has studied carefully all reports of investigations and tests of subsurface and latent physical _ conditions at the site or otherwise affecting cost, progress, or performance of the work which were relied upon by the Engineer in the preparation of the Drawing and Specifications and which have been identified in the Supplementary conditions. 6.3 Contractor has made or caused to be made examinations, investigations, and tests and studies of such reports and related _ data in addition to those referred to in Paragraph 6.2 as he deems necessary for the performance of the Work at the Contract Price, within the Contract Time, and in accordance with other terms and conditions of the Contract Documents; or other similar - data are or will be required by Contractor for such purposes. 6.4 Contractor has correlated the results of all such -- observations, examinations, errors or discrepancies that he has discovered in the Contract Documents and the written resolution thereof by Owner is acceptable to COntractor. 6.5 Contractor has given Engineer and Owner written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents and the written resolution thereof -- by Owner is acceptable to Contractor. 6.6 All liens of the contractor and any right to remove _ removable improvements are subordinate to the Mortgage and Lender's rights and all subcontracts and purchase orders shall contain a provision subordinating the subcontractors' and Materialmen's liens and any right to remove removable - improvements to the Mortgage and Lender's rights .thereunder. No change order shall be effective without the prior written approval of the Lender except for permitted scope changes. ARTICLE 7.0 CONTRACT DOCUMENTS The Contract Documents which comprise the entire agreement between the Owner and Contractor are attached to this Agreement, made part hereof, and consist of the following: - 7.1 This agreement; 7.2 Contractor's Bid 7.3 Insurance in the amount reflected in attached certificates -- 7.4 Amendments to General Conditions; 7.5 General Conditions 7.6 Special Conditions and Technical specifications; 7.8 Drawings (sheet I to 28); COVER SHEET WATERSIDE ESTATES NO. 2, PHASE I I Cover Sheet 2-3 Final Plat 4-11 Street Paving - 12-13 Alley Paving 14-20 Storm Sewer 21-23 Water and Sanitary Sewer - 24-27 Grading 28 Utility Conduit Layout 7.9 Any modifications, including Change Orders, duly delivered after execution of Agreement. - There are no Contract Documents other than those listed above in this Article 7.0. The Contract Documents may only be altered, amended or repealed by modification (as defined in _ Section 1 of the General Conditions). ARTICLE 8. MISCELLANEOUS 8.1 Terms used in the Agreement which are defined in Article I of the General Conditions shall have the meanings indicated in the General Conditions. 8.2 No assignment by a party of hereto of any rights under _ or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically but without limitations, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. Not withstanding the foregoing, assignment of any are all rights and interests by the Owner to Owner's development lender is hereby approved by Contractor. Contractor hereby agrees to subordinate any mechanic's or materialman's liens to the development loan. 8.3 Owner and Contractor each binds himselft his partners, successors, assigns, and legal representatives to the other party hereto, his partners, successors, assigns and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. ARTICLE 9. OTHER PROVISIONS _ IN WITNESS WHEREOF, the parties hereto signed this Agreement in triplicate. One counterpart each has been delivered to Owner, Contractor and Engineer. Ail portions of the Contract Document have been signed or identified by Owner and Contractor or by - Engineer on their behalf. This Agreement will be effective on the [~ ~- day of - , 992. -- OWNER: CONTRACTOR: Standard Pacific of Texas, ~ Tiseo Paving Company _ 5525 MacArthur Blvd., Suite 580 P.O. Box 270040 Irving, Texas 75038 Dallas, Texas 75227 Michael Brady / Arthur Tiseo -- Division President President (214) 550-0426 (214) 289-0723 1. ContraCtor is responsible for restaking expense in the event -- stakes are destroyed. 2. Contractor is responsible for replacing disturbed areas to - ±0.2 feet of proposed grade. -- PHASE I WATERSIDE ESTATES NO. 2 COPPELL, TEXAS ITEM UNIT ~'O. DESCRIPTION UNIT QUANTITY PRICE AMOUNT PAVING . 6"- 3000 P.S.I. Reinforced Concrete Pavement Complete and in place S.Y. 9,862 13.75 135,602.50 . 6"- 3600 P.S.I. Reinforced Conc. Alley Pvmt. _ Complete and in place S.Y. 392 15.75 6,174.00 . Brick Pavers complete and in place S.F. 320 5.60 1,792.00 .. 6" Lime Stabilized Subgrade complete, in place S.Y. 11,074 1.50 16,611.00 ,. Hydrated Lime (27 lbs./S.Y.) Complete Ton 1 50 78.00 11,700.00 -~. Street Header L.F. 56 5.00 280.00 7. Street Barricade L.F. 56 17.00 952.00 ~. Sawcut Existing Concrete and Connection of Conc. Pavement Thereto, Complete L.F. 100 3.50 350.00 ). Payment & Performance Bonds L.S. 1 2000.00 2,000.00 TOTA3~ PAVING 17~, 461.50 PHASE I-A WATERSIDE ESTATES NO. 2 COPPELL, TEXAS ITEM UNIT --40. DESCRIPTION UNIT QUANTITY PRICE AMOUNT PAVING · 6"- 3000 P.S.I. Reinforced Concrete Pavement _ Complete and in place S.Y. 2,580 13.75 35475.00 !. 4"- 2000 P.S.I. Reinforced Concrete Sidewalk -- Complete and in place S.F. 1,960 2.00 3920.00 3. Brick Pavers complete and _ in place S.F. 180 5.60 1008.00 6" Lime Stabilized Subgrade _ complete, in place S.Y. 2,78.6 1.50 4179.00 i. Hydrated Lime (27 lbs./S.Y.) Complete Ton 38 78,00 2964.00 ;. Street Header L.F. 28 5.00 140.00 2' Street Barricade L.F. 28 17.00 476.00 Sawcut Existing Concrete and Connection of Conc. Pavement -- Thereto, Complete L.F. 88 3.50 308.00 Payment & Performance Bonds L.S. I 500.00 500.00 _ TOTAL PAVING 48,970.00 SPECIAL CONDITIONS 1. These prices are based on no move-in for excavation work, no for utilities, one move-in for stabilization, and one move-in for paving operation. Each additional move-in will be $2,500.00 per move-in. 2. Dirt contractor is to compact subgrade to project specifications and bring rough grade to plus or minus one- tenth of a foot. 3. Utility contractor is to get compaction in all utility trenches, clean up his excess excavation and bring rough grade to plus or minus one-tenth of a foot prior to our moving on the job. 4. Retainage will be paid in full upon measuring for final quantities and acceptance of our work by the City of Coppell. 5. Items will be measured to determine quantities for final payment. 6. Inlet throats, inlet leaveouts, and variable height curbs are not included in bid. 7. Manholes, cleanouts, and water valve final adjustments are not included in bid. Each final adjustment is priced as' follows: Manholes ................. $350.00 Cleanouts ................. $150.00 Water Valves .............. $150.00 8. This proposal is submitted with the understanding that the owner's credit and financial arrangement for making payment is satisfactory to Tiseo Paving Company. If payment, performance, or maintenance bond are required add 1 EXCLUSIONS: Staking Permits Inspections Rock Exc. Seeding Testing Lot Sloping Conc. Flume Taxes Removal of Dirt Rolling For Comp. Fill AMENDMENTS TO GENERAL CONDITIONS ARTI CL£ 1. Application for Payment: Add "and O~erw after 'Engineer". Change Order: Add wand Owner" &fret "Engineer". Field Order: Add 'and Owner'sw after 'Engineer's". Substantial Completion: Add Sand Owner" after 'Engineer" the - first time.it appears. Work Directive Change: Add "and Owner" after "Engineer". ARTICLE 2. Paragraph 2.3, first sentence: Change _ ~Xifteenth". Paragraph 2.3, second sentence: Change "thirty" to 'fifteen". -- Paragraph 2.6: Add Band Ownerw &fret uZngineer". Paragraph 2.8: Add Wand Owner' after UZngineer". -- Paragraph 2.9, second sentence: Add Band Owner" after "Engineer" · he first time it appears. ARTICLE 3. Paragraph 3.2, Last sentence: Add Wand Owner" after 'Engineer". ~aragraph 3.3: Add mend Ownerw mfter 'Engineer" save sad except Paragraph 3.5.2: Add 'and Owner" after 'Engineer". Paragraph 3.5.3: Add wand Owner" after 'Engineer". ARTICLE 6. Paragraph 6.5, second sentence: Add "or Owner" after "Engineer". _ Paragraph 6.6: Add wand Ownerw after 'Engineer". Page 2 of 4 Pages Amendments to General Conditions Paragraph 6.13: Change the first sentence to read, "Unless -- obtain and pay for all construction peri, ts, licenses, insurance other fees necessary to construct these ~mprovements but not city inspection fees". Paragraph e.20, last sentence: Add 'and Owner" after 'Engineer- and delete uO~er and". _ Paragraph 6.22: Add "and Owner" after 'Engineer" save and except tn the first sentence. ARTICLE 7. Paragraph 7.3: Add 'and Owner" after aEngineer". ARTICLE 8. Paragraph 8.1: Add 'or advise Engineer of communications Contractor~ at t~he end of the sentence. Paragraph 8.2: Delete 'against whom Contractor ~akes reasonable objection: and delete last ,entente in its entirety. _ ARTICLE 9. Paragraph 9.3: Change ail Owner and ~ngineer agree...~ to Owner Bgrees...u. Paragraph 9.5: Add 'and Owner Jointly: after '£ng~neer'. Paragraph 9.6: Add 'a~d Owner" after wE~gineer". Paragraph 9.10, first sentence: Add aand Owner" after Paragraph 9.10: Change the last sentence to read "Engineer's and Ow~er'~ written decisions thereon w~]l be final and binding upon Owner and Contractor'. Paragraph 9.11= Add aand Owner~ after UEngJneer" ~ave and except in the first sentence. - ARTICL£ 10. Paragraph 10.4.3: Add "and Owner" after mEngineern. - ARTICLE 11. Paragraph 11.2: Add 'and Owner" after 'Engineer". Paragraph 11.7: Add 'and Owner" after Page 2 of 4 Pages Amendments to General Cond~tions Paragraph 11.8, last sentence: Add #and Owner" &f=er "Engineer-. Paragraph 11.9.1: Add eand Owner- after eEngineer-. ART~CL£ 12. Paragraph 12.1: Add mand Owner,, after mEngineer". A~TICL£ 13. Paragraph ~3.4, first sentence: Add "and O~er" al=er "Engineer,,. -- Paragraph ~3.6: Change the paragraph to read 'If any Work (including the work of others) ~hat is ~o ~ insetted, ~es=e~, or a~rove~ ~s covere~ wL~hou~ wrL~en concurrence of ~g~meer, i= ~us~, _ if re~u~s~e~ by ~gLneer of ~er, ~ u~covered ~or obse~a~Lon. Such ~coverlng shall ~ It Con~ac=or's ~arsgra~h ~3.8: A~ mot ~er" sf~er ~gLneern ~he firs= ~wo _ tL~e i~ I~ars in the sentence. Paragraph 13.9: Change ~e firs= sen=ante ~o read "--.Con=factor, B~ E~g~neer's or ~er's revues=, shal~ -- expose, or o~herwise make available for obse~a~Lon, /ns~ctio~, or %es~tng ns Engineer or ~er may require...-. ~le=e ~e sentence in t~ entirety. -- Paragraph 13.1~: Add mot ~erm after m~gineer~ ~e second ~ appears. Paragraph ~3.14: A~d mot ~ner" after mEngineer" save and except -- the ~irs~ ~i~e i~ spears. ~TI CLE 14. Paragraph 14.1: Add mand ~er" after m~ngineer". Paragraph ~4.8: Change mseven daysW ~o U=en days" and change the ~ast sentence ~o rea~ m...w~21 M binding on Con~rac~or un~il Paragragh 14.12: A~d mand ~er" al=er mEng~neer". _ Paragraph 34.~3, 1B5~ sentence: A00 'and ~er's" al=er Page 3 of 4 Pages A~endments to Genera! Conditions ART! CLE 1.5. Par&gral~h 15.2w las't: sentence: Add Band Owner~ after aEngineer-. Paragraph 25.5: ~le~e ~n ~ts en~re~y. Page 4 of 4 Pages A~end~ents to General Conditions Th~ dncumrn! bus Ilma-~Or~a.I Ic~.,I COhb~qutnCCS~ cofl~uliuhun ~ll, Mn ~ltornt)' i~ cncour~gcd W~lh GEN~~ CO~ITIONS - OF CONSTRUC~ON CON~CT Prepared by _ ~n~ineers' 3o~nt Contract ~ocumcnts ~omm]ttce Issued and Published Jointly By PROFESSIONAL ~NGINEERS IN PRIVATE P~ICE A practice ~ivision Of the ~ATIONAL SOCIETY OF ~ROFESSIONAL ENGINEERS AMERICAN CONSULTJNG ENGINEERS COUNCIL AMERICAN SOCIETY OF CIVIL £NGINEERS CONSTRUCTION SPECIFICATIONS INSTITUTE This documcn! h:)s been approved and endorsed ~y _ ~:':~ T~ AssociatedGcnt~~ Con~taclors Thc~c General Condilion~ have been prepared for usc with Ibc Owner-CoRe.clot A~rccmtnts (No. Igl0.I-A.I or 19J~I.A-2, 19K} eddipn~). Thole ptovislons arc ~te~rtbted and I en AGrcrmcnlsJm ~iKer;n~ Scrvicc~ end Contracl Dacumrm~. No. 191~. I~Jl edi6on. For luidancc in Iht proportion of Su~plrmcnla~ Cond,slons. uc Guidc Io Iht Ptcparalion of Supple. mcmax). Condisioas INa. 1910-1~. IV~} ed,6on) ~'hcn bidding i~ ~volvcd. Iht SI3~atd Form I~qtrur~,on~ Io D~dcrs (No. 1910 12.1~3 cddionl may ~ Soo;ct y o1' PTorcbs;0~1 Stfcct. Iqlcw Yefk.~Y IOC)i"/ SI.. AIc- ahdr~,. VA 22214 TABLE OF CONTE~FTS OF GENEP. AL CONDITIONS Article Humber Title Page 1 DEFINITIONS 1 -- 2 PRELIMINARY I,tATTERS 2 3 CONTRACT DOCUMENTS: INTENT, AMENDING AND REUSE 3 4 AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS 4 5 BONDS AND INSURANCE 5 6 CONTRACTOR'S RESPONSIBILITIES 8 7 OTHER WORK 12 -- 8 OWNER'S RESPONSIBILITIES 13 g ENGINEER'S STATUS DURING CONSTRUCTION 13 - lO CHANGES IN THE WORK 15 11 CHANGE OF CONTRACT PRICE 15 12 CHANGE OF CONTRACT TIME I8 13 WARRANTY AND GUARANTEE; TESTS AND ~- INSPECTIONS; CORRECTION, REMOVAL OR , ACCEPTANCE OF DEFECTIVE WORK 18 14 PAYMENTs TO CONTRACTOR AND COMPLETION 20 15 SUSPENSION OF WORK AND TERMINATION 23 - 16 ARBITRATION 25 17 MISCELLANEOUS 26 INDEX TO GENERAL CONDITIONS ~ Arlirl¢ or Ni~nbcr Accept:race or ln.,,ur:.mcc ............................. 5.13 Contruclor's W;,rr;mty of'title ........................ 14.3 Ac,'¢~.,, Itl thc Work .................................. 13.2 Contraclorx.~other ...................................... 7 Addcnd;~--..dcfinition of. (sec dcfinilion of Conlructu:d Li~bility Insurance ........................ 5.4 ~.'~.'ific:~tion,,) ........................................ I Coordin:din~ Conlractor--dc~nhion or ................ 7.4 Al: fcc mc n[---,J¢l~ nit ion or ................................ I Coordin~lion .......................................... 7.4 All Ri,,k. In,,ur;mcc ............. :.- ...................... 5.6 Copies or Documents .................................. 2.2 Am,.'ndmcnt. Written ............................. I. ~. I. I CorTcclion or l~cmov.',l of. Dcrcc[ivc Work ........... 13. I I Applic:di~n r,,r P~)'mcnt---dcfinilion of. .................. I Correction Period. One Year ........................ I~. ^pplic,lion for P~wmcnl. Final ...................... 14.12 Corrcction. Removal ur ^cccplancc ur Dcf.cclivc _ Apr~hculion roe Progrc~ P~)'mcnt .................... 14.2 Work--in general ........................... I~.11-1.~.14 ^r, rdic,(i~n roe Pr~gr¢.~ P;~ymcnt~rcview of .... 14.4-14.7 Co.~t~ncl dccrcusc ................................. 11.6.2 Arbitration ............................................. 16 CostofWurk .................................... 11.4-11.$ ^uthori,'cd V:,ri;,li~m in Work ......................... 9.$ Costs. Supplemcnt.',l ................................ I 1.4..~ ^v.:~rd. Notice or.--d¢th~(:d .............................. I F):w~d(:~nition of. ....................................... I Eh:fore ~lurlin[: C'onslru¢lion ...................... 2..5-2.7 Dc./'(,cdr; Work. Accepl~nce of ........ [ ............. I.I. 1.1 -- Uid--d¢~nition uf ....................................... I Dc./'~cti~'¢ Work, Correction or Removal of .......... 13. I I Ih,nd,, ;md In,,t,r-'mcc~in general ........................ .I /)c./'¢cti~'~' Work~|n general ............... I.I. 14.7. 14. I I H, ond,,---d(:tJnilion of' ..................................... I l)c./'ccli~'~' Work. Rejecling ............................. ¥.6 Itt,nd,,. I~:livcry or ............................... 2.1.5.1 Definitions .............................................. I -- Ihmd,,. Pcrf'orm[m(:e and f)thcr .................... .5.1.5.2 Delivery or Bonds ..................................... Dctermin-',l~on for Unh Prices ........................ 9. Itl ('~,,h Allowance.,, ..................................... I I.R D[spules. Decisions by Engineer ................. 9.1 I-9. I-~ (.'h'-mj:c ()rdcr.--dvRnhion t.ff ............................. I Documents. Coplcs or ................................. -~.2 - (.'h~m~:c ()rd~:r~.~lo ~.' cxcc.'ulcd ...................... 10.4 Documents. Record .................................. 6.19 (.'h;~n(c~.'., in Ibc Work ................................... i0 Documents. Rcu.~c .................................... -1.6 -- (.'l~.-;mmg ............................................. 6.17 E;~scmcnts ............................................ 4.1 (.~*~mpk.'lion ............................................. 14 EITcctJv¢ dixie ur Agreement---definition of ............... I (.'~,nlYrcn~:t.'. F'fcc~,m,,Iruclion .......................... .~.8 Engincer-~dcl~nhion (.'*f' .................................. I -- ('onn,ct. Error. Di,,crcp;mcy~Contraclor Engineer's Decisions ............................ 9. IO-9. I Io Repot1 ...................................... 2.5.3.3 Engineer's.--Nolice Work i.~ Accepluble ............. 14.1.1 (.'on~.lru¢lion Mu(:hincr¥. Equipmcnl. tlc .............. 6.4 Engineer's Recommendation of P:~ymcnt ...... 14.4, 14.1.1 Conlinuing Work ........... ~ ......................... 6.29 Engineer's Responsibilities. Limit;ition~ ,,~,pl',h.'mcndng .................................. 3.4-3.5 Engineer's $1:~tt~ During Con.,,lruction--in (.'~nlr;~Cl f.)~.'umcnt,,~dclinition or ...................... I Eq~,ipmcnt. L:~bor. M:,lcri;ds and .................. (.'umn~cl Pricc.~dcfinilion ............................... I Fcc, Conln~clor'.~--Cosls Plus ........................ I i.~, -- (.¥,nlr;~¢l Time. ('ommcnccmcnl or .................... 2..1 Field Ordcr~i.,,.~ucd hy Englncer ................ -1..~. I. ('onlr;~¢t Timc-.-d~.'linhion of ............................ I Fired Appl~¢[,IJ~n for P;~ym~.'nl ....................... 14. (.'~nltr;,~clor &l:ly Slop Work ur Tcrmin:~lc ............. !.f.5 Fin;d P:lymcnl '-md A~.'(.'¢r)l;inc¢ ...................... 14.1.1 -- (.'onlr;i~.'lof'.~ (.'onlinuing ()hlJg:~tlon .................. 14.15 Fin:d P:~ymcnl. Rc¢onlmcnd;~tion ur ........... 14.1.1-14.14 -~ (.'~mraclur'~ l.i:ihilily In~ur:mcc ....................... 5..1 C;cncr.'d Rcq~,ircmcnts~pri.¢ip;d Contra¢tor'~ RC~lx~nsihilitics---in ~¢ncral ................ 6 rcrcrcnccs Io ................. 2.6.4.4.6.4.6.6-6.7. ~..~.1 _ Giving Notice ........................................ 17.1 Payments to Contraclor--when due ........... 14.4. 14.13 Guarantee or Work--by Contractor ................... 13. I Payments to Contractor~wilhholdlng ................ 14.7 Peri'ormance and other Bonds ..................... $. I-5.2 Indemnification ................................. 6..30-6.32 Permits ............................................... 6.1.1 _ In-,p~.-cti~m. Fin:d .................................... 14. I I Physical Conditions ................................... 4.2 In',p¢ction. Tc,,Is and ................................. 13.3 Physica! Condifions--£ngineer's review ............. 4.2.4 In',urunce. Bonds and--in general ....................... .5 Physical Conditions--existing structure,: ............. 4.2.2 In,,ur:mce, Ccrtific:dcs of ........................... 2.7..~l Physical Conditions--explondion,: and reporls ....... 4.2. I _ In.,urance--contpletcd operations ...................... $.3 Physical Condilions--post, ible dt~cunlenl change ..... 4.2.~ In,,urancc. Contr:,ctor's Li:~hility ...................... $.3 Physical Conditions--price and time udju~,tments .... 4.2.5 In,,urunce. Contracluul Liability ....................... 5.4 Physic:d Conditions--report of.differing ............. 4.2.3 In,,urance. Owner',, Liability .......................... 5.5 Phy,,icul Conditions--Underground Facilities .......... 4..t __ Insurance. Pr~pcrty .............................. 5.6-5.13 Pr¢conslruction Conference ........................... In%urance--W:,ivcr o[ Rights ......................... 5.11 Prellminury Matters ..................................... Intent of Contr:~c! l')tx:urncnts ................... 3.3,9.14 Premises. Use of' ................................ 6.16.6.1x Imerprctution,. and C'larific:dions ...................... 9.4 Price. Ch;ingc or Conlracl .............................. I _ invc%tigations or phy.%icul conditions ................... 4.2 Prlcc-Contruct-.-dcFinition of ............................ I Progress Paymcnl. Applications for ................... 14.2 Labor. Matcriul~ and Equipment .................. 6.3-6.5 Progress Puymenl--rctalnage ......................... 14.2 Laws and Regulations--definition of ..................... I Progress schedule ............... 2.6.2.9.6.6.6.29. I.~.2.6 - Laws and Regulations.--general ....................... 6.14 Projccl----definition of .................................... I Liability In,,urunce~Contruclor's ..................... 5.:3 Project Reprcscnlation~provislon for ................. 9..1 Li;,bilily In,.urunce--Owncr's ......................... $.~ Project Representative. I{esidcnt---dcfiniti~m BI' .......... I Liens--definitions of' ................................ 14.2 Projecl, Starling Ihc ................................... 2.4 -- Limitations on Engineer's Property Insurance ............................... .~.6-.~.1.1 Rc.,,pon%ibilitics ..................... 6.6,9.11,9.13-9.16 Property Insuruncc--Purlial Utilizalion ............... 5.1.~ Property h~suruncc--l{¢ccip! and Application t, la~¢riuls and equipment--furnished by Conlractor .... 6.3 of' Proceeds ................................... .5.12-.~.1.3 -- F,t:~tcrials and equipment--not Prot¢clion, S;ffcty and ........................... 6.20-6.21 incorporated in Work .............................. 14.2 Punch list ........................................... 14. /~.laterial% or equipm~.-nl--cqulvalenl ................... 6.'/ F. tisceUaneous Provisions ............................... 17 Recommendation of Payment .................. 14.4. 14.1.1 - Ikluhbprime contracls ................................... 7 Record Documents ................................... 6.19 Reference Poinls ...................................... 4.4 Notice. Giving of. ..................................... 17.1 Rcgul:,ions. Laws -,nd ............................... '6.14 Notice or Accept:$hility of Project ................... 14.13 Rejecting/..)~,J'~,~-.'r~, Work ............................. 9.6 -- Notice of Award.--definillon of. .......................... I Roi;tied Work al Site .............................. 7. I-7..1 Notice to Procccd--dcfinhlon of ......................... I Rcmcdics Not Exclu~,ive ............................. 17.4 Nulicc Itl Pr{~.'~.-cd~giving ~f' .......................... 2..1 Rcm~w;d or Currc~.'ti~m ofl)~'J'r~'tir~' W~,'k ........... 1.1.11 Or-Equ~d*' Ilems ..................................... 6.7 }<¢sidcnl P~ujccl Rcpresenlutivc~pruvision ~ ........ ~/..I O~her cuntructor.~ ....................................... ? Responsibilities, Contructor'~---in general ............... is Other work .............................................. ? Responsibilities, Englnecr'~--in general ................. Overllm¢ Wurk--prohibhion olr ........................ 6.3 Re~ponsibilhies, Owncr's~in general .................... Ownc r-.-du'fi nillon BI' .................................... I Relaiflagc ............................................ 14..~ Owner May Currccl I),'J'4'rlire Work ................. 13.14 Reuse of' Documenls .................................. Owner May S~p Work .............................. 13.10 Righls ot' Way ......................................... 4.1 Owner M;~y Su,~pcnd Work, Tcrmlnnte .......... I.~.1-15.4 Royahics. Patent Fees and ........................... 6.12 ~- By. ncr's, Duly I%~ Execute Change Ordcrs ............. I 1.8 O~'ncr's Li;~hili~y In,,uranc¢ ........................... 5,~ Sul'~ly and ?r0[ecli0n ............................ By, ncr'.,, I'tcprcscnt;~tivc--Enginccr Io serve as ........ 9. I Samples ......................................... Owner's. I, tc~,r~Jn,,ihilities.--in general .................... I1 Schedule or progress ........ 2.6, 2.8.2.~. 6.6.6.2e, I.~.".e, -- ()v. m.-r's S,..'pural~: Rcprescnl:~live al ~..it¢ ............... 9.3 Schedulc of Shop Drawing submissions ...................... 2.6.3.11-2.9.6.23. 14.1 Parlial Utilizalion .................................. 14.10 Schedule or values ...................... 2.6.2.R.2.9. 14.1 _ Partial Ulilizalion-~d¢§nition ,Jr ......................... I Schedules. Finalizing .................................. Parli:d U~illzaliun~Propcrty In,ur. race ............... ~.15 Shop Drawings and Samples ..................... P~tcnt Fcc,, and Ruyuhic.~ ............................ 6.12 Shop Druwings---deRnition or ............................ I Pa~,'ment,,. I<e¢~,msmendutlon or ........... 14.4-14.7, 14.13 Sh~)p Drawings. use lo appr~we __ Pa)'menl~. lo Contrucl~r~in general .................... 14 lubstilulions ...................................... 6.7..3 Si,e. Vi,,it,, to-.-hy Engineer ........................... 9.2 Time. Compututlon of ................................ 1'/.2 .~pecilicati~m~,--..dcFinition of .............................I Time, Contr.',ct----dcfinition o1' ............................ I ~tnrlintz Cun%truction. B¢l'ore ...................... 2.5-2.8 -- Slarting Ibc Pro. jccl .................................... 2.4 Uncovering Work ............................... 1.1.8-1.~.9 Slopping Work--by Contraclor ....................... I$.$ Underground Facilities,--dcfinhion of .................... I Stopping Work--by Owner .......................... 13.10 Underground Facilities--not shown or indiculcd ..... 4..1.2 .~uhcontr;,clor--.-d~:finition of .............................I Underground Facilities--protection or ........... 4..1.6.2ti -- .%ubcuntr;lctors--in genera! ....................... 6.8-6. !1 Underground Facilities--shown ur indic;~tcd ......... 4..~. I Subcontracts--required provisions ............ 5. I !. I, 6. I I Uni~ Price Work---dc6nition of .......................... I Suh,~tuntiul Cumplction--¢ertif:ication of .............. 14.8 Unit Prices ......................................... I I.~. I ~ Suh~,t~lnti-',l C'omplction--dclinition o1' .................... I Unit Prices, Dcterminutions I'or ....................... 9. Suh,,titute or "Or-£quul" Items ....................... 6.'/ Use o1' Premises ................................. Suh%url'a~¢e Conditions ............................. 4.2-4..1 Utilil¥ owners .......................... 6.1~. 6.2tl. ?.2.?..1 Supr, lcmcnt~lry Conditions---definition o1' ................ I ¥-',lues. Schcdt,l¢ el' ......................... '~.6. _~.9. 14. I ~upplementur)' C~mditi~m~--princip.'d V-'~ri-',tions in Wurk~Aulhorizcd ............ 6.'~.~. 6.'*'I. ?.4.9.3 -- .~,pplcmcnting C~ntruct Documents ............... 3.4-3.5 Waivcr or Cl:llm.,~--on Fin:d P:l)'mcnl r. ·i'. ............. 14.16 Surpli~.'r--princip~d rcfcrcnccs Io ... 3.6.6.5, 6.'/-6.9, 6.20. Wilrranly :,nd Gu.'lrunlcc--hy C'untrucl~r ............. I.~. I Surcty--l'~nL:im.'cr h;~% n~ dray lo ..................... 9.13 Work--by others ........................................ 7 Surcty--m.~tice to .......................... I(1.1. 10.5. 15.2 Work Continuing During Di.~put¢.~ .................... Su,,pending Work. by Owner ......................... 15, I Work--dcRnition o1' ..................................... I Sut, pen*~iun of Work and Termination--in &eneral ....... 15 Work Directive Chung¢--<leRnilic)n o1' ...................I Superimcndcnt~Contractor's ......................... 6.2 Work Dircclivc Chunge--princip:d _. Supcrvi,,ion ,nnd Superintendence .................. 6.1-6.2 references !o ............................ ].4..1. 11.1.1-1l).2 Work. Negl¢cled by Contruclor ..................... 17,.14 '1.,~c,,--P-',ymcnl hy Contr~clor .~ ..................... 6. I$ Work. Stopping by Contr~ctor ........................ I.~..~ 'l'%-r min,~ion--hy Contrnctor .......................... 15.5 Work. Stopping by Owner ....................... I.~.1-1~.4 _ Tcrmin:,lism--hy Owner ......................... 15.2-1.5.4 Wriltcn Amendment--definition ur ...................... I Tcrmin,tiun..%u~pcn~it~n ed' Work und--in ~:eneral ...... 15 Writlcn AmcndmcnI--princip:d -- " G EN ERAL CONDITIONS ~,','f,'cti,.~,.-An ;,djecdv¢ which when modifying Ibc ~'ord refers to Work Ih.At is un~uli.~r;s(.'hsr¥, l'auhy ur d~'li~'i,'nt. ~r t%N I'IC'I.I~ I--I)I'~I:INI'I'I()NS does n~l cmll'~)rnl Io Ibc Conlrlscl l)o~.'umCnl.%, or d~c,, not mcct Ibc requirements of;my in~pcclion, rcf~rcn~'c Icsl or approval referred Io in Ibc C'onlracl Douumcnls. -- Why'rover ~cd in IhC~c General Condilions or in Ibc olhcr ('~nlr;scl D,~'um~'nl~ Ibc following Icrm~ h;svc thc meanings hiis been damaged prior Io ENC;INEER's recomnscndalion urlinul p:symcm (unlcs~ rcs~msihilit)' fi~r Iht prs~lc~'d,n Ih~-r~'~d' ifl,hc;~lcd s hie'h ;ir~' applicahl~' Io h~)lh Iht ~in~L,I;~r ;md plur;d Ih~'r~-~d': has been assumed hy OWNER at SUb~l;mli;ll ('~.npl~-Ii~,ft in _ accordance wilh par;~gn~ph 14.~ or 14. I0). A,l,/,',t~fit--Wrillcn or graphic insl~mcnts is~ucd prior li~ Iht Dr, ss'inX.~--~e drawings which show Iht churaclcr and s,pcning s,r llid~ s~ hi~'h cl;sriry, corrcel or change Iht bidding o~lh¢ Work Io bc ~ormcd and which huve bccn prepared docilm~'nt~ or Ih~' Ct}ntrLict Oocumcnl~. ~ or upproved by ENGINEER and lire refurrcd IO i. Ih~ Cun- Irdcl Documents. A~.rccmcnt~Th~ wrillCn agr¢cmcnl bClwccn OWNER and ('()N'I KA('I'()R covering Ihe Work lo he p~'rr~rmed; olher ~t'th'~ D,Ie ~11~ A~.r~tm'nt~'l'he dale indi~';sl~'d in Ih~ ('s~mr;~ l)o~umcn~ are au;~ch~'d Io Ih~ Agr~¢mcnl and made Agreement un which il becomes ¢~ctiv~. ha[ irnu such dale ~ u p;srl Ih~res~ra~ prs~vid¢dlh~rein, is indicaled il means Ih¢ d:sl¢ on which Ih~ Agrccmenl sign¢d and delivered by Ibc lasl orlh¢ lwo p~rli~s lo ~ign and AiV,Ih',t;,,~ J;,r l',~',a~.~t--l~c f~rm ucccplcd by ENGI- dclivcr. NEI?R ~hich i~ Io hc u~ed by CON'I'RA~I'OR in rcquc~ling - -- pr~grc~ or lin;d puymcm~ und which i~ Io include ~uch sup- A'NG/NEE~--Thc per~on, firm or corpon~tion named u~ ~u~h ~rlm~ d~'umcnl:~lion ax i~ required by Ibc Contract in Ihc Agreemcnl. [X~'umcnl~. Firhl Ord;'r--A writlcn order issued hy ENGINEER ~'hich I;;,/--'Fhc offer or pr(~po~al of Ibc bidder suhmiHcd on Ibc orders minor changc~ in Ibc Work in uccord;m~'c ~i;h p~c~'ri~'d f~rm xctling forth Ibc prlcc~ for Iht Work Io bc ;r;~ph 9.5 bul which doc~ no; involve u ch;m~c in Ih~' (',mtr~,~'l ~'~rmcd. Price or Ibc ContntCl Time. fi,,,~--Uid. ~'rf~rmancc and paymcnl bonds and uther Gr~er, lRrq,irc~,~'~t~--Sccli~ urD~vi~ion I or,he S~'~'i- in~l~mcnts of ~ecurily. ficalions. -- ('i~,t,~X'c ()r,l~'r--A dt~umcnt recommended by ENGINEER. L,s,.~ tt,d R~A. ttl, ti,,~.;: ~.,'s ,,r R,'x.,h~ti,,n.s--l.uv ~. ~'hich i~ ~igncd hy CONTRA~OR und OWNER and aulho- regulations, ordinances, codes and/ur ord~'r~. rizc~ an addition, dclclion or revision in thc Work. or an adju~lmcnlinlh~Conlr;~clPriccorlh~ConlmclTimc, issucd N~tit'r t~A,',r~--Thc wrillcn nt~lic'c by OWNI~H I~ Iht ~n or u[l~.r Ibc Effective Dale orlhe Agrccmcnl. appnrenl successful bidder sluling Ihisl upon ['ompll;m~-~' -- Ibc apparent successful bidder wilh Iht cundition~ enumerated Ihurcin. wilhin IbC lime sp~ciliud. ()WNI~R C,,,tt,,c~ I),,,'t,,~,t.s--Thc Agreemcnl. Addenda (which ~r- I~in IO Ih~ Conlracl Documcnls). CON'rRA~'OR's Bid sign and deliver the Agreem~-nl. __. li~luding d~umcntaliun ;sccompanying Ihc Bid ;sad uny ~sl- N,lic~ t,~ Pr, crr~--A wrillcn nolie'e given h)' OWN lie Uid d~'um~nlalion submilled prior Io Ih¢ Nolice or Award) ~hcn alluchcd us un exhibi~ lo Ihe Agreemcnl. Ihe Bond~, CONTRA~'OR(whhacopyloENGINEER)Ii~ingih~'dai~ un which Ihc Con~n~cl Time will c~mmencc Io run and lhc~¢ General Condilions. Ihc Supplcmenlu~ Condhions, which CON'rRACi'OR shall sl:~rl lo p~rrorm CON'I'RAL'- _ S~cificaHons and Iht Drawing~ as Ihe same are more spe- TOR'S obligations under ibc Conlru['! Docum~nls. cifically idcnliRcd in ~he Agreemcnl. Ioge[her wilh all umend- meres, modifications and suppIcmcms issued pursu;ml Io Ott'N~'~'~¢ public body or aulht)rily, cor~ralion, a~- purugruph~ 3.4 and 3.5 on or after thc Effective Dale or the cia[ion. Rrm or ~rson with whom CON'I'RACI'OR ha~ emcr~d _. Agrccmcnl. into thc Agrccmcnl and for whom thc Work i~ tu~ pruvid~-d. C, mtn;~'l flHtc--The moneys p:lyu~le by OWNER 10 CON. ~,,,,;,,1 U~/I/z,~,,,,--Plac;ng a port;on oF Ihe Wur~ ;n ~'RA~ON under Ibc ConlraCl Documenls as slated in Ibc for Ibc pu~ose for which it is inlendcd (or a rcla~cd pur~cl _- A~rccmcnl Isubjcct Io ~hc provisions o~ paragraph 11.9.1 in before reaching Substumial Complclion for all Ibc Work. Ibc cate ct Unil Price Work). ~tt~tt'l--Thc Iolul conslmcllon of which Iht W~)rk I(~ C,,tr,('t Time--Thc numar o~d~ys (compulcd as pmvldcd provldcd under Ibc ConlraCl ~umcnls may bc Ibc ~ __ in ~ragraph 17.2) or Ibc dulc slalcd in Ibc Agrccmcnl ror Ihc or u purl as Jndiculcd clscwhcrc in Ibc Conlracl D~umcn[s. complcHon o~ Ibc Work. Re~i~e.t~t ~r(~('l R~prex~nt(~th'e~Thc authorized rcpresen- ~ONTRACTOR--I~e ~on. ~rm or co~mllon whh whom Islive o~ ENGINEER who is a~i~ncd Io thc silo or any ~ OWNER has ~n[ereE talc Ibc Agrccmcnl. IhcrcoF. Shop Dr..'in#.~AII drnwings, diugrums, illustrations, ordering un addition, dclclion or revi.~;on in thc ~ork. or schcdu[c~ and o~hcr data which are spcci~cally prcparcd by res~ndin; Io diffcHng or unruresccn physical condilions under or for CONTRA~OR lo illustrate some portion of the Work which Iht Work is Io be performed as provided in paragraph and ~dl illu~lralions, brochures, standard schedules, pc~or- 4.2 or 4.3 or Io emergencies under purugr;~ph 6.22. A Work manet charts, in~lmclions, diagrams and olhcr information Oircclivc Change may nol change thc Conlrucl Pricc or prepared by a Supplier and submitlcd by CONTRA~OR Io Conlracl Time. but is evidence Ihut Ih~ ~rHcs cxpeCl thai illu~lralemalcrialorequipmenlrorsomeportiono~lheWork. Ibc change dircclcd or documented by u W~rk D/reel/ye Changc will be inco~ora[cd in a subscqucnHy issued Change ~r( i~c'n~h,~Those ~nions or Ibc Contract ~cumcnls Order [o]lowlng negotiations by Ibc purl/cs as Io ils cffccl. ¢un~i~ling o[ writlcn lechnicul descriptions or materials, any. on thc Conlract Pr/cc or Contracl Time us provided in equipmcnl, con~truclJon &ystcms. slandards and workman- parugn~ph 10.2. ~hsp a~ applicd ~o ~hc Work and certain administrative details applicable Ihcrclo. Written Am~n~,~,t--A wrhtcn umcndmcnt o[ thc Con~rucl Documcn[~. slgncd by OWNER and CONTRAil'OR un .S,h*'~,~lr,rt~r~An individual, firm or ¢c~rpora[ion having a a~tcr Ibc Effective D:~[c ortho Agrccmcnl and norm;ally dcul- dirccl contriver wilh CON'I'RA~OE or wilh any olhcr Sub- lng with thc noncnglncc~ng or m)ntcchniuul rather Ih;~n conln~cl~r Cur Ibc pcrrurm:mcc o[ a pa~ or Ibc Work ut Ibc Work-rch~tcd u~pccls o[ thc Cunlracl D~cumcnl~. ~ilc. 3'.~ ~t.,.i,,/C,..pl~fi..--~c Work (or u ~cificd ~n Ihcrco~ h;,~ prngrc~cd lo Iht ~;n[ whcrc, in Iht opinion ur ENGI- ARTICLE 2--PRELIMINARY MA~ERS NEER ax ¢vidcnccd by ENGINEER's dcfinhiv¢ certificate ~ff ~,h~l~mli;d Complcli(m. il iR ~ufliciendy complcl¢, in D~li~e~ o/Bonds: accord;race v'i~h Ibc Conlrucl D¢~'umcnls. so Ihul Ibc Work I~)r ~ilicd parll can b¢ udlizcd Eor Ihc purposes [ur which 2. I. When CONTRA~OR dcliver~ Ihc cxccmcd Agree- il i~ inlcndcd: or iF Ihcrc b¢ no such ccnilicatc issued, whcn mcn~s ~o OWNER. CoN'rRAcI'OR ~hall al,u deliver ~n;d p;~)'mcnl i~ duc in a~c~rdan~c with paragraph 14.13. Thc OWNER such Oonds as CONTKA~OR m;~y ~ rcqulrcd h~ Icrm~ "~uh~anHally c~mplcl¢" and "subslanli:dly com- [urnish in accordance with pictograph ~.1. ple~cd" a~ applicd ~o any Work rorer lo Substantial Complc- 3',~h.,,,.,~,~v C,,,,/ifi,,~--3'hc p;t~ or thc Cunlrucl ~¢u- 2.2. OWNER shall furnish Itl CONTRACTOR .p mcnl~ ~ hich am~nd~ ur ~upplcmcnls Ih¢~c General Cundi- copies (unless oihcrwise spcci~cd in thc Supplcmcnlary Cun- tl~,n~, dj(ions) O~ thc Conln~CI Oocumcnl~ a~ arc rcu~un;~hly ncc- canary [ur Ibc cxccullon o[ Iht We)rk. Addili~)n;ll copic~ ~ ill .~',l,pI/cr--A m;m~r~cl~rcr, f:~briculur, supplicr, distrihulor, bc [urn/shed. upon rcqucs[. ~1 Iht co~l ~)~ ~cDrod(lclion. m;~lcrialm;m or vendor. Commencement of Contract T/mt; A'otice lo Proceed: U,,Icrgr,,,,~,lFett'ilitirs~AUpi~lincn. conduits, ducls, cablcs. 2.3. Thc Contract Time will commence lo ~n un ~ iron. m;mholcn, vauhn, lunkn, lunncln or other such facili6cs Ih/ri/eib day aRcr Iht Effcclive Dale u~ Ibc Agrecmcnl. a~r all;~chmcnlx, and any ¢nca~emcnls cunlainJn; such fucil- a NolJcc lo Proceed is given, on Iht day indiculcd ihc~ ~ hich have ~en inntullcd underground Io furnish any or ~olice Io Pr~ecd. A Nolicc Io Priced may be given al any Iht rollo~ lng nerviccn t~r m;tle~uls: ¢lcctricily. I:tses. slcam, lime within Ihirty days aRer Iht Effcclivc Dale uf Ibc hq~Hd ~-Ir~dctmt oral,tin. Iclcphonc or olhcr communJc;~- mcnL In no event will the Conlracl Time commence Io run h~nx. c;~hlc Iclcvi~i~n. sewage and drainage removal. Iru~c later than Iht scvenly-~[Ih day a~cr Iht day of Bid opcnlng (~r ulhcr contrt~l ~ynlcmn ur wulcr, or Iht thirtieth day uRcr Iht Effcclivc D;d¢ of thc Agrccmenl. whichever date is earlier. Dricc~. ~ta~/ng tl, e Project: W, rl~Thc cnlirc complcl~d c(~nslmct;on or Ihc various scp- ~.4. CONTRA~FOR ah;dl stlt~ lo ~'~t~rm Ibc W~rk ;ir;riel) ~cnlifi;ihlc ~:trl~ Ihcrct)f rcq.ircd lo ~ rurnKhcd thc d;tlc when Ibc C(~fllniCl 'rime ctmmtcnccn It, r.n. ImJcl Iht ('onll~icl I~'untcnln. Work in thc Knuh ()f ~r- Work ~h. II hc dtmc al Ibc ~;IC O[i()r I. Ibc ti;dc ~);t ~ hich Iht ft,tming ~'rviccn. f. rni~hing labor and furninhing unJ incor. Contract Time commences I~ run. ~,raling malcrial~ and cq,ipmcnl into Ibc conslmclion. an coq,ired by thc Conlr;~cl [~cumcnis. Before ~tarting C~nstrurtion: M',~r~ I)irc~'tlr~' ('htt,gc~A wrJllcn directive Io CONTRAC- 2.~. Before undcn,king each ~ uf Ibc Work. ('()N- TOR. i~ucd un ~r after Iht Effective Dale oflhc Agreement TRA~OR shall carefully sludy and c~m~parc Ibc and nighed by OWNER and recommended by ENGINEER. ~cumenls and check and ~crlfy ~.rlincnl ~gurcn Ihereon nnd all applic-',hle field measurements. CONTRAC- ~n~ph 2.6. The fin:dized progrcs.~ schedule will he :,,'eeptahle I'()R shall promptly report in writing lo ENGINEER any IO ENGINEER us providing un orderly progrc~.~ion Gl' Ihe conflicl, error or discrepancy which CONTRAS'OR may Work lo compleliOn within thc Conlract Time. bul ~uch d~cuver and shall obtain a wrilten inlcrprclalion or clarifi- acceptance will nciihcrimpose on ENGINEER re~pon~ihihty eulion from ENGINEER before proceeding with any Work for Ibc progress or scheduling ortho ~¥ork nt:r relieve C'()N- ;dlZ'clcd Ihcreby: however. CON'I'RA~FOR ~hall not be lia- TRAWl'OR from full respon~ibilil)' Ihcrefor. The hie Io ()WNI[R or ENGINEER for r;tilure Io rcport any achcdtdc of Shop Drawing submixnion~ will be acccpl;~hlc <onfliCl. error or discrepancy in Ihe Conlracl Documents. ENGINEER as providing a workable arr;mgcmcnt for unlcn~ CON'I'RA~FOR had acluul knowledge thc~ofor should tossing Ibc submissions. The fin;dizcd schedule of values ~ ill rea~on;~bly have known Ihereof. be acceplable lo ENGINEER as Io form and subslanCe. 2.6. Within les da)'s after the Effeclive Dale ofthe Agree- mere lunles~ olhc~vise specified in the General Require- ARTICLE }~CONTRACT DOCUMENTS: INTEN'I'. menlo). CONTRACTOR ~hull submit Io ENGINEER for review: AMENDING. REUSE 2.6.1. an estimated progress schedule indicating Ihe ~larting and completion dales of thc various stages of the 3.1. ~eConlra~ct Doctm~enlsCompri~clhccnlircagrcc- Work: menl belween OWNER and CON'I'RAC-I'OR concerning thc Work. 2~e ContraCl Documents are complcmenlar¥; ~ h;tt 2.6.]. a preliminary schedule of $hop D~wing lob- culled for by one is as binding u~ if called tot by all. 'l'he mi~ion~: and ConlraCl O~tlnlenls will be con~lrucd in accord;race ~.6.~. a preliminary schedule of values for nil of the Work ~hJch will include qu;mlhics and prices of ilems 3.2. II is the intent of Ibc Contr;lct l)ocumcnl~ It) aggregating Ihe Cost,el Price and will subdivide the Work = functionally eomplele Pro~ecl (or p;~rl Iherco~ lo ~' inlo com~nen{ paris in ~urlicicnl detail to serve ns thc st~cled in accordance wilh Ibc C'onlraCl Documcnl~. basis for progress paymenls during eon~truclion. Such Work. malefials or equipment thai m;ly rca~om~hl¥ ~ inlL'~rcd prices will include an appropriale amounl ofovcrhead and from thc Contract Documenl~ as being requlrcd lo pr~uce profit applicable to each hem o~ Work which will be con- the inlended result will be supplied ~ hether or not firmed in w~ling by CONTRA~OR ~t thc lime of sub- called fur. When words which have a well-known technlc,d mission, or Irude mcanin~ ore used Io describe Work. m~tcri;d~ or equipment such words shall be interpreted in accord;race ~ hh 2.7. Before any Work at the site is stalled. CONTRAC- that mcunlng. Reference IO ~tund~rd ~pccifications. m;mu~l~ T()R ~hall deliver lo OXVNER. with a copy Io ENGINEER. or codes ofuny lechnicul society, organiX;~liOn ur u~uci:,lion. ecrt*fiCalc~ (and Giber evidence of insurnnce requested by or IO the Laws or Rcgulalion~ ufany govcrnmenl;d (}~'N I~R} which C()NTRA~OR is required IO purchase and whelher such reference be specific or by implication. mamt;~in in accordance whh paragraphs ~.~ and 3.4. and mean Ihe lulest stund;~rd spcci~calion, m:mu;d, ct~e t)r [.a~ OWNI:R shall deliver Io CONTRAS'OR eeHificales {and or Regulations in effect ut the lime of opcni~g of Bid~ {ur. on ulhcr evidence of insurance requested by CON'I'RA~OR) Ibc Effective Dale of the Agrccmcnl if there were no B~d~}. ~hich OWNER is required Io purchase and maJnluin in excepl as may ~ olhe~isc specifically slated IIo~cver. no accordanc'e with p;iragraphs $.6 and provision of any referenced standard ~pccificalion. manu;d or codc {whether or not specifically incorporated bi' reference duties and responsibilities of OWN ER. CONTRAS'OR ur 2.8. Wilhln twenly days alley Ihe Effective Date or the ENGINEER. or any of Ihcir consultants, agcnt~ or cmph~¥- Agreemenl. but before CONTRA~OR stalls the Work al ecs from Ihose set rorth in Ihe Contr;~ct Ducumcnl~. nt~r ~h~ll the ~ite. a conference ~ttendcd by CONTRACTOR. ENGI- il be effcclive lo assign lo ENGINEER. ur uny {~f NI~ER and olhcr~ a~ appropriate will be held to discuss the ~EER's consultants, agents or emplo)'ecs, un)' duty ~hedulc~ referred to in paragraph 2.6, !o discuss procedures authority Io supervise or direct the furnishing ur fur handling Shop Drawings and Giber submittals and for of Ihe Work or any duty or authority lo undcrlake ce~pon,i- ~es~ingApplleutionsfor~ayment.endtoeslablishaworking bility contrary to the provisions of parugr;~ph 9.13 or 9.1~. ~ndcrstundin$ among the parties as to the Work. Clarifiealions and interpretations of Ihe Conlracl ~cumenl~ ~hall be issued by ~NGIN ERR u~ provided in p:~rag~;~ph ~'igalidnI ScAedules: ~.3. If, during thc pedormance of the Work. CONTRAC- t.9. At least ten days before submission ofthe firsl Appli- TOR finds a conflict, error or discrepancy in the Conlract cation for Pa)'ment ~ conference attended by CONTRAC- ~cumenls. CONTRA~FOR shall so report Io ~NGINEER TOR. ENGI N ERR ~nd Gibers ~s ~ppropriate will be held to Jn writing at once and before preceding with Ihe Work all,tied finalize Ihe schedule~ submJlted Jn ~eeordanee whh pa~- Ihereby shall obtain n wrillen interpretalion or from EN(ilNEER: however. CONTRAC'r(~)R shilll nol be such olhcr I:lnd~ which arc dc,.ign:slcd I'or thc u~.c L)F CON. h, hlc lu ()WNER or ENGINEER (~or f.'iilurc to report uny 'I'RAC"FOR. Ea.,.emcnls (~ur pcrm:lncfll slruclur¢.., ur pcrm..s- cemll~cl, error or di.~crepancy in thc Conlracl Documents ncnl ch:rages in cxi~Hng f:~cililics will hc t)hl;lined ~md ~ tmlc,,CONTRACTORhadactuulknowledgclhcrcol,orshould for by OWNER. unless othcrwi.~c provided in Ibc ConlraCl rcJ,,omlhly have known Ihcrco~'. Documcnls. Ir CONTRACTOR bclJcw..~ th:~l uny dchiy in OWNER's I'urni~hing th¢.,,c hmd~. righl~-oLw:,y or mcnts cnlillcs CONTRACTOR lo ;in cxlcnsion pt' Ibc Con- ~ Ame~din$ and $~p~lementing Contract Documents: Iract Time. CONTRACTOR may m;ikc a claim thcrcl,or 3.4. Thc Contract Documents may be amended to pro- provided in Arlicl¢ 12. CONTRACTOR ,~hall provide for. all vide l,or -',ddhions. deletions and revisions in thc Work or Io additional lands and acc¢~$ therclo thai may. bc rcquirc,J for modil,y the lerms and condilion,~ thcreol' in one or more of, l¢mporar¥ conslruc[ion l,.',cililic.~ or $1oragc of, m;~lcri,l., a, nJ thc' I'~llowing w;3¥~: equipment. .1.4.1. u formal Wriltcn Amendment. Phy$1ca! Conditions: .~.4.2. a Ch.'~ngc Order {pursuant to par;~gr--,ph 10.4}. 4.2.1. l~ph~r~tion.~ ~,~J Rcporr~: Reference i,~ m:,dc or Io Ibc Supplemcnlary Condil[on~ for idcntific:~lion reporl.~ of exploration,~ --,nd tcsls of, .~ub.,urf:,cc condition,, .~.4.3. ;~ Work 13ircctivc Change {pur.~[lanl Io p;ir-a- al thc .,,i~c lha! h:lvc bccn ulilized by ENGINEER in preP- i:r~,ph I¢1. I I. ar;lllon of thc Contr:,cl Doc[imcnt'~. CONTRACT{}R rely upon IbC :~ccur~cy oF thc technical dal-', eont:lincd in A', h~Jic:,lcd in r, ar;igr;~ph,~ I ! .~ and 12. I. Conlracl PHcc and such rcporls, bul nol upon nonlc~hnic;d al;da, inlcrpr¢la- (.'onlr:lc! Time m:w only be ch:raged by a Ch;rage Order or a (ions or opinion~ con~:Hncd therein or for Ih¢ Wri[lcn ^mcndmcn~. ihcrcof [or CONTI{AC'J'OR'.s purpo,,c~. E~ccp| ;i,, indi- calcd in thc immcdialel¥ preceding ~cn[cncc and in .1..~. In ;~ddilion. Ibc req~,ircmcnls of, thc Contract Docu- ~r;iph 4.;2.6. CONTRAC'i'OR ~,h:lll h:lvc f, II _ mcnl,, m:~y be ~upplcmcnlcd. and minor varL',lion.~ and dcvi-',- with rcspccl to .,~ubsurl,acc ¢onJi[ion~, ;,! IbC lion,, in thc Work m:~y be -',ulhorizcd, in one or more of follo~'ing way~: 4.2.2. E-~i.~ti~r $lr~t~'tl~r~'.~: Reference i~ maJc Supplcmenlar¥ Condhiun$ for idcntiRc:,tion of _ .~..~.1. u Field Order (pur.~u:ml lo parugniph 9.5). drawings or physical condilions in or rcl;~ting Io cxi,,ling sur'f;,cc and .~[ib.~url'acc ~.lruclurc~ (ex,:cpi Underground .~..~..'2. ENGINEI".R's approval of u Shop Dr;swing or Fucilhic~ rcrcrrcd Io in p,r;~gr;~ph 4..1) which arc ,.;~mplc (pur.,,~ml lo p~ragr;~phs 6.26 ;md 6.27L or conliguou~; to IbC she Ih,! h,vc bccn ulilizcd h)' ENGI- i NEER in prcp;~ralion or Ih¢ Conlr:ict i')ocumcnl~,. (.'(),~/- .~.5..~. ENGINEER'.'~ wrhlcn ;nlcrprcl;ltion or clar~15- TR^C'I'OR m;~y rely upon Ihc ;iccur:icy of Ibc Icchnic~J ~,'ollon Ipur,,u;inl lo p;ir;IL~ruph 9.4). dal:l conl:iincd in .%tl~.'h dr;lwing~, hu! flol l~or thc ness Ihercof for CON'I'RAc-roR's purpo~e.~. E~cepl _ Jndic~lled in Ihc immedi;~l¢ly preceding scnlence :)nd m Ite,~¢ of Docume~ts: paragnlph 4.....6, CON'I'RAL'i'OR shall have full re,,fxm- 3.6. Nchher C¢)NTRAC'FOR nor any Subcontraclor or sibilhy whh respect Io physical condhion,, in or tel.,ling .~upplicr or olhcr person or org~miz:,l|on pcrformlng or fur- Io such slruclurcs. -- ni,,hinj any ut, thc Work under a direct or indirect cofllrac! ~-ilh ()WNE. R .,h~ill hilvc or pcquir¢ uny tillc to or ownership 4.2..3. Report ~Z)i.~'ri;iA' C~,~Jiti,,~): If C()N'I'RAC'. rit:hl~ in any uf the Drawings. Specifications or olhcr dc)cu- TOP, believes Ih;d: mcnl,, {or copies uf any IhcrcoF) prcp-',rcd by or bcuring thc · .col oI' ENGINEER: und they shall not rcu.~c any pi'them on 4.2..~.1. any I¢chni~';ll dulu on which C¢)N'FRAC'- ~:,~lcn..iun,. of' Ibc Proj¢cl ~,)r '-,ny oilier projcc! wiIhout wrillen '1'O1{ ix cnlillcd lo rely a,, provided in p;~r;iL.:r~lph., 4.~. ¢on,,enl ~l' O~A'NER and ENGINEER and specific wrillcn and 4.2.2 is inaccurate, ur ~erific';~lion or ud:,pl;dion by ENGINEER. -- 4.3..1.2. uny phy~ic:d tonal;lion uncovered rcvc;dcd a! Iht` site differs m:dcri;dly from Ih;d indi- ANTIL'LE 4--AVAILAUILITY 'OF LANDS: PIIYSICAL ealcd, reflCcled ur referred Io in the ¢'onlr;,~'l CONDITIONS; REFERENCE POINTS mcnls. CONTRAC'FOR shall, promplly ;d'ler becoming A reilabilit)' ofl.and.~: Ihcreof and bcrorc pcrRwming ;my Work in ~;onneclion 4.1. OWNER sh:dl l,urnish, as |ndicaled in ibc Contracl Iherewith (except in ,m emergency as permitlcd by para- - i'~umcnt~. Iht lunds upon which Iht Work is Io bc per- ~raph 6.22). notil,y OWNER and ENGINEER in ~'rhing farmed, ril:hl,~-uf-way #nd cu~cmcnls fur access Ihereto, and aboul Ibc inaccliracy ur difference. 4.'~.4. I'.'lV(;lhrl~l'.'l~'s H~'ri~'~': ENGINEER will dclcrmlnc thc ext,'nl IO wh~¢h'lh¢ Conlr;-.:l pr~mpIly rc¥icw Ibc pcrlJncnl condil;ons, d¢lcrmlnc Ibc should he modificd Io rcfl~cl and do~'umcnl Iht nc~'c~ily ~r ~hi;~Jning uddh J~nal cxpl~ralion~ ur tc~l~ wJlh qtmnc¢~ o~ Ih~ ¢xi~lencc u~ Ih¢ U~dcr~r~md J:acilh )'. rc~'l IhCrclo and advi~c OWN ER in wrilin~ IwJlh ~ copy Ibc Contracl Documents will bc ;~mcndcd ~r ~uppIcmcn~cd I~ ('()N'I'RAC-I'()R) o~ ENC;INI[ER'~ IJndin~ and con- Io Ibc ¢xlcnl necessary. Durin~ ~uch lim~'. eh~i~n~. TOE sh;dl hc rc~p~nsihlc for Iht ~a[cl)' ;~nd prol~'~'~i,m st~ch Undcrgrotmd Fae'ilily a~ pr~vidcd in ~r~gr;~ph ~.~1. ~'~n,-h~lc~ Ih;~l Ihcr¢ i~ a m;~lcriul error in Ibc L'[~nln~cl Ir~cl Price or an ¢xlcn~J~n ut Ibc C'o~Hra~l 'l'im~-. ~r h~lh. I~'t~mcm~ or thai h~cau~c or newly discovered condi- Io Ibc extent thai Ihcy arc uHribul:~blc lo Zhc exi~lcncc li~n~ u ch;rage in Ibc Conlra:l Documcnls is rcqulrcd, a any Underground Fucilily Ihu[ was nul sh~wn or ind~cal~'d W~,rk [)ir~'~'tivc C'h;mg~' or a C'h;mgc Order will be issued in Ibc Contr;tcl Dt~cumcnl~ ~nd which CON'I'RAC"i ~ a~ pr~idcd in Arkie'lc I(I lo r~'~cl ;md documcnl Ibc could nol rca~onat~ly h;~vc b~'~'z~ cxpc~'lcd lu be aw;~r~' e-on~cqt~'ncc~ of Iht inaccuracy or di~crencc. I~lhc parties arc t~n;~hl¢ IO ugrc~ ~ lu thc amot~nl ~r Icnglh thcrc(~r, CON'rRAcroE may m;~k¢ u cl;~im Ih~-rcl'~)r 4.2.6. /'~.~.~ihh' I'ri~-{' ~n~l Tim~' A~O't~sl~ta~l~: in each provided in Arliclcs I I and 12. -- ~u~-h ~'a~c. un increase ur dccrcu~c in ihe Comract Price ~r an c~lcn~ion or ~hurlcnin¢ Bt Ibc ConlraCl Time, or any comhinalion Ihcrcuf. will bc allowable Io Ibc cxlcnl Ihal E~/er~c~ Poi, ts: Ihcy are altrihul~hl¢ lo any s~eh jm~ccuracy or difference. 4.4. OWNER shall provide engineering ~urvey~ lo e~lah- -- Ir()WN ER and CONTRAS'OR are unable I0 agree as to lish reference points for conszrucli~m which in ENGINEER'~ Ibc umounl ~)r length Ihcrco~. a claim may b¢ made therefor judgment arc necessary lo enable CON'I'RACI'()R I~ priced a~ provided in Arti~'Ic~ I I and I~. wiih Ibc Work. CON'i'RACI'OI{ sh~dl b¢ responsible I'~,r lay- ing oul Iht Work (unless otherwise ~p~'ci~ed in Ibc ~ Requirements). shall prolecl and preserve' Ibc I'~.rslcal ~'un8i~io~s~U/~ge~roun~'acEilies: reference ~ints and shall m;~kc n~)ehan~u~ ~r 4.~. I. 5h~v/~ ~r in~i~'~l: Thc inrormalion and data wilh(}ul Ibc prior wrJll~'n approval of OWNI{R. ~h~'n or indicated in Ibc Conl~acl ~umcnls whh res~cl TOI{ shall rcpori Io ENGINEER whenever any r¢l~'r~'ncc ~ Io ezi~ling Undcrgro[md Facilhics al or conliguous Io Ibc ~int is lusl or dcslroycd ur ~qoir¢~ r~'lt~aliun hec;~u~¢ ~it¢ i~ h~ed ~3n inrorm;~lion and dula ~urnishcd Io OWN ER necessary chances in grades °r I~aliun~' and ~h;dl ~ respire' or ENGINEER by Ibc owners orsuch Underground Facil- siblc [or ih¢ accurulc rcplacemcnl ~r relo~'uliun o~ ~uch iti~ ~r by mhcrs. Unles~ il is olhcrwis¢ expressly pro- ercnc¢ poinzs by pro[essionally qualili¢d personnel. vialed in Iht S~lppIcmcnlary Condilions: 4.~.1.1. OWNER and ENGINEER shall nol b~ AR'I'ICLE~BONDSANDINSURANCE r~n~ihlc for Ibc accuracy or complclcne~s o~uny ~u~h infurm;~llon or data; and. 4.3.1.~. EONTEA~OE ~h;tll have roll rcsp~n~i- 5.1. CON'FEA~O~ ~hall furnish ~d~rman~ and __ bility for reviewln~ and ch~ckin~ all such information mcnl Bonds. each in an amounl al Ica~l equal IO Ih¢ ConlraCl and dal3. for I~atin~ all Under~round Facilities shown Price as securhy ~or the r~ilhrul perrorm~mce and puymenl ~1' or indicaled in the Conlracl ~cumenls. For c~rdina- all CONTRA~FOR's ohli~alion~ under Ih¢ Cumr;~ct l)~cu- lion of Ih¢ W~)rk with Ih¢ owners or$uch Underground menls. These Bonds shall remain in ¢11~Cl al Ica~l umil ~n~ __ Facilili¢~ durin~ conslmction, rot ihc surely and pro- ),ear utter lhe dole when final ~ymcnl ~'~-~m~c~ due. leCii~}n d~crcor a~ pr~vidcd in paragraph 6.30 and as olhc~ise provided by Law or Rc~ul;~lion or b)' Ibc ('~n- repairin~ ~ny d;=m;~¢ Ihcrclo resuhin~ From Ih¢ Work. In~Cl Documents. CONTRACI'OR shall al~o tarnish ~uch Ih¢ co~l or all oF which will bc considered as havin8 oiher Bonds a~ are required by Ihc SuppIcmeni;lry C~ndi- ~¢n included in Ibc C~ntrac[ Price. I{ons. All Bonds shall bc in Ibc ~orm~ prc~crihcd by l.a~ Requisition or by thc Conlr[~ct D~c~m~'nl~ ;md hc 4.).~. N~I 51,,,', ~r I,,llr~i/r~. IF an Under, round by such sure,les as arc named in Ibc currcn~ li~ oF "Corn- Facility is uncovered or revealed al or cunlicuous to Ih¢ ponies Holding Certificates urAu~hurily as Acceptable ~ure- si~¢ ~'hich ~'a~ m~l shown or indicated in Ibc Conlract lles on Federal Bonds and a~ Ac~-cp~ahlc Rcin~ur~n~ C'om- ~umcn[s and which CONTRAil'OR could not reason- panics" as published in Circular 570 I~mcndcdl hy Ibc Audi~ ably have been e~pcclcd lo hc aw~re or. CONTRA~OR S~urr Bureau oF Accounls. U.S. 3'rca~ury ~-p;~r~mcnl. All ~h;dl. promptly a[Icr bccomin~ aware Ihcreor and ~ore ~onds sicncd by un ;~gcnl must bc acc~m~panicd by ~ ._~ ~rf~)rmln~ any Work afl, ClOd Ihercby (cxccpl in an ¢mcr- copy o~ Ih¢ lmlhorily Io acl. ~ency a~ ~rmi~ted by paragraph 6.22). idenliry Iht owner ~F~u~.h Under~round Facility and g;ve wHIlen nmlce thereof 5.2. i~ Ihe surely on any Bond ~urnlshed by CONTRAC- lo that owner and lO OWNER and ENGINEER. ENGI- TOR is declared a bank~pl or becomes insolvent ur il~ ~ N[~ER will pr~mpIly review the Underground Faeillly Io Io do business is lerminaled in ~my slul¢ where any ~il Ih~: Pro~lecl is Iocuted or il ceases Io meet the requirements thirty days' prior wriHen notice has been g~ven to OWNER or purllgraph $.1, CONTRACTOR shall wilhin five duys and ENGINEER by certified mull. All such insurance shall Ihcrcartcr subs[itulc unolhcr Bond and Surety. both o~ which remain in cffccl until final puymcnl und ut all times Ihcrcuflcr mull bc acccpl~blc lo OWNER, when CONTRA~OR may bc corrccling, removing er replacing ~,(-~i~'t Work in accordance w~[h paragraph I ~. I In addiHon. CON'FR~CTOR shall m;dntain s~ch complclcd ~onlractor'i Liability Insurance: opcralions insuruncc for ut Ica~l Iwo )'cai ~ :filer fin;d paymcl~l ~.3. CONTRACTOR shall purchase and maintain such and furnish OWNER wilh ~vidcnc~ orcontinu:~ion ur~uch com~rchcnsivc general liability and olher insurance us is insurancca~ finulpuymcnl and one year Ihcrc:tftcr. ap~rt~priale for Ibc Work being pe~ormed and furnished and a~ will or~vldc protection from clulms scl furth below which m:~y artec ~ul t~f ~r rc~ul~ from CONTRACtOR's pcrfur- Conlractual Liability ~n~urance: m:~ncc and furnishing o[ thc Work and CONTRAC'YOR's 5,4. Thc comprehensive gcncr~d li;thility in~ur:~ncc required olhcr t)hhgution~ tlndcr Iht Contr;~cl Documcnts. whether il by p;~ragr,ph 5,3 will include contraclt~;d li;~biliD' in~ur;~ncc i~ I~ hc pcH'~)rmcd or furnished by CONTRACTOR. by any applicablc to CONTRACTOR's obligation~ unJcr Suhcon~r;~ctor. by anyone dircclly or indireclly cmploycd by 6.30 und 6.31. ~tn)' of thcm Io pc~orm ur furnish any or ibc Work. or by anyonc for ~ho~c acl~ amy of Ihcm may be Owner'~ Liabili~ Insurance: ~.].1. Cl:dmn undcr workers' or workmcn'scompen- n;~h~n, di~;~bili~y bcncfitn and uthcr simih~r employee ben- 5.5. OWNER $h~dl bc responsible for purch;~ing and ¢~:~ct~; maintaining OWNER's own liability in.ur, ncc and. OWNER's option, may purch;~c and m;tinlain ~uch incur- S.3.2. CI;dm~ for d;~m;~gcs bcc~lu~c ur bodily injury, anco as will protect OWNER ;tg;~in~t chdm~ which m;~y ~c~p;~tlun;ll ~ickncnn ur di~cusc, or dcalh o~CON'rRAC- from opcrulions under Ibc Cunlr;icl Documcnl~. T()R'~ cmpl~yccs; 5.].3. CI;dm~ ft~r dum:tgcs bcc:msc ur bodily injury. Proptrt] ln~uranct: ~ickn¢~n ur di~casc, or dcu~h ofany pcr~on olhcr Ihun 5.6. Unless olhc~ise provided in Ibc Supptcmcniary C()NTRAC'rOR'n cmploycen; Condilions. OWNER shall purchase ,nd mainlain property insur~inc¢ upon thc Work al Ibc hilt IO Ibc full in~ur;~blc value ~.].4. Ch~im~ f~)r d;~m;~g¢~ in~t~rcd by personal injury Ihcreof(~ub~ccl Io ~uch deductible ;m~ounl~ ;~n m;w hc li;~bHily c~vcr;~gc which arc ~,~l;Hncd I.I b)' any person vidcd in Ibc St~pplcmcnl;~ry C'ondi~it~n~ or required h)' .. a rc~.h ~f ~n t~ffcn~c dircctly or indircclly rcl;tlcd Io and gcgul;lliuns). Thi~ in~ltr~incc nh;ill inch~dc Iht intcrc~l~ Ibc cnH.It~) mcnt t)f ~uch pcr~on hy CONTRACTOR. or ufOWNER.CONTRACTOR. Stlbct~llr;iclor~. IbJ b) ;~ny ~(hcr pcr~n r,,r any other rc:~on: and ENG INEER'~ conntJll;mln in Iht ~Vo~k. all oF~ h,,m bc lisled ;ts innurcd~ ur addhion;~l in~urcd p,~rtic~, nh,Il 9.3.5. Claimn for dam;~gen, olhcr Ihan 1o Ih¢ Work ag;tinsl Ibc pcril~ of fire and cxlcndcd covcr;~gc ;md nh.dl l~clr, bcc;~unc of injury lu~rdc~lr,clionurlangiblc prop- i~cludc "all risk" insur~mc¢ for physical Iox~ and crly ~hcrever lock, lcd. including Ions o[ uae resulting including thcfl, vandalism and m;~licit)t~ mischief, c~dl;~p~c Ihcrcfrom; and wa~¢r d;~magc, and such olhcr pc[iln ax m;~y bc pro~ idcd in the Supplementary Conditionn. and nh;dl include dam;~gc~. ~.3.~. CI;dmn arising out ~r operation of Laws or R¢g- losses and cx~n~cs aH~ing ou~ of or rc~uhing frt,m tm) in~urcd ul,lit~nn for d;am:~gcn ~cau~¢ of bodily injury or dc[Hh of loss or incurred in Iht rep;dr or rcpl;tccmcnl of any in~utcd ~ny pcr~on or for dam;~ge lo properly; and properly (including but not limited Ia rcc~ ;end ch;~rgc~ engineers, architccln, al~orncyn ;tad olhcr profc~xit~n.dxl ~.~.7. Claim~ for d~m;~gen b¢c[tu~c of bodily injury or notcovcrcdundcrlhc"allri~k"in~t~r;~nccorothcr~i~c dculh of ~ny pcr~on or properly d~tm~gc arising out orlhc vidcd in Ih~ Supplcmcnlary Condition~. CON~'KACI'()R nh.~ll ownership, m;~intcn;tncc or use of any molar vchlclc, purchase and muinl[dn nimil;tr property in~ur;~ncc t)n p~rl~,~n~ o[ Ibc Work slor~d on and off thc silo or in tr;=n~il ~ hen Thc in~ur;~ncc rcquircd by thin p;irag~lph 5.3 shall includc porlions of thc Work arc Io bc included in an A~pllt';tlio~ Iht ~R'~'i~i~' c~vcr;~gc~ ;md bc wrillcn f(~r nol Ic~ Ih;m Ibc P~ymcnt. hmtl~ ~)1 h.~hd~l)' and c(~vcr;~gc~ pr~)vidcd in thc Supplcmcn- I;~r)' C~ndhi,m~. ()r rcqttircd hy I;~w. whichcvcr is grcalcr. ~.7. OWNER nh;dl Ourch;~c a~n(I maint~iin nuch bo~lc~ ;inJ '1 hc c.m~prchcnxivc gcncr;d liahilhy innurancc ah;tll incl,dc muchlncry insurance ur addili()n;d propcrl)' i,~ur;mcc :l~ ~)mpIc[cd (~pcr;llionn in~ur:tncc. All ~)r thc ~licics ofinnur- bc rcqulrcd by Ibc Supplcmcnt;~ry Cu.J~li~m~ (~r L;l~n uncc ~) required lo bc purch;l~cd and m;dnt;dncd (ur Ihc gcgul, li~n~ which will incl,dc Iht in[crc~ or ~crli6c;llc~ ~.r t~lhcr cvldcncc Ihcrcufl ~hall conl~tln u pruvi- CONTRACTOR. Subc(m~racl~)r~. ENC;INEI?R ANI) ~mn ~r ends. ~cmcnl Ih;~l Ibc coverage affordcd will nol bc ENGINEER'~ con~ull;ml~ iii thc ~V()~L. all ~ff~ horn ~h.dl canccllcd, m~lcrially ch. ngcd ur rcncwal rcfuncd until al Icun[ lislcd un insurcd ur addiliun;d in~urcd parlicn. 5.8. All Ihe policies o1' insurance (or Ihe cerlific;dcs or such w:~iver forms are rcqui~cd ~d' any S.h,.'ontr.lcl~r. u~hcr evidence Ihcreo~ required Io be purchased and mnin- CONTRA~OR will obl:d, Ibc sam~. laincd hy ()~VNEE in ;~ccord:mc~ wilh p~ragraph~ 5.6 and ~. 7 will ~'~tnlu~n a provision ~r cnd~r~cmc,t Ih;~{ Ihc coverage uff~rdcd will n~, hc c:,nccllc'd ~r m:~lcH:dly changed or rcncwal R~celpf and Applicalion o/l'ructt~l~': -- r~-fu~cd~mlil;~ll~-;~llhlrlyd;w~'prit~rwrhl¢nnolicchasbcen 5.12. Any in~ur~'d Io~ ,nd~-r Iht pul;~'ic~ gi~'cn lu CON'FRA~i'()K hy ccrli~cd mail and will contain rcquircd by p:~r, gr;~ph~ 5.6 ;~nd .~.7 will he- adju~vd wi,vet provi~i~n~ in ;~ccordanc¢ with p;~ragraph 5.1].2. OWNER and made p~y~hlc It~ OWNER a~ ~ru.~c~ I'~r ~1~. -- 5.9. OWN EK ~h;dl nut h~ responsible ~or purchasing and mcn(s o[ uny applic;~bl¢ morlg;~gc e'l;~u~c and uf main~,imn~ any properly insurance lo prolccl thc imcrcsts 5.13. OWNER sh;dl deposit in a scp;~rutc ;,c~,m~ ~ffL'ONTHACTOR. Suhconlr;~clors or o[hcrs in Ibc Work Io so rcc¢ivcd. ;md shall di~lrihul~ h in ;~c~'~rdan~' ~i~h ~u~'h Ibc cxt~'n[ (~[ ;my dcduclihlc amo,n[~ th;~t ;~r¢ pruvidcd in Ibc agreement u~ Ibc par[Jet in inicrC~l m:~y r~';~'h. I[ n~ ~lh~'r -- 5uppIcmcmary Conditions. Thc risk or loss within Ibc spcci~] ;~grccm~nl is reached Iht d.~m;~gcd Work ~h.,ll d~'duClihl¢ amount, w~U bc hornc by CONT~A~OK. Sub- rep;tired or replaced. Iht moncy~ so r~'ci¥~d ,pph~'d ~n c~mlruc[ort)ruthcrs~u~ring;my~uchlossandir;mYorthcm accounl Ihcrcu~ and Ibc Wozk and Ih~ co~l Ih~'r~H' ~'~ ~'r~'d __ v i,h~-~ prop~'rt)' in~ur:mc~ coverage wilhin thc limits o[such by an ~ppropria[c Ch;rage Order ur Wrhtcn um,,,m~, cinch may purch;~c and muint;~in il al thc purch:ts- er'~ awn cxp~n~c. 5.13. OWNER us ~ru~c¢ shall have po~'cr tu ad~u~l and sclllc any loss with Ibc insurers unless onc u[ Ibc p,~r[Je'~ -- ~.10. I~ CONTRACTOg requests in wriHng Iha[ olhcr in,creel 5h;dl ob~ccl in wriHng within ~C[ccn da)'~ artcr ih~- ~p~'~-i;d in~ur;~ncc he included in Ibc properly insurance pul- occurrcncc or Ios~ lo ()WNE~'~ ¢x~-rci~e u[ Ihi~ ru~e'r. I1' ie')'. ()WNI?R ~h;dl. i~ possible, include ~u~h insurance, and such objection b¢ made. OWNE~ u~ Iru~lc¢ ~h.dl m,L~' ~'[- Ibc ~'t~[ thcrcor ~rill b¢ ch;~rgcd Io CONTRACrOR by appro- Ilcmcnt with Ihc insurers in accordance ~'iH~ ~uch __ p~.~' C'h;mF~' ()rd~'r or Writlcn Amcndmcnl. Prior Io com- a~ thc p;~rtics in i,~rchl m;w rc;~ch. ]~ rcq,ir~'d m ~i~in~ m~'n~cm~'n~ {~l'lhc ~V~,k ;H thc ~lc. ()WNI~R ~h;dl in writh~g uny p;~r[y in Jn[crchl. OWNER u~ Iru~tcc ~h;dl. ;~d~ ~' C'()N'I'R AC'T()R wh~'~hcr (~r n~l ~.~h olhcr ins~runcc occurrence oran insurcd Io~. glv~ hand [k~r Ih~' h;~ hccn pr~cur~-d hy OWNEI{. [orm;mcc o[such dulics. 5.11.1. OWN ER and CONTRA~OR waive all righls 5.14. l[OWHERhusanyob~liontolhccovcrag~'aR~rd~'d ~ ug:~in~l each olhcr for all lu~c~ ,nd d~mages caused by by or olhcr provisions o[ Ihc in~ur~rnc~ required Io b~' par- uny uf Ih~' p~-ril~ covered by Ibc ptdi~ies ut insurance ch,~cd and m:~inlalned hy CONTRACTOR in pr~vid~'d in rc~pon~c Io r:~r;~gr,ph~ 5.6 and .~.7 and any ~'ilh p;iragruphs 5.3 ;md 5.4 on Iht' h;~J~ [~Fil~ nul ~lh~'r pr~Dcriy in~ur;~nc¢ uppl~c;~hl~' Io Ibc Work.and also whh Ibc Conlracl Documcnl~. O~VN[H ~h;dl nt~lff)' L'()~- NI-]I~R. ENGINEER's ~'~)n~ullunl~ and all mhcr p:~rH¢~ delivery or ~.ch ccrlJ~C;llc~ lu OWNER in a~'~'ord.m~'u ~lh n.~mcd u~ in~t~rud~ in ~uch pulik'its rut Io~c~ and damages p;~r;igr;iph 2.7. Ir C'ON'I'RAL"I'OK h;~ uny ~)hj~'~'li,m I~ Ih~' ~u c;=i~cd. A~ rcq~ircd by paragr;~ph 6.11. c;ich subcon- covcr;~gc a~rdcd by or olhcr pruvi~ion~ or th~. p~hvl~.~ -- Ir~lcI ~twc~'n C'ONTRACTOR and u Subconlraclor will insl~r:mcc rcq~lircd lo bc purch;l~cd ,md m;~im;~in~'d hy ~'on~;~in ~imildr w:~ivcr pr~vi~ion~ by Ibc S~lhconlruclor in in accord;race with p;~ragruph~ 5.6 ;md 5.7 un Ibc h.~i~ ~1' Iuv~r{~fOWNE~.CON'I'RAc'roR. ENGINEER. ENGi- Ihcir no[ complying with Ih¢ Conlr;l~'l D~)ciml~'nl~. N E EK'~ con~ulianl~ and all other panics named as in~urcd~. TRACTOEsh;dlnoli[yOWNERinwrilinglh~'r~'~i[~illunl~'n ~ Nun~' oF Ibc above waivers ~h:lll extend IO Iht righls Ihal days o~ Iht dale o[ deliver)' ut sll['h ccrl;/ieul~'~ h~ C'()N- uny ur thc in~urcd p;~r[ic~ may have lo thc proceeds ur TEAPOt( in uccord:~nce wi~h p:~r;~gr;~ph 2.7. ()WNI~R in~ur;mcc held by OWNER u~ truslcc or olhcrwis¢ p~y- CON'FRA~'OK sh;dl each pro~id~' Io Iht ~thcr ~uch ;~dd~- uhlc under uny policy ~o i~ucd, lionul inFormulion in respect oF insurgence provided by -- aR [he other may rca~on;~bly rcquchl. F;~ilurc by O~'NEH ~r 5.11.2. OWNER and CONTRACTORinlcndlhatany CON'rRA~OKIogiveuny suchn,)licc~[uhj~'~'~i,)n~lhin D,~licic~ provided in response to pur;~gruph~ 5.6 and 5.7 ~hc llmc providcd sh;~ll con,Ii,utc ;~c~-cp~;~ncc ~1' ~uuh in~ur- xh.dl pr[~lccl ,11 u~ Ibc p:lr[ics insured and provide primary uncc purchased by thc olhcr u~ compl)'i,g whh ~hc - cuvcr;~gc for all Io~cs and damages caused by Ibc perils Documents. coYercd Ihcrchy. Accordingly. all ~uch policies shall con- I;~in pr~)vi~iun~ Io Ibc ¢~cct Iha[ in Ibc event ur any luxx or d,mugc thc insurer will huvc no 6ghts of Partial Ulili~lio~roptrt~ Insuranct: -~ rccoxcry ag,in~t uny o~the purtics namcdus Jnsuredsor 5.15. IFOWNER find~ il neccsx:try lo occupy or add*tionul mxurcd~, and if thc in~urcrx rcquirc scpnr;ttc portion or portions ortho Work prior lo Suh~l;tnti;;l Ct*mplc. ~;tixcr f~rmx to bc slgncd by ENGINEER or ENGI- liono~ull thc Work. such useuro¢'cup;mcymayhcucc,m~- NEER'~ ct}n~t;hant C)~'NI[R will obi,in thc sttmc, and i~ plishcd Jn uccordan¢'c wilh paragr~tph 14.1U; provided -- %t~ch u,e or occupancy .~hull commence before thc in.~urcrs 6.5. Allmalcrlal~mdcq%~ipmcnl ~h;dlhco~got~d pro~iding thc prt~pcr[y insur:mcc h;~vc ncknowlcdgcd no{icc and new. except as otherwise provided in Ih~' Ct~nlr;~'l Ihcrco~and in writing cji'coital thc changc~ in cover,ge ncccs- umcn[s. I~ rcqulrcd by EN~I~EEK. CC)NTKACT()K ~h.dl ~ilatcd ~hcrch)'. Thc in~urcrs providing Iht properly in,ur- furnish suH~,clury evidence lincluding rc~urt~ o~ required ~ ancc ~h;HI c~n~cn( by cnd~r~cmcnl on Ihc policy or policies. Icsls) as Io Ihc kind and qt~lily ~1' matcri.d~ ;Lnd h~ll Ih~ propcrl)' in~ur;~n~c hh;dl not hc c;mccllcd or lapse on All m~Hcri;d~ and cquipmcnl ~h;dl bc applied, inet.died, con- acct~unl ~[ any ~uch p;~rli;d u~c or uccup;mcy, nec[cd, creeled, u~cd. cleaned :~nd cundilioncd in uccurd.mcc wiIh Ibc inslruclions of thc ~pplicablc Stapplicr cxccp[ ~ olh=rwi~c provldcd in Ibc Conlrac{ Documcn~: bu~ no pr~- vision o~ any ~.ch in~trucliun~ will he cffccli¥c lu AK'I'ICI.E ~C()NTRACT()R'S RESDONSIOILI'I'IES ENGINe[R, orany uF ENGINEeR's cun~uh:~n~. employees, any dui), or uulhoril)' lo s.pcrvi~c ur dirccl ~ 5~p~rrision and 5up~rinle~Eenc~: [urni~hing or pcfform~ncc oFthc Work or uny du~>' or Jty [o undcrt;~kc responsibility c~ntrary Io Ibc provi~ion~ 6.1. C'()N'FRACTOR ~hall ~upcrvi~e and dir~l [he Work puragr;sph 9.15 or 9.16. c~mp~'lcnll)' and cft~cicnlly, devoting ~uch ;tHcnlJon Ihcr¢lo ~ and uppI)ing ~t~'h ~Lill~ and ¢xp¢rtihc as may bc necessary lo ~dorm the ~Vurk in accordance wilh Ibc Conlrnc{ Doc- A~.~lln~ Pro~r~s umcnl~. C'()N'I'RAC'FOR ~hall b¢ solely responsible rot ihc 6.6. CONTRACTOR ~h~dl submil IO ENGINEER fur mc;m~, mclhod~. Icchniqucs, sequences and procedures o~ ucccpl;mcc (Io Ibc cxlcnl indicated in parugr;~ph 2.9) ;~d~u~l- -- c(,n~lru~li~n, hut CON'FRA~FOR sh~ll nol bc responsible mcnts in Ihc progress schedule ~o rcRC~l Ihc imp;~c~ thereon lot Ibc nc~ll~cncc o~ ~lhcr~ in Ibc design ur sclcclion of a or new dcvclopmcn[s: Ihcs¢ will conr~)rm ~ncr.ll)' ~c~' mc;m~, mclht~tl, technique. ~equcnc¢ or proccd~rc progress schedule [hen in cROci and addiliunally ~ ill e'umply of con~lruclion ~'hich i~ indicated in and required by thc with any provisions o[ Ibc Gcncr~d Ecquir~mcn[~ -- Conlra['l Documcnl~. CoN'rRAcrOR sh;tll be responsible Ihcrc~o. h~ ~t'c Ih;~l Ibc Rni~hcd Work complic~ acuuralcly wilh Ibc __ 5uJslil~les or *'Or-E~ual" 6.~. L'(JN'I'RAc-roE shall kc~p on the Work al oil limes 6.7.1. Whenever mutcrial~ or equipm¢n[ are during i~ pr~rc~ u compclcnl rc~idcn~ supcrintcndcnl, who or described in Ihe Conlruct Documcm~ by using ibc ~h.dl n~l hc [cpl,~c¢d withuul wriHcn nuticc 1o OWNE~ and o[a proprietary ilcm or thc name u~ u p;~r~i~ul;~r Supplier ._ ENGINEER c~ccpl under cxlruordinury circumstances. The Ibc naming o~ Ibc ilcm is inlcndcd Io ¢~l;,bl~h Ibc lypc. ~upcrmlcndcm will bc ('ON'FRAC'i'OR'R rcprc~cnlulivc ul [uncllon and quulily required. Unlc~ Ibc ri.mc i~ Ibc ~H[' an~l ~h;dl have uulhorily Io ;~cl ~n h¢hal[ or CON- by words indicaling Ih;~l no ~Ub~lJlulion i~ pcrmh~cd. '1 N AC' I ( )R. All ~'on]mun~(;tl ion~ givcn Io Ih¢ ~upcrinlcndcnt m;~lcri;~l~ or cqt~ipmcn[ o[olhcr 5upph~r~ m;~)' he _ ~h. HI hc a~ binding .~ if given lu CONTRACTOR. by ENGINEER il ~u~cicnl in[t~rm;~ti~m i~ ~uhmiHcd CONTRACTOR Io allow ENGINEER Io dc~crm;nc I.ahor. ~lat~rialz an~ ~'q*,;pm~nt: Ibc material or cquipmcnl proposed i~ cquivalcnl or cqu~l Io Ih;u named. Thc procedure [ur r~vicw by ENGINEER -- 6.~. C()NTRAC'I'OR shall provide compclcnt, suilably will include Iht ~ullowing us ~upplcmcnlcd in Ibc Gcncr~d qu;dihcd ~r~unncl lo ~urvcy and lay out Ibc Work and per- Rcquir~mcnls. Rcqucsls [or review of ~ub~lilut¢ il¢nt~ [~rm c{~n~lrucliun u~ required by thc Conlr;tc( Documcnlx. mulcriul and equipment will nol hc ucc~p~cd by EN~I- C()N'I RACTOR ~hall at all limes m:dnluin ~ood discipline NEER from anyone olhcr Ih.n CON'FRA~F()R. I~C'()N- ~ and order al Ibc ~ilc. Exccpl in connection with thc surely or TRACTOR wi~hcs Io [urni~h or u~c u ~uh~lilul~ pru~e~lion oF pcr~on~ or thc Work or properly at thc site or mu[cri:d or cquipmcnl. CONTHAC'I'()R xh:dl m;~kc wril. ;~d.i;~c'cnl Ihcr~lo. and cxccpl us otherwise indi~ulcd in Ibc ICh applic;~liun lo EN~INEER-f~w u~ccpl:mcc C'[mtrucl D~cumcn~, ull W~rk al thc ~ilc ~h;dl bc pcdormcd certifying Ih~ Ibc prt)pt~cd xut~[~lUlC ~'ill pc~rm ~ durm~ regular working hours, and CONTRACTOR will nol qu;H~ly Iht runcti[m~ ,nd ;~chicv~ Ih~ rc~ult~ ~'ullcd ~,r ~'rmH ov~rhmc w~)rk or the pcr[urm:mcc o~ Work on S;~l- Ibc gcncr;H d~ign, be ~imil;~r and o~ cqu:d ~u~xl;~nvc I~rd.y. ~unda)' ~r ~n), Icg;d holiday without OWNER's wrJ[- Ih;~l spcci~cd and hc ~uilcd IO Ibc ~;m~c uxc a~ Ih:~ ~pc~'- ICh c{~n~cnl ~Jvcn aflcr prior wrJllcn nolicc Io ENGINEER. i~cd. Thc appli~ali~m will ~1;~1~' Ih;~l thc cv;~lt~;~li~n ~.4. Unlc~ ~lh~rwi~c ~pc~i~¢d in Iht Gencr;d Require- ('ON'I'RAc'r()R's achiev~mcnl ~[ ~.h~l;m~i;d m~'nl~. ('{)N'I RAC"I'()R ~hall furnish and ;~x~umc roll re,pon- lion un linm, wh~lh~r ur nol i~'~'~pI;m~-e {~1' Ih~' x~hd~ty fur all malcri;d~. ¢quipmcnl, labor, lran~rlulion. ~or use in thc W{~k will rcquir~ a ch;roSe in ;mi' -' ¢~n~lruclion ¢quipmcnl and machinery, Ioo1~, appliances. Conlract Ducumenl~ {or in Ih~ provisi~m~ ~ ;my fuel. ~wcr, li~h~, h¢;~l, l¢lephon¢, Waler. ~anilary ~cilitlcs, direcl conlrucl wilh OWNER ~ur w~rk on Ibc I~r~jc~'ll h~ Icmporary f;~cilili¢~ and all olhcr fncililics and incidcnl:ds adupl Ihc design lo Ibc pr~)po~cd ~uh~lilul¢ and ~h~'lhcr -- and c{~mplclion o[ Iht Work. with Ibc Work i~ suh~cc[ lo paymcnl orany lic'cn~c loc {~r r,w;,hy. All varlalions {fflh¢ proposed substitute I'rom thai OWNER and ENGINEER and .if CON'rR^c'r()R ha~ ~p~'cilicd ~'ill hc idcnH~cd in Ibc application and available submillcd a list Ihcrcur in accordance wilh Ibc nt~.nlcn.ncc, rep;fir and rcplnccmcnl service will be indi- mcnlary Condhions. OWNEE's or ENGINEER'~ cnl~'d. Thc ;~ppl~calion will uno toni;fin an itemized csli- anco (cilhcr in wriling or by ~ailing Io make wrillcn ~hjc~- m;H~' o[all eo~ Iha[ will rc~ull dirccHy or indircclly from lion [her¢lo by Ibc dulc indicntcd [~r acccpl;mce or ubj~c- ;~ccepl;~ncc of ~t~['h hl~h~lilul~', including COhl~ or rcdcsisn linn in Iht hiddin~ documcn[~ ur Ihe C'unlrucl and cl;fimx o~ Giber conlracl~r~ alTcclCd by Ibc rcsullin~ of any ~uch Subconlraclor. Supplier or ulhcr pcr~m or ch~mF~, nil o~ ~'hlch xhnll hc conxidcrcd by ENGINEER oreanizaHon ~o idcn[i~cd may h~ r~voked on Ih~' h~i~ in cval,ulin~ thc propn~cd ~uh~Hlutc. ENGINEER may reasonable ob~ccHon ,r~cr duc invchli~uHon, in ~hich ~'~c require CONTEAC'I'OK to furnish al CONTRA~'OR's CONTRACTOR ~hall submit un ucccpl~blc ~ub~dturc. ex~n~c additional data ubOUl Ibc proposed subs~ilulc. Conlracl Price will bc increased by thc difference in Ihu cosl ~)ccn~ioncd by ~uch ~Uh~lilul~on and an appr~pr.dc 6.7.~. I~ ;~ ~ci~c mc3n~, mc~hod, tcchniqu¢, sequence Chan~c Order w~ll hc i~ucd or Wri.cn Amcndmcnl ~n~d. or proccdu,c ofcon~Irnclion is indicated in or rcquircd by No acccpznnc¢ by OWNER ur ENGINEER el' an) Ihe Cumr;~c[ Documcn~. CONTRACTOR may furnish or Suhconzraclor. Supplier or t~thcr per,un or uliliz~, a ~uh~tilulc mc;,n~, m~lhod. ~equcncc. Icchniquc ~h;dl c[~n~tilul~ a waiver ofnny right ufOWNER ur ENGI- or procedure of construction acc~ptublc lo ENGINEER. N EER ~o rcjec[ dr]~'vdvr Work. if C()N'I'RACTOR ~ubmi~s ~ufficicnt information lo allow ENGINEER~dclcrminelha(lhcsub~tiluleproposedis 6.9. CONTRA~fOR~hallbeh~llyrcs~m~ibleloOWNER equ~v~dcnl ~o thai [ndic:~ted or required by Ibc Contract ~nd ENGINEER ~or all ~cls an~ omi~s~on~ of Ihe l)ocumcnt~. Thc procedur~ for review by ENGINEER Iractor~. Supplier~ and Giber persons and organizafion~ per- ~lll bC ~imih~r to Ih;d nrovidcd in pan,graph 6.7.1 us applied forming or furnishing any of Ihe Work under ;i d~rccl or by ENGINEER and ~ may be supplemented in Ihe Gen- indirec~ contract with CONTRA~FOR jusl a~ CON'I'RAC- eral Requirements. TOR is responsible ~or CON~RAC'I'OR'~ own acts and urals- SiGnS. Nothing in Ihe Conlracl Documcn~ sh~ll crc;nc any 6.7.3. ENGINEER will he allowed a reasonable time contractual rclalion~hip between OWNER ur ENGINEER ~'ithin which lo evnluutc each proposed sub~dtule. ENGI- and any such Subconlraclor. Supplier or other per,on NEER will bc Iht sole judge or acceptability, and no organization, nor shall il crcatc any uhligalitm on Ibc pnrl ~uh~thute will he ordered, inslnllcd or ulilizcd wilhoul OWNERor ENGINEER lo pay or lo sec lo thc pn)'mcn( ENGIN EER'~ pri~r wrillcn accept;ronco which will bc cvl- uny moneys duc any such Suhconlrnclor. Supplier or Giber dented by either u Chnngc Order or an approved Shop person or organlzulion exccpI us m;~y uthcrvisc hc required Dru~ing. OWNER tony require CONTRA~I'OR to fur- by ~ws and Regulations. nigh at CONTRACTOR's expense u ~peci,I performance guaranlee or other surety Wilh respect to any substitute. 6.10. The divisions and secHon~ o~H~e Spccificution~ and ENGINEER will rock,rd lime required by ENGINEER the idcnlificaHons o~any Drawings shall not control CON- and ENGINEER'~ con~uh,nts in evnluating subsfiluli~ms TRA~I'OR in dividing Iht Work umung Snhcnnlraclor~ ~r pro~cd by CON]'~AC'rOR and in m,king change~ in Suppliers or delineating Ihe Work Io bc performed by any thc Contract Documcnl~ occasioned thereby. Whclher or specific Iradc. nol EN(31NEER acccpl~ a propn~cd sub~tilulc. CON- 'I'~A~-! ON ~hall reimburse OWN ER for thc charges of ~.1 I. All Work performed for CON]'RAC'I'OR by a Sub- ENGINEER and ENGINEER's c~nsuhants for evalual- contraclor will be pursuant Io an appvopriale lng t~ch pro~ed ~ubsH[ute. between COHTRA~'OR and the Subconlracior which tific~lly binds the Subcontractor Io the applicable lerms ~nd conditions of the Conlract Documenl~ ~or the b~nefi[ 6.Z.I. CONTRACTOR ~hull no[ employ any Subcon- as required by paragraph 5.1 I. CON'FRA~'OR ~hall pay tractor. Supplierorothcrpersonororganization(including each Subcontractor a just share oF uny insurance moncy~ ~huxe ucceptnblc lo OWNER and ENGINEER us indi- received by CONTRACTOR on account oflos~es under poi- earned in pnragr,ph 6.~.2~. whether initially or us u sub,el- icics issued pursuant Io purugrnph~ 5.6 and 5.7. mu~e. against whom OWNER Or ENGINEER may have reasonable ubjccHon. CON'fRA~I'OR ~hull not bc required lo employ uny Suhcomr;~ctor. Supplier or other person or ~alenl Fees and urg~nizafionlofurnishorpcfformunyo[theWorkuguin~l &12. CONTRA~FOR shall pay all license fees and ~hom CONTRACTOR hu~ reasonable objection, alfies and assume ull cosls incident to the use in thc 68.2. If thc Supplementary Conditions requlrc thc munce or Ihe Work or the incorporation in Ibc Work o~ any idcmity urcenain Subcontractors. Suppliers or olherper- invention, design, process, producl or device which i~ *un~ ur organizations (including Ihosc who ute IO furnish subject of palcnt rights or copyrighl~ held by inhere. I~ u the principal i~ems ofmuleriul~ and equipment) Io be sub- particular invention, design, process, pr~uct er device mitred ~o OWNER in advance orlhe specified date prior specified in the Con,rue[ Documcnls ~or use in thc peffor- lo Ibc Effcclivc Dnle of Ihe Agreement for acceptance by monte of ~hc Work ~nd if ~o thc actual knowledge of OWN ER __ -9- or ENGINEER its u,~e is subject to p'-,tent rightsor copyrights place of Ihe Project which are applic:,ble during the pcrror- calhng for thc payment of'any license lee or royallylo others, masco orlhe Work. thc cxi`.tence of such righls shall be disclosed by OWNER in thc C'ontrllcl Documenls. CONTRACTOR shall indemnify and hold h~lrmlcss OWNER and ENGINEER and anyonc Use of Premises: dsrcctly or indirectly employed by ehhcr of them from and ag.i~n.,t all claims, d;lmag¢~. Ios`.cs and expenses (including 6.16. CONTRACTOR shall confine construction equip- mcat, Ibc storage of materials and equipment and thc opcr- :lllorncy,,' fccs and cotlrt and arb~tralion co`.ts) arising out of ulions of workers IO thc Pro. j¢cl site -',nd land and areas ides- ;my infringement of p:ltcnt rights or copyrights incident to tiffed in and permitted by thc Contract Documents -',nd other thc u',c in Ihc pcrformlmcc PI'the Work or rc.`.ulling from thc land and nrcas permitted by Laws and RcguI.Hions. right~- incorp~r;ition in thc Work of any invenlion, design, process, of-way, pcrmhs and c:,scmcnts, and e, hall nut unrc:,~,onahly producl or device not spcciRcd in Ih¢ OPhir:icl Documents, encumber Ihc premises with con,trues[on equipment or other and`.h;llldeFendall`.uchch,imsincunncclionwith;snynllegcd materials or equ[pmcnl. CON'I'RACTOR shall -',~sumc full tnl'ringcmcn! uf such riL.:hls, responsibility for any d;sm.'tgc lo any such I;lnd or arc-',, or to Ibc owner or occup;,nt thereof or o£;my hmd or arc;is conli~- uous Ihcrcto, rcsuhini,. [rom thc perform;mcr of Ibc Work. Perrnit~: Should any claim bc made againsl OWNER or ENGINEER t,. 13. Unit`.`. otherwise providcd in thc Supplcmenlary by uny such owner or occupanl bcc;su`.c of Ibc performance ('Pad,sion,,. CONTRAC'rOR shall Phials and pay for all con- ofthc Work. CONTRACTOR .,,hi, Il prumplly ;lllcmpt lu .`.etch: ~.lruction pcrmil~, lind liccn~cs. OWNER sh;dl as~,ist CON- whh st,ch other p.'lrly by ugrccmcnl ur olhcrwisc tc~,olvc '1R^C'T()R. ~'hcn nccc~,'~isry, in obi:lining such permits and cl~dm by arbitr;ition or i,t law. CONTRACTOR sh:dl, lo hccn,,c,,. (.'()N'l RAC'I'OR ,.hall pay all governmenlal ch:srgcs fullcs! extent pcrmittcd by Laws and Rcgul;it;on~,. inJcmnify ~,nd in,,pcclil)n fcc', ncccsxllry for the proscculion of thc Work, and hold OWNER and ENGIN ERR harmless from and ~. hich :sec :lpplic;ihlc al Ibc lime ofopcnlng of Bids. or if there idl claim`., d;,m:~gcs, lo`.,~cn and expense`, lincluding, hut not ;.ire no Hid,.. on thc Effective Pi. sic of thc Agrecmcnl. CON- limhed Io. fccs of engineers. ;irchhcct.,,. attorneys lind other 'l R AC'I()R ',h-,Il p;ly all charges of ulilily owner`, for con- profc`.`.ion;d.,, lind cuurl ;,nd .'lrbhr:ilion ¢o~l`.} ari~.ing direr,I). archon`, lo Ibc Work. and OWNER shall pay all charges of indircclly or con~cqucnti;dly PUl of any uCllon. Icg;d or cql,i. · ,uch ulilily owner.,, for cuphal costs relalcd Ihcrclo such as lablc, broughl by any such olhcr p;irly .'~gainst OWNER pi.sell inve~lmcnt fcc~. ENGINEER to Ibc exlcnt b.',scd on a ell, ira arising oul CONTRACTOR's performance o/' Ibc Work. Lo,ri Pad Regular/oas; 6.17. During Ihe progrc`.s of thc Work. CONTRAC'FOR 6 14. I. CONTRACTOR shall give all notices and shall kccp thc prcmlses free from accumul,ltiun`, of comply ~,'ilh all Laws and Rcgul~llion.,, .'lpplicablc Io fur- m;Hcrial,,, rubbish and other debris rc,,uhing from Ih,.' ni,,hing and performance o1' Ibc Work. Exccpl where otb- Al thc complclion of Ibc Work CONTRACTOR ,hall rcmo,.c crv, i,.c ¢~pre.,,,ly rcql~ircd by applicable L.'lws and Rcgu- all wa`.Ic m:~lcri:ds, rubbish lind debri,, from and ab~,lUl thc I.stion,.. neither OWNER nor ENGINEER .`.hall bc rcspnn- prcmiscs ts`. well as ;ill tool`., appli:snccs, construction cquip- .,,hie for m,lni,oring CONTRACTOR's compliance with mcnl :,nj m;ichincry. -'md surplu`, m;~tcri;ds, and ~,h;lll Icu,,c ;,n).. I.-'lw-.. or Rcgul;itions. Ibc site clcan and rcad¥ for occup;,nc¥ by OWNER. CON- TRACTOR a, hall reslure Io original condiGon all properly not 6.14.2. If CON'I'RACTOR observes Ih;si the SOcciR- designated for ahcration by Ibc Cuntr;,cl Document,,. catiunn or Dra~'ings arc ;ti variance wilh uny Lawn or Regulation,,. CON'FRAC-I'OR shall give ENGINEER 6.18. CONTR^C"FOR.~h.'dlnot Io;~d norpcrmh un)'p.srl prompt v, rittcn nolice Ihcr¢of. and any ncces,~ary changes ofany slruclure to bc loaded in ;in) re;tuner lit.it v, ill cnd.,ngcr ~,ill be aulhori/ed by one of Ihe method,; indicated in Ihe slruclurc, nor ?,hall CONTRACTOR subject an)' part p;sragr,lph 3.4. If C()NFRACTOR performs, any Work Ihe Work or -'ldj;~ccnl property to `.lrc~,,,c~, or prc,,,,urc,, Ih;ti kno~.'ing or having rc;~`.on to knt~w Ih;~l it is ¢ontr;iry to will endanger il. nsi~.'h I.;lw-., or Rcgul,stiLms. and wilhoul such notice lo I'~NGI N EER. CONTRACTOR shall bear all COSlS urising Ihcrcfrom: ho,,~ ever. il sh;sll not be CON'FRAC'I'OR's pti- Record Docut, ent$: ;ind Ih;l~ing~ ;irc ils accord;mcr wilh such Lawn ;md Ibc site one record copy uf ;dl l)~;s~in,c~. NpccdiC.IliOn-.. Rcgssl.sllon-.. Addenda. Wrillcn Amendment',. Ch;ing¢ {}rdcr,,. Direclivc Ch:inges. Field ()rdcrs ;sad ~,~rhlcn intcrpr¢liilion~ llSld clarificlitit~ns lis`.tied purnsl;inl Io p:sr;igr;iph 9.41 in Tares: order nnd ;mnotalcd lit .,,how ;ill ch;saFco, m;,dc dtlring f~.lS. (.'()NTRAC-rOR nh-'sll pay all sales, consumer, use $1ructlon.'l'hc~,crecorddocumcnt,,h~gcthcr~ith;lll;ippro~cd and t~ther ,,imit'-ir taxes required Io be paid by CONTRAC- samples lind a counlerpart of all approved Shop l)rlswing,, TOR in ;sccord'.mce v, ith the Laws and Regulations of Ibc will be avtlilablc lo ENGINEER for reference. Upon com- plction of thc Work. these record documents, samples and Shop Drawings will be delivered to ENGINEER for OWNER. 6.22. In emergencies ~,ffccling the .~:ffely or proleclion persons or Iht Work or property ul Iht stsc or ud~ccnl Ihcrclo. ~ CONTRACTOR, wi[houl special in~lrt~clion or aulhoriz~tion SafeO' ~nd Ptatectian: from ENGINEER or OWNER, is obligated Io act to provera Ihrealcned damage, injury or los~. CON'I'RA~I'OR ~hall 6.20. CONTRA~OR shall be responsible for inhialing, ENGINEER prompt w~len notice ifCONTRA~rOR ~-hcvc~ mainluining and ~u~rvi~ing all safcty precautions and pro- Ihal uny significant changes in Ihe Work or variuti~ms fromm ~ gr~m~ in connection wi~h ~hc Work. CON'I'RA~OR shall Ihe Con~ract Documents have been caused lhereby. IfENGI- take all necessary precautions for Ihe safety of, and shall NEER determines lhat a change in Ihe Comrac~ ~cumems provide ~he necessary prolccHon lo prevcnl damage, injury is required ~cause of the aclion taken in response ~o an ur Io~ ~u: emergency, a Work Direclive Change or Change Orde~ be issued lo documem Ihe consequences of Ihe ch:m~c~ ur 6.20.1. all employees on Ihe Work and other persons varialions. ~nd org~nlzatlons who may be affected Ihereby: -- 6.20.2. all Ihe Work and materials and equlpmenl Io ShopDrawln~sandSam~les: ~ incor~rated Iherein. whether in slorage on or off ihe 6.23. Afler checking and verifying all field measurements site: and and after complying wilh applicable procedures specified -- Ibc General Requiremenls, CONTRA~OR shall ~ubmh 6.20.3. other propemy al Ihe site or adjacenl Iherelo, ENGINEER for review and approval in accordance wi~h ~he including Irees, shrubs, lawns, walks, pavemems, road- accepted schedule or Shop Drawing ~ubmi~xion~ (~ec para- way~. ~lruclures, ulililies and Underground Facilities graph 2.9). or for o[her appropriate acHon if ~u indicated ~ desiFnuted for removal, relocalion ur replacemcnl in Ih¢ Supplementary CondilJons, five copic~ (unle~ ulher~ J~c course of con~lmction, specified in Ibc General Requirements) of all .Shop Dra~in~. ~hich will bear a slamp or specific written h)Jicafiun CONTRA~OR ~hall comply wi~h all applicable ~ws and CONTRA~OR ha~ satisfied CON3'RA~I'OR'~ ~ Regulations or any public ~dy having jurisdiction for Ihe bili~ies under Ihe Conlrac~ D~umem~ whh re~c~ h~ ~hc ~cly of~rsonsor pro~rtyorloprolect Ihem from damage, review orlhe submission. All submis~ion~ will ~ i~ury or loss; and shall erect and mainlain all necessary as ENGINEER may ~equlre. Thc data ~hown on Iht Sh~p safeguards for such safety and prolection. CONTRA~OR Drawings will be complele whh res~cl to quamiH¢~, dimcn- ~ shall holily owners of adjacent property and or Underground sions, Ipecified performance and design cri~erla. Facilities and utility owners when proseculion o~ [he Work and similar data Io enable ENGINEER lO r~icw Iht infor- may u~¢cl ihem. and shall c~p¢~1¢ with them in Ih¢ pro- malion us required. lection, removal, relocation and replacement of Ihcir prop- ~ erty. All damage, injury or Io~s Io uny property referred Io 6.24. CONTRA~OR shall ul~o ~ubmil IO ENGINEER in paragraph 6.20.2 or 6.20.3 caused, direclly or indireclly, for review and approval wilh such promptness a~ lo in ~-hole or in pa~. by CONTRA~OR. any Subconlraclor, no delay in Work. all samples required by ~he Comr;~c~ ~uppller or uny o[hcr person or organization directly or indl- umenls. All samples will have been checked by and ;~ccum- ~ ~eetly employed by any of Ihcm Io perform or furnish any or partied by a specific wrillen indicalion Ihal CON'IRAC'I()R Ibc Work or anyone for whose acls any oflhem may be liable, has satisfied CONTRACtOR's re~n~ibililic~ under shall be remedied by CONTRA~OR lexcepl damage or loss Conlracl D~umenls with respect Io lhe review of thc sub- a~ribu~able lo Ihe fuuh or Drawings or S~cifica[ions or Io mission and will ~ identified clearly as ~o m~erial. Supplier. -- Ibc ac~s or omissions or OWNER or ENGINEER or anyone pcrlinenl da~a such as catalog numher~ and Ihe u~c for ~hich employed by either of Ihem or anyone for whose acts eilher intended. of them may be liable, and not allribu~able, direclly or indi- rectly, in whole or in part. lo Ihe faull or ne¢lieence orCON- 6.25. I. Before submission or each Shop Drawing ur -- TRA~rOR). CONTRA~OR's duties and responslbili~ies sample CONTRA~OR shall have determined and yeti- fur the safety and pro[cctlon of the Work shall continue until fled all quanli~ies, dimensions, ~pecified performance c~i- such time as all Iht Work is compleled and ENGINEER has leria, inslalla{ion requircmenl~, mulerial~. ¢alalog num- i~sued a notice ~o OWNER and CONTRA~OR in accord- bets and similar data with rcs~cl Ihcre~o and reviewed ~ ante with parag~ph 14.13 Ihal the Work is acceplabl¢ (except or c~rdinaled each Shop Drawing or sample with u~her a~ ulherwi~e expressly provided in connection Wilh Subslan- Shop Drawings and samples and whh Iht requircmcnl~ lint C'umpletionl. Ihe Work and Ibc Conlracl ~cuments. 6.~1. CONTRACrOR shall designate a responsible re~ 6.25.2. Al Ihe llme of each submls~Jon. CONTRAC- re~enta~ive al the si~e whose duty shall ~ Ihe prevention or TOR shallglve ENGINEER x~-cilic wriHcn nulice of each accidems. Thi~ ~'r~on ~h;dl be CONTRA~I'OR's su~rin- variaHun Ihal Ibc Shop Drawin~ or ~ample~ may ha~e lendcnt unlc~ ulhcrwi~c designated in writing by CON- from Ih¢ mqulremenls of Ihe Conlracl Documem~. and. -- TRACI'OR m OWNER. in addilion, shall cause a speci~c nmation Io ~ made on each Shop Drawing submitled Io ENGINEER for review provided that :my st, ch cl:lim, d,m-',gc. Io~,, or expcn.,e and approval or c:,ch .,,uch vuriullon, atlribulablc to bodily in. jury. ,,icknc,,.,. di,c;,-.e or de:,lh. injury to or dc.,,truclion of langihlc propcrl), tother lit.in Ibc 6.26. ENGINEER will review and approve with reason- Work it.,,clf') including Iht Io~,~ ofu~,c rc,,ulting Iherc£rom and able promptnc.,,~ Shop Drawing,, and samples, but ENGI- lb) is cau,~ed in whttl¢ or in p:,rl by an)' n,:gllg~.-nt N I'~ER's review and approval will bc only rot conformance omission of CONTRACTOR. uny .~ubcontr;,¢~or. ~,n) v.,th thc d¢~,ign concept of thc Project and for compli;tncc or organiz;,tion dircclly or indirectl)' cmplo)'cd bt' ~m)' of Ihcm ~.ilh Ihe in~'orm;,tion given in the Contrac[ Documcnls and to perform or furni.,,h any of Ih¢ Work or :mt'one fur v. ,~h:dl nut Cxlcnd lo means, mcthods. Icchnlques. sequences acts uny of Ihem m:,y bc liable, regardlc,,,, of ~,~ heth~.'r or not or procedures uf'conslr~,ction (except where u specific means, it is eau,cd in part by a p',rly indemnified hereunder ~lr method, technique, sequence or procedure ofconslruclion is by or is imposed by Law and Rcgul;~tion,, reg;,rdl¢,,,, of thc indicated in or required by the Contrucl Documents) or to negligence of'any such party. .,,;.tfct), prccaulion,, or programs incident Ihcrcto. Thc review and upprov;d of a sept, rate ilcm as such will not indicate 6.31. In uny and :dl cl;,ims ag;~in,,t OWNER or I'~NC;I- :,pprov;d of Ibc a~,,,cmhly in which Ihe ilcm function~. CON- N ~..ER or uny o~' their con,.ah:mi,., agcnt~ or crop[o)cc,, '1HAC'rOR ~hall m;~kc corrcction~ required by ENGINEER. any employee of eON'tRACTOR. :,ny Subcomr;,.'l~,r. ;,nd ,,h;,ll rclurn Ihe required number or corrected copies of person or org:,nizalion directly or indirectly ~.'mplo) ed bt' Shop Dr,,~,'ing,, and .,,ubmlt us required new samples for review of ~hcm to perform or furni.,.h any of thc \Vork or ant'one for ;,nd approv:d. CONTRACTOR shall direcl specific attention whose acts any ut' Ihcm may he Ii,hie. the indemni£,.',tion in v.'riling to revi,,ion,, other th;~n Iht corrections called for oblig:llion tmdcr p.'~r:,graph 6.3(! ~,h;dl mil bc Iimih.'d ~n Bt' I?NGINEER on prcvio~,~ suhmhlals, way by any llmhation tin thc amot, nt or lype of compensation or benelJl,~ p;w:,hh.' hi. or for (.'()N'i'R^C"I (iR e~.27. EN(.;INEE. R'.~ review and approval of Shop Draw- or any such Subcunlractor or other per,,un or lng,, ur ~;~mples ~hull not relieve CONTRACTOR from under workers' or workmen's compensation act,,, di,,ah,lit) r~.-,,r~n,dbility f,,r ;,ny variation From Iht requirements of the bene~t act.~ or other employee benefit ;~ct',. ('ontr;~¢t I")o~c~m~cnt~, unle~,.,~ CON'I'RAC--I'OR h.'ts in writing ~:.dlcd I'~N(;INEER'~, allention lo each such racial,on at Ih~.' 6..'t2. The ohlig:,litm~ ed' C.'()NTRAC'TC)R ~,nd,.'r lim~: or ,,i,bmi-,,,ion a~ required by parug~-'~ph 6.23.2 and graph 6..'{0 .,,h:dl not extend to Ih¢ li:d~ilhy tel' ENC~INI'~L.H. I~NGINI';ER ha'~ glvcn written upprov:t! of'curb such varJ:t- ENGINEER's consultants, agents ur employec~, ari,,ing out lion bt' a hp¢cifie wrillcn not:ilion Ihereor incorporaled in or of thc: preparation or approval of map~;, dru,~.'ing,~, opinion,,. ;~c¢omp;,n)'ing the Shop Drawing or sample approval; nor rcporls, surveys. Change Orders. de,,ign~, or ,,p~.'cil~catiun,,. ~ill ;my approval by ENGINEER relieve CONTRACTOR from rc,,pon,,ibility for crror~ or omi,.siuns in Ihe Shop Drnw- ,n~:~, or Dom rc~.pon,,ibility for having complied with the pro- ARTICLE 7~O'I'}-iER WORK 6.."8. Where ;i Shop Drawing or sample is required by the Related tl'or~ at Site: Spec,fie;ilion,,. any roi;ired Work performed prior to ENGi- ?. I. OWN ER may perform other work reit, ted Itt Ihe N 1~ ldR '.~ rcvicw ;,nd ;ipproval of Ibc perlincnt submission will eot at thc Sile by OWNER's own force~, have other be thc ,,ole expcn~,e ;md responsibility of CONTRACTOR. performed by utility owners or lei other direcl cunt race,, thcrcf~lr which shall conlain General Condilion,i ~imilar Io the,,e. If Continugnl~ the t¥ork: Ihe foci Ihat such other work is to be performed wa., no! holed · in the Conlract Oocument~. written notice thereof ~*ill I~. 6..'~. f,.'ONTRACTOR .~hall curry on Ihe Work and adhere given Io CONTRACTOR prior lo .~turting uny ,,ach other Io thc prol2r¢~.~. ~.chcdulc during :dl df, pules or di,~agrccmcnts work: and. if CON"I'RAC-I'OR belicve~ Ih;,, such perfor- ,~ ith ()W N E R. No Work .~h;dl be delayed or poslponed pend- mance will involve additional expcn,,e lo CON'I'R^C"I C)R ing re.,idution of any di,,pules or dis:~grcemcnts, except as reqt~ires addilJ0n;tl time and the p:~rlie'~ ,re tm;thio lo ;q:rcc tx:tm;tied by p;,r:~r;tph 15.3 or It~, CONTRACTOR and ,s to the extent thereof. CONTRAC-I'()R m:,y n',;,k¢ ;1 O'~,'NI~R n~;~y othcr,.,.'i,,e agree in writing, therefor us provided in Articles I I and I~. '/.2. CONTRACTOR shall a~l'urd each utility owner ;,nd lademnificotfon: other contractor who is ti p;ffty to t, uch a direct conlr;,¢l ~..'ttt. 'ro thc fullc,,! extent permitted by Lnw.~ and Regu- OWNER. ii'OWNER is performint: the :,ddition;,I v, ork v, ~th I,lion,, ('{)N'I'RAC'I'()R shall indemnify and he:Id h;,rmlcss OWNER's employees} proper and ~;af¢ ;,c~.'c,.,; to the ~,ile -',nd ()V,'N [[R --,nd I-'NC;INEI~R :,nd their con,~ult;ml~,, agents nad a reasonable opportunity for Ibc introduction ;,nd ,,tort,ge ell' ~:mployce., from lind again.,t all el;tim.*., d;,m;,ge~. Ios~es and mater,:ds and eqt~ipment and thc execution ~tf ,,ach v, o~ k. e~l~'n~e,,, direct, indirect tlr con,;equential (inch~ding but not sh;dl properly connect ;md coordinate thc Wmk ,.~.'ilh hmitcd lei fee',,-',nd charges ufcngincer.,~, archhccts, altorneys CONTRACTOR shall du all cutting, lilting ;md p;,Ichmg eel' and tether profc,,~,ional,, ;,nd court and arbilration costs) aris- the Work thai may be required lO make it,~ .~everal p;,rt,~ conic ing out of or rct, ulting from thc performance of thc Work. together properly and integrate with such other work. CON- TRACTOR ,,hall mil end;lager any work ofolhers by Culling. lures which have bccn ulilizcd h)' I'-'NGINI"FI~ in prcpnrinl: ,,..xcn,. ;lling or olherv.'i.,c :dieting Iheir work and will only cul Iht Drawing., and or :dh:r Ihclr ~.'ork wilh the wrlttcn con.,¢nt of ENGINEER ;,nd Ibc olh..:r~. '~.ho~,.e work will he lidTecled. 'rh¢ dulic., and B.5. OWNER's r¢.,.pon~ibili~i,.'-, in re,peel or purehn,int~ rc.,pon.,ihiliti¢,, of CONTR^CTOR under this pnr:~graph ;Irc und malnl:lining li:lbility and properly in.,,urance arc ~,¢~ I'o~th -- for the hcncfil of ~uch utilily owners und olhcr conlraclors in par~grnphs 5.$ Ihrough $.~. Io IbC ¢.'xl¢fll Ih:il Iher¢ :~rc comparahlc provi.,,ions for Ih,: I'~'nclit ~tl' C'()N'IRAC'T()R in .,aid dirccl contrncl~ between 8.6. OWNER is ohligalcd lo excel,lc (.'h:mge ()WNI?R :md ',ach ulilily owners-'md olher ¢olm'aclors. indi¢;,led in paragr:~ph 10.4. 7.3. If:my p;irl or CONTRACTOR's Work depends for 8.7. OWNER's respo, nslbilily in rc.,,pccl of pror~.'r ~..x¢culion or r¢,,ull~, upon Ibc w~rk of :my ..,ach olher in~,pcclions. I¢.,l., and appruval~ is t,¢l furlh in p;~rng~.~ph 13.4. ~.'omr.l¢~or or milily ow ncr (or OWNER). CON'I'RAc'roI~ il un;~,;~ilnhle or un,,uh;~hlc for ..,uch proper excculion and de:ds with OWNEr's right In Icrmin:~l¢ ,.¢rvlc¢~, of C'()N- ~ re~uh~. C¢)NTRAC']'OR'~, failure so lo rcporl will con.,lilulc TRACTOR under certuin circum~l:lncc~,. an '-,c¢cpl:mce of Ibc olhcr work us fil and proper for inlegra- lion v. iih C'()NTRA(."f()R'~, Work cxccpl fur lulcnl or non- :,ppnrcnl dcf¢cl,, und dcficicncic~, in Ihc olhcr work. ARTICLE 9~ENGINEER'S STATUS DURING ~ CONSTRUCTION {.'aura/halloa: 7.4. Ir OWNER conlructs with others for thc pcrfor- -- m;in~.'c of o~hcr ~,ork on Ibc Project al Ihs she. Ibc person or 9.1. ENGINEER will bc OWNER'~ repr¢.,.~.'nlativc dtir- ~trg;mizaliun v. ho v, ill h:lw: aulhorily -',nd r~:~ponsihility for ins Ih¢ conslruction pcrlod. Thc duties and rc~pon,,d~ihli¢,, coordinalion of Ibc :lctivhie~ among Ihe various, prime con- and Ihe limhalions ol':mthorlty of ENGINEER a,, OWN ER',, Ir.i¢lor~ ,,,,ill he idcnlificd in Ibc Supplemcnl.'~ry Condillons. represenlalive during con~,lruclinn ;irc ~,ct forth in ~ and Iht ,,p~,'cific m-',llcr., lo hc covered by such :,ulhorily and Ir'jcl DOcumcnls and shall nol he cxlcnJeJ whhoul ~ rhicn r¢,p~m.,ihilhy will hc ilcmized..',nd Ibc cxlcnl 01'such .',ulhor- c0nscnI or OWNER -',nd ENGINEER. il )' ',nd r¢.,pon,,ihililic., .,,,'ill hc provided, in Ibc Supplemcnlary Condllhm,,. Unh:,,,, olherwi.,e provided in Ibc SuppIcmcnl:lry Visits to Si/e: -- (',,,radii h,q~',, nchher OWNER mir ENGINEER ~,h;dl have any ;..,~lh,..'~rll)' or r~..~,pon~il)ilily in rc.,pccl orsuch coordlnalion. 9.2. ENGINEER will make visils lo Ibc .,,.ile at intcr,~;d., approprlale Io Ih¢ various .r,,lare~, t~f con,.IruZllon lhe progr¢.-.s .',nd qunlhy of Ihe c~ccuted Work and lo drier- - AR I i(.'I.E g---()WNER'5 RESPONSIBILITIES mine. in general, ir Ibc Work i~,.procccding in :~ccordnnee with Ihe Conlmlcl Documcnl,~. ENGINE [".R ',,.'ill m)t be required IO ntak¢ exh;m.,tive or ¢onllnuou~, on-~,ite in.,~'¢hon,, to ch,.',, k g.I. ()~'NER ~h;dl i~,~u¢ all communic;llion., to CON- the qualily or qunnlily of Ihe Work. ENGINEER'~ ¢11o11,,, -- '1 RAC"r()R Ihrough ENGINEER. will be direcled Iow:,rd providing for OWNER a gre..,ler d¢~r¢¢ of confidence Ihal thc complelcd Work ~.,,ill confurm ~o thc IL3. In c'-,~,¢ or Ierminalion or Ih¢ employmenl of ENGI- Conlrac! Documcnls. On thc b;~.,,is of such vi,,il,, ;md on-,,ite NF.i:.R. OWNER .,,hall '-,ppo;nl ;m englnccr ;igain..,I whom observalions -',~ an experienced and qunlilicd dc~,i~n -- ('()NI'RA(.'r()R mukc., no re;,,,unnblc objecliun, who~e .~ta- slonal, ENGINEER will keep CI~.~NI~R informed al'Ibc prog- lu,, under Ibc Contrucl Documents .,ihnll be Ihal or ibc former tess or ihe Work and will endc:,vur lo guard O%'NER ENGINEER. Any di'~pulc in conncclion with such appoinl- defects -',nd deficiencies in Ih¢ Work. mcnl ,,h:dl he subject lo urhilr:,lion. N.3. OWNER .~h:tll furnish the dais required 0rOWNER ProjeclRr£rtsentation: underthcCunlraclDucumenl~prompllyandshaIImakcpay- 9.3. If OWNER and ENGINEER at:r'c¢. ENGINEER __ menl,~ lo CONTRAC'I'OR promptly airier Ihcy l~re due as will furnish a Resident Prujecl Rcprc~cnt:,liv¢ provided in par;sgraphs 14.4 and 14.13. ENGINEER in observing the perform;lace of Ibc ~,'ork. 'Ibc duties, responsibilities and limilnlion~, of ;tulh~rit)' #.4. ()WNER'.~ dulic., ill respect of providing lands and such Rcsidc,~t Prujccl Reprc~,cnlativc and a,,~,i,,I;ml,, __ ea',cment,, and providing engineering surveys Io eslablish las provided in the -gupplemcnl;sry Condition,,. If reference polnl,~ are s, el forth in p-',ragr;iphs 4.1 and 4.4. Para- deslgn:tles another agent lo rcpr¢~.enl OWNI"R al graph 4.2 refer~ Io OWNER's identifying and making avail- who is not ENGINEER's ~gent or employee. Ibc duli¢,. t, hletoCONTRACTOReopie~of'reportsofexplorallonsand responsibilities and limilution.~ of t, ulhorit¥ of ~,ueh olher le',l,~ of sub,,urf..,ce condilion.,i at Ihe site and in existing strut- person will be ns provided in Ihe Supplemenl;iry CondiliOn,,. ~.'lar~cation$ antflnter~r#tatlon$: Io ENGINEER written notice or intemion lo appeal from 9.4. ENGINEE~ will issue wilh reasonable promptness such a decision. nuch wriuen cluriRculions or i~t~relalions or Ihe require- meals or ibc Contract Documents (in Ibc form or Drawings Decisionx on Di~putex: ~r o~hc~'i~c} an ENGINEER may dcterminc ncccss~ry, which xha]l b~ coati,lent with or r~asonably inferable from Ihe 9. Il. ENGINEER will be Iht initial inlcrprclcr of ovcrnllinlcnl t~flhc Contract Docum~nls. IfCONTRA~OR requirements or Ibc Conlracl Documcnls and judge of Ibc bchev~n Ihal u wrhlcn clari6calion or inlerprclatlon jusHfics acceplabilily of thc Work thereunder. Claim~. disputes and an incrcune in thc Contracl Price or an extension of thc other mailers rclaling to Ihe acceptability or~hc Work or Con~rac~ Time and the panics are unable Io agree lo the interprelationofthe requirementsorlhe Contract Documcnt~ amoun~ ur extent ihcrcor. CONTRA~OR may make a claim pe~alning Io Ibc pc~ormance and furnishing o~lhc W~rL and Ihcrefor an prt~vided in ArHcle 11 or Article 12. claims under Articles ! I and 12 in rcapccl or ch:mgc~ in Contrncl Price or Contracl Time ~ill be referred lnllially It) ENGINEER in writing wilh a request for a formal decision Aut~od~e~ Variations in Work: in accordance with this paragraph, which ENGINEER g.~. ENGINEER may aulhorizc minor vnriuHons in Ibc render in writing within a rcuson:~hlc time. Written n~[icc Work from thc requirements o~lh¢ Cont~cl ~umcnts which each such claim, dispulc and other ma~lcr ~ill be delivered do nol involve an adjustment in thc Contract Price or Ihe by Ibc claimant Io ENGINEER and Iht olhcr party to Conlr;~cl Time and arc consislcnl with thc overall inlcnt o~ Agrccmcm promptly (bul in no cron[ I;n~r than thirly day~l Ih¢ Con~r:tct Documents. These may be accomplished by a after thc occurrcncc of Ihe cvcnl giving risc Ihcrclo. and Ficld Ordcr and will bc binding on OWNER. and also on written supporting da~a will be submiHcd to ENGINEER and C()NTRACTOR who ~hnll pe~orm Ihc Work involved Iheolhcrpa~ywilhinsixtydaysarlcrsuchoccurrcnceunlc~ promplly. If CONTRAS'OR believes Ih;ti a Field Order ENGINEER ullows nn addilion;d periled ur lime to u~ccrlatn j,~lificx an incrcnnc in Ibc Contr:tct Price or an extension or more accur;tlc dul~ in support t~r thc ch~im. Ibc C~nlracl Time and thc parlics arc unable lo agree as Io Ihe um~unl or cxlcnt Ihcrcor. CONTRA~OR muy make a 9.12. When runclionlng us intcrrrczcr and judge under claim Ihcreror as providcd in Article I I or 12. paragraphs 9.10 and 9.1 I. ENGINEER will not show par- lialily Io OWNER or CONTRA~OR and will nol be liable in conneclion with any inlcrprelution or decision rendered in Rejecting Defective Wor~: ~ood failh in such capacity. The rendering of a decision by 9.6. ENGINEER will have aulhorlty !o disapprove or ENGINEERpursunntlopn~graphs9.10andg. ll~¥ithrc~.cl t¢jeCl W(~rk which ENGINEER bcli¢vcn Io be ~l¢fectire. and Io any such claim, dinpul¢ or olhcr m:~llcr (c.~CCpl ;my ~ hich ~dlulxoh;tvcaulhorilylorcqulrcRp¢cialinspeclionorlenling h~tve been w;dvcd by Ibc making ur acccplnncc of fin;d of Ibc %'ork u~ providcd in paragraph 13.9. whether or not mcnl as providcd in par;~graph 14. Iff) will bcu ct~ndilion Ihc %'t~rk i~ fabric;Heal, innl;dlcd ur completed, prccedcnl lo ~ny cxcrci~c by OWN ER or CONI'RACI of such rights ur rcmcdicn a~ cilhcr m;~)' ~Hhcrwlnc h;~vc ~ndcr SAop Dro~'inzs. Change Orders and Payments: uf any M~ch cl~inl, dixpulc or olhcr 9.7 In ctmnecti~n wilh ENGINEER's r~spons~bilily for Sh~p I)r;~wingn and a~moles. ~ee paragraphs 6.23 Ihro,gh 6.2~ inclusive. ~tnhatlons an ~'NGIN~'ER'~ Rt~ponsiAilities: 9.13. Ncilher ENGINEER's uutht~rily Ioacl undcr Ihi~ 9.8. In conncclion wilh ENGINEER's rcs~nsibililics us Article 9 or elsewhere in Ibc Conlrucl Documcnln n~r uny Io Change Ordern. see Articles 10. I i and 12. decision made by ENGINEER in good R~i~h chhcr Io exercise or not exercise such aulhority shall give risc Io un) dieD' ~r 9.9. In cnnncclion wi~h ENGINEER's rcsponsibililics in responsibility uf ENGINEER lu CONTRACTOR. nn)' Sub- rc~cl of Aoolicntion~ for Payment. etc.. sec Article 14. contraclor, uny Supplier. or nny olhcr per,tm t~r urg;mi/nliun ~ormlng ;thy orthc Work. or Io a~n)' nurcly rut any ~1 ~hcm. DttrrmJnation~ for Unit Pricet: 9.14. Whenever in Ibc Cunlr;~c't Documcnt~ Ibc Icrm~ "n~ 9.10. ENGINEER will dcl~rminc Ibc aclunl qu:mtillcs ordcrcd". "as dircclcd". "an rcqnircd". "u~ allowed". nnd clnnnificutit~nn ~r Unil Price Work pcrG~rmcd by CON- uppruvcd" or Icrmn ~ like cfl~'cl ~r imp,~rt arc t~cd. or 'I'RAC'I'()R. I'~NCiINEER will review with CONTRACi'()R adjcclivcn "rcaxt~n:d~lc". "nt~it:d~lc". ";~cccplablc". EN(;INI~I(R'~ prcllndn;~ry dclcrminali~n~ on nuch nlallcrs ~r "~:~li~raclory" ur ndjcclivcx t~l' like cI]'ccl t~r impo~l arc ~'r~rc rendering ~ wrhlcn decision Ihcrcon ~by rccommcn- uncd lu dcncribc a rcq,ircmcnL dircclit~n, review t~rjndgmcnl do,ion of an Application fur Pnymcnl or mhcrwisc}. ENGI- of ENGINEER aa lo Ibc Work. il in inlcndcd Ih;~l NEER'~ ~riucn dcci~ion~ Ihcrcon will bc fin;il and binding requirement, direclion, rcvicw t~r judgmcnl will hc ~olcl)' In upon ()~VNER and CONTRAS'OR. unlcnn, wilhln lea days evaaltl;tlc Ihc Work for ctm~plinncc wilh Ibc ('~mlr;~cl 'I'RAC'I OR dclivcrn lo Ihc other party lo Ibc Agreement and winc). Thc usc or uny such Icrm ur mljcctivc ~hnll n,~l hc -14- effective Io assign Io ENGINEER any duty oraulhorily IO 10.4.3. changes inlheConlraelPrlceorConiract'l'im¢ %upcrvb, c or direcl thc furni.~hing or performance of the Work which embody Ihe substance pt' uny writlcn decision rca- ur an)' dui)' or authorily lo undcrlakc responsibility conlrury dcred by ENGINEER pur~uunl lo paragraph 9. I I; Io Ibc provi~ion~ of paragraph 9.15 or 9.16. provided Ihal. in lien o~ cxeculing ;my such C'hangc ()rUer. an appeal muyb¢ lukcn trom any ~uch dcci~ionin accordnncc ~.15. ENGINEER will apl be responsible for CON- withlheprovisionsorthcContraclDocumcnl~undupplic;~blc 'rRACTOR'smcan~,mclhod~,lcchniquc~.~qu¢nccsorpro- Laws and Rcgulalions, but during any ~uch appc;H. L'()N- ccdurcs of conslruclion, or thc ~arcty prcc;mlion~ and pro- TEAC'FOR ~hnll carry on Ibc Work and adhere IO gr;~m~ incidcn[ [hcrclo. and ENGINEER will apl bc re,pon- ross 5chcdnlc us provided in paragraph 6.29. ~ihlc tot CONTRAC'rOR's tuilur¢ Io perform or furnish Work in accord;moo with thc Contract Documcnl~. 10.5. I~notice otanychangc affccling Iht general ~copc pt Ibc Work or thc provi~ion~ or thc Collie.icl 9.16. ENGINEER will apl bc responsible tor Ihc acls or (inch~ding. bul not limited Io. Contracl Price or Conlr,cl om~ion~ of CONTKACTOR or ofany Subconlraclor. uny Time) is required by Ibc provlsion~ o~any Bond lo hc Supplier. or pt any olhcr person or organizalion p~orming Io u ~urcty. Ibc giving otany such nolicc will bc CON I'RAL'- or forni~hlng any pt the Work. TOR'~ rc~pon~ibilhy, and ~hc amount otcnch applicahlc will be udjuslcd accordingly. ARTICLE 10---CHANGES IN THE WORK -- ARTICLE I I--CHANGE OF CONTRAC'F PRICE 10. I. Without inv:did;Hing Iht Agrcemenl and wilhoul nolic¢ Io uny surety. OWNER may. at any lime or from time Io I1.1. The Conlracl Price conslitutc% Iht lo{al compcn- -- lime. order additions, deletions or revi,.ions in the Work; sa{ion (sub. joel lo authorized ud. justmcnls) payable to CON- Ihe,,e will be auihorized by a Wrillen Amendment. a Change TEACTOR for performing the Work. All dulics, rc~,pon,,bd- Ordcr,oruWork DirccliveChange. Uponrcceiptofanysuch ilics and obligalions as:.igned Io or undertaken by CON- document. CONTRACTOR shall promptly proceed with the TRACTOR shall bc al his expense withou! ch:,ngc in Iht -- Work involved which will be performed under th,: applicable Contract Price. condition~, of ibc Contract Documents (except as otherwise .,,r,:cifically providcd.I. 11.2. The ContraCl Price may only bc changed by u Change Order or by a Writlcn Amendmcnl. Any claim for an increase -- or decrease in Ih¢ Conlracl Price shall be bused on v, riHcn IO.2. If O~VNER and CONTRACTOR are unable Io agree nOliCe delivered by Ihe purly m;aking Ihe cl:lim It.I Ibc a,. to thc extent, ir un)'. or .-in Jncrc;a',c or dcc/'ca~,c in thc (.'onlrdct I'ricc or .'m cxtcn~ion or ~,horh.'ning of the Conlrnct party :md to ENGINEER prompH)' Ibut itl no cvcnl Lncr Ih. Hi 'J am,.., that ~,hould bc allowed us u rc~,ull ora Work Directive Ihirly days) after Ibc occurrence of Ihu event .giving ri,,c -- (.'hangc. u claim may hc made Ihcrefor us provided in Article the claim and slaling the gencr'.ll n:Hurc of thc claim. N,mcc of the amount of Ihe claim with supporting dal;~ ~,h.dl II or Arliclc 12. delivered wilhin sixty days aflcr ,,uch occ~trrcm.'c tunic.,, ENGINEER ullows an addition:al period of lime Lo __ I¢1..1. CONTRACTOR shall not be entitled loan increuse more accurate da{et in supporl ut thc claim} :and %hall hc in thc Conlrac! Price or un extcn:.ion of Ihe Con{ruer Time accompanied by cl:~imunt',, wriltCn Slalement thai thc v. hh rcnrn:,..-I Io uny Work performed Ihat i'~ not required by claimed covers uU known amounls [direct. indirect and con- the Contracl Documents us amended, modified und supple- sequenli:ll) to which the claimant is enlltlcd :l~. a rt,,alt of Ibc _ mca{ed a,, provided in par:lgruphs 3.4 and .1.5. except in Ihe occurrence of said event. All claim:, for ad.iu',lmcnt in Ihe ca,,.' of un emergency u~ provldcd in paragraph 6.22 und Contract Price shall bc determined hy ENGINEER in accor- e,,cept in Ihe c:,,,e of uncovering Work as provldcd in pure- dance with p.',r;~gr:~ph 9.11 if OWNER :md CON'I'RAC'I'OR graph 13.9. cannot olhcrwisc ugrcc un Ibc amp{mi in~,olw.'d. No -- for an adjustment in Ibc Contract Prh.-c will bc vahd il not 10.4. OWNER and CONTRACTOR shall execute appr~- submhlcd in accordance with thi~ pure,graph I 1.2. pria~¢ Change Orders (or Written Amendment:,) covering: 11.3. Thc vuluc o/'any Work covered by a Ch;~nge Ot',Jcr -- IO.4.1. changes in the Work which ute ordered by or of any clulm for an increase or decrease in Ibc Conlrncl OWN ER purnu:int Io p-'aragr:aph 10. I. urc rcquired because Price shall he dc{ermined in one of Ibc following ut' acceptance of dr'ftc{irc Work under paragraph 13. !.1 or correcting defect;ye Work under paragraph 1.1.14. or arr, II..1.1. Where Ihe Work involved is covered by -- agreed to by Ibc pattie,;: prices contained in the Contract Document,,. hy apphc'-~- tion of unh prices lo the ClUanlitien of the hem% invol,,cd i{I.4.2, changc,~ in thc Contract Price or Contrucl Time {sub, icc! to the provisions of puragraph~, I 1.9. I. Ihrot:gh which ute ugrccd {o by thc p-'~rties: and I 1.9..1. inclusive). -15- -- I 1.3.2. Uy mulu~d :i.cccp{:mce or u lump .,;urn (which Io Ibc other provisions orlhc Contr;,,'t DucL,mcnt,, in,,uf'~r m~).' inc.'hide ;in allo~.';mcc fur ovcrhc;~d and pre,lit n~! us ;ipplic.'lblc. nccc,,,,;~rily in ;iccord;[ncc with par~gr;,ph 11.~.2.1). I 1.4.4. Cosls ol'sl~cc~al cL,n~ultanl~ lin¢luding bul n~[ -- I I..~.3. On the b~lsis of [he Cost of Ibc ~,Vurk (dclcr- limitc,l to cn[~inccrs, ar~.-hilcct~,. Ic,,tin~ I.~hof~doriu,.. ,,ur- mined :i,~ provided in p--,ragr:lphs I !.4 and I 1.5) plus FI vcyors. ~lltorneys and ;iccounl~ml',I empl~)'ud I'~r (.'ONTRA(."I~OR's Fcc [or overhead and profit (d¢lcr- .~pccific[dly rcl;~lcd lo thc Work. mmcd ;,', provided in p:,r'-,,qruphs I 1.6 and I 1.7). -- I1.4..~. Supplemcnl:d cusip, including thc I'sdl,u, in~: -- I 1.4. Thc lurm Co~.l i.~r Ibc Work m¢;i.n,~ the sum ~.~l' ~dl TOE'.', crnpluycc~, Jncurri:d in di.,~.'h,r[~¢ ~,~£ dut~¢,, c~,,l', m.'ccs,,arily incurred [,nd paid by CONTRACTOR in heel. cd wilh ibc '~Vork. thc prL~l'~¢r per~'orm.',nce ol' thc Work. Irxccp~ a.~ olhcrwi,,c -- in umuunls no higher th;m thL~c prevailing in thc Ici. Jlily or Icn:~ncc. ot';dl m~Hcri-',]~,. ,,upplic,,. cquipmenl, m;~.-h~n- the Pro.iccl. shall include only the I'olluwing h~'ms and .~hull cry. appl[:,nccs, url3cc and tcmp~.,r~ry I',c~lilic,, [i.~ IhT ns~l include un)' ol' ih(: costs itemized in p;ir;~gr;iph I1.$; site ;ind hand tool~ no[ owm.'d hy Ihu '¢.'~ks.'r,.. u. ~trc ~.'on~tlmed in thc pcrrorm;,m.'u ~1' [he W,~rk. ;~nd -- I 1.4. I. P'.wroll co,l~ rut employees in iht direct employ Ic~,s m;~rkut v;,hlc ol'.~llch Jlcn~,, tl,~.'d hi. il n~l i;on,,Liil~¢d ~d' C()NTRACTOR in the pcri'orm;mcc ¢d'th¢ Work under which remit.in the pr~pcrty al' ,,chcdi.,Ic,, ol'.j~h cl;~ssi~culions ugrccd upon by OWNER empl~ycd full lime un Ibc Work .,,h~dl bc appurlJoned un m;~chincry and Ih~: r~rt~, Ihurei.~l' ~h¢lhcr ~..n~¢d ~hall include, hul nol bc limited Io..~al~ries ;md w:i.~cs n~rcumcnl'~ :lpprovcd by O'WNER ,u,,iHi. Ibc ~i.dvi~;~: ~r _ plu,, thc cosl ol' ['r[n~c bcncfils which sh;dl include soci;d ENGINEER. and Ibc Co~l~ or tr;i.n,,p~rl;i.liun. I~.*;~d~nF. ,,ccurily contributions, unemployment, excise and p'-,yrull unlo[~ding, install;uion, di~,m;i.nlling and rumu~,;H I-',tes. ~,'ork¢r~,' or workmcn'.~ compcnsalion, hcahh and Ihcree~l'~all in accord:,nvc ~,,'hh Icftu,, utr ~,nid rctircmcnl bcnc~ls, hunu~,c~, sick I¢;iv¢. vocation and hal- ;~grccmc' t.~. Thc rcnl;d orany ~,uch equipn,.'nt. __ id.w p;ly ;ippli~.';~hlc Ihcrclo. Such employees shall include cry ur p;irl~, .,,h;dl cc;t,,c whun the i~,,~.- Ih,.-rcofi', nu ~up~.-rinlendcn~,, and foremen a! Ibc silo. Thc expcn;,cs ur ncccs.',-',ry fur Ibc Work. I~.r'forming Work ;i.f~cr rc~ul;~r working hours, on __ aho~,~.' lu Ihu c~[cnl ;,~lh~)rizcd by OWNER. rcl,~lcd Io Ibc Work. '.md fur whi~.'h C()NTKA(.'I'()R I 1.4.2. Co,d ~,r all m;~lcrial~ ;md equipment I'urni.,,hcd · -,nd in~.'~rp(~r;ded in thc Work. including co,,Is or lrans- I 1.4.5.~. Dcpo~.il~; Io~,l fur cau,,¢*, other than -- F, urtulion and storage Ihcrcof. and Supplicrs'~icld ~crvices I:cncc ur CONTRACTOR. uny Suhconlruclor ur any- required in connection therewith. All cush discounls .~h;dl one directly or indir¢¢lly employed by any oF them ~r accrue lo CONTRACTOR unlt:~s OWNER depo.~it.~ rund,~ for v,l.ose ucls any wr them m:i.y b~: liable, und ruyah)' vhh CONTRACTOR with which to make payments, in paymcnls -',nd I'cc.~ I'ur pcrmil~ .'md li~cn~c~. All tr:i.dc di,.counl~, rcbalcs und r~:l'und~ and oil relurn,, 11.4..~1.6. Losses und d.'i.m:i.gc~, land [rom s,lc or ~urplu~ mu~eriul~ und cquipmcn[ shall ac~ruc expenses), not compcn~:i.led byin~urancc ur ulhcr~i~u. lo OWNER, and CON'FRAC'i'OR .',hall m.',kc pruvi~ion~ lo thc WL~rk ur olhcrwi~c ~u~l;~incd h) CONq RAL'I'OP. -- so Ihat Ihc)' m:i.y hc oh~;~incd, in conneclion wi[h ibc pcrf'~rm:~ncc and I'urni~hing Ibc Work [cxccpl k~c.,, :md d:mla~:c~ ~*~[hm 11.4.~. P, ymcnl~ m;~dc by CONTRACTOR Io the dcduclible umounlsorpropcrl)' in~ur,m.'c e~l;~hli~h~'d ~uhc~m~r:~cl~,r~ fl~r Wi.,rk pcrf~,rmcd hy Subcontractors. bi' OWNER in uccord:mcc wi[h p;,r;~gr;~ph .~.gL pr~- ~ I1' rc~4uircd I~)' OWNER. CoN'rI~^CI'OI~t sh;dl ohl;~in vldcd Ihey h;,vc rc~,.hud fr~,m c;i.i.~'.¢,, ~[hur Ih;~n '1 I,t AC"i'()i~ :md .',h;dl del,vet ~uch hid~ Io OWNER who anyone directly or indirectly cmpIo)'cd by ;,ny ul'lhem v'illlhundclcrminc, wilhthcadviccorENGINEER, which or I'or whose acts any of them m;,y hc li',hlc. Such -- h~d,. ~ ill be accepted. !1' ;i. subconlr;,cl provides Ih;Il Iht: Io~s¢.e, shall includ,: sclllemcnls m,d~: whh the v, ri~lcn ~uhc~mlr;i.clur i~ IL, hc p:i.id on' thc h;i.~,i~, of Cosl al' Ibc consort! and approval ed' OWNI-'R. No ~u~.'h W~rk I'lu,, a Fcc. thc Suhconlruc~or's C'o.~I of Ihc W~,rk d:~m:i.gcs und cxpcn,,cs shall bc included in the Co,I ,,,h;dl h~: dutcrmlncd in thc .,lame m;mncr u~ C'ONTRAC- Ibc Work Fur Ihe purpose o1' determining -- 'I'()R'~ C'~',t ~rlhc Work. All suhcunlracl~.~hallbc subjcc! TOE's Fcc. Il', however, any .~u~:h Io~, or rc~drc~ r¢con.~tructlnn nnd C'ONTR^C~I'OR is plnced CONTRACTOR's ~ in chnrgc Ihcret~f. C'ONTRACTOR shall be pnid for 11.6. The CON'I'RACTOI{'s Fcc allowed lo ~cr~icc~ a fcc proporlion;~le to Ihnl ~t:~lcd in pnragrnph TOR I~r ovcrhc;~d ;~nd profit hh;dl bc dclcrntincd I I.~.~. 11.6.1. amnlu;dlylicc~pl;d~l~ fixed fcc;or ifn~nc cnn -- 11.4.~.7. Thc co~l of ulilillc~, fuclund sanllary bca~rccdupon, 11.4,~.~. Mimer expcn~ ~uch a~ I~lc~nlm~, Ion~ 11.~.2. afceh;~c~l~nlhcfollo~in~pcrccnl;~c- ~.x~rc~u~c and ~imil;lr pcHy c~l~h h~nls in conncclion !1.6.2.1. for cosls incu~cd under pan~n~ph~ I 1.4.1 ~ilh Ibc ~ur~. and I 1.4.2, Ibc CONTRACTOR'~ F~ ~h;lll hc -- 11.4.~.g. ~o~I of prcmium~ for ~lddilion;d Bonds pcrccnl: und in~urunc~ rc~lircd h~au~c ol'chlm~c~ in Ibc und ~rcmium~ fi~r properly in~urimcc covcru~c wilhin 11.6.2.2. f~rcosl~incurrcdundcrpurn~rnph I1.~.~. Iht limh~ of Ibc dcduc~ibl~ amounl~ c~nbli~hcd by IbC CONTRAC'I'OR's ~cc ~h~ll bc ~'~ per, chi: ~ ~c, Ih~ m;~xim~m ullownhlc lo CONTRACTOR I I.$. ~'hc Icrm ~o~l of Ih~ Work ~h;dl noi include ~ny of accouni o~ ov~rhcud und prn6z of ull Suhconlrilclor~ ~hc ~ollo~ in~: shall b~ ~fl~cn pcrc~nl: I1.~.1, Pu~r~llco~l~undolhcrcompcn~ulionurCoN- 11,6.2.]. no fcc ~hnll bc payable on Ibc 'I'~A~I'()R'~ of6ccr~, cxcculivc~, principnl~ {of p~rln~r- cosis ilcmiz~d under pam~r;lphs 11.4.4, I 1.4.~ and I I.~: I.~nl~, p~r~hn~in~ and conlra~lin~ u~cnl~, ~xpcdhors, CONTRA~ORIoO~N~forany~uch Ilnlckccp~r~. clcrk~ ;md olhcr pcrsonncl cmploycd by rcsuh~ in ~ n~i dccrc~ in co~l ~ill hc Ibc ('()N'IRACTOR ~'hczhcr ul Ibc ~ilc or in CONTRAC* Ibc aclual ncz d~crc~ plu~ a dcducGon in CONTRA['- ~ '1'()~'~ principal or u branch uf6cc [ur ~cncr;d udmini~lra* TOR's ~c~ by an ~mnunl cq~l Io ICh p~rc~nl ~f Ihe lion o[lh~ Work ~nd no~ lp~ci~cally included in Ibc u~r~cd ncz dccreu~e; u~on ~chcdulc ofjob cln~ificulion~ referred Io in ~rnphll.4.1orspccifically~ovcrcdbyp~ru~rnphll,4.~ I1.~.~.~. when boih uddhion~ und credil~ arc ~ ull of ~-hich i~rc Io hc con~idcrcd udmini~lr;~livc cosls involved in uny on~ chan~c. Ibc udju~lmcnl in ~ON- ncl ~hun~c in nccorduncc ~'ilh p:~r;~ruph~ 11.~.2.1 ~ilc. II.], Wh~ncv~rlhcco~lofun~Worki~lubcdclcrmincd I1.~.]. Anyp~nofCONTRA~OR'~capilul~x~n~es, pursu~nl Io par~Irnph 11.4 or Ii.~. CONI'~AC'I'i)R ~ill ~ includm~ inl~rc~l on CON'I'RAC[OR'S c~pilil employed submh in form ucc~plubl~ Io ENGINEE~ ~n il~mizcd [~r Ih~ ~ork ~nd chur~cs a~nin~l CONTRA~OR [or brc~kdownlo~lh~rwilhsuppor~in~dnlu. dclin~u~nl __ 11.~.4. Co~I of pr~mlums for ~11 Bond~ ~nd for in~urun~ wh~lh~r or nol CONT~A~O~ is rcquircd by 11.8. !~ is understood lhuz CONT~A~[OR hu~ ~ncludcd Ih~ Con~r~cl Documcnls Io purcha~c ~nd m~inhiin Ih~ in Ih~ Conlr~ci Pric~ ~11 ullowunc~s so n~mcd in Ibc ~umc Icxccp~ for Ih~ ~o~ of premiums covered by sub- Docum~nls ~nd shull cuu~c Ibc Work so covered ~ pur~r~ph I 1.4.~.9 ~bo~). by such Subconlrac~or~or Suppli~r~ nnd for ~uch Ih~ limil of Ibc allowances us may b~ ucccplnblc lu ENGI- I1.~.~. Co~Is duc I~ Ih~ nc~li~cncc of CONTRAC- NEER. CO~TRA~i'OR~Ir~slh;~I: TOR. any Su~onlraclor, or an~onc dir~clly or _. emplu)ed by any of lhcm or for whosc acts any ofthem 11.8.1. Thc allowunces include thc co~l IO CON- may be liable, including but not limited Io. the correction TRA~OR {less any applicable Irude discount~l of mule- of d~.cli~'e Work. disposal of materlul~ or equipment rials und equipment required by thc ullowanccx to hc dcliv' wrongly ~upplied and making good any dnmuge lo prop- ercd al Ihe site. and ;ill applic;ible laxCs: ~ erly. 11.8.2. CONTRA~FOR's co,Is for unlt~:ldlng and 11.$.6. Olher overhead or general expense costs of handling on Ibc site. lubor, in~t;dl:~lion cosl~, uvcrhc;~d. any Lind and the ctl~l~ of uny item not specificully and pro~ und othcrexpcnses contcmpl;,Icd for thc __ eaprc~ly included in pnragraph I 1.4. have been included in Ihe Conlr;,cl Price ;md not ;dlo~';incc~. No dcm;ind for additionul p;wmcn[ on uccount shull bc determined by ENGIN ERR in ~lccord~lncc with of ;tn)' thcrcof, wilt be valid, graph 9. I I if OWN ER '.lad CON'FRACTOR cunn~.lt ulhcrv, i.~c agree. No claim for an ad. juslmctll in lite Co(:lr'-,cl Time ~ill Prior to final payment, an approprialc Change Order will bc bc valid if apl submitted in accordance with thc rcquircmcnt:, i',,,ocd a'~ recommended by ENGINEER Io rencct actu;d orthispar:tgraph 12.1. ;~mtlunl~ dt~e CON'I'RACTOR on ;recount or Work covered ~,) ;~ll~,¢.;inccn..'lad Ihc C'ontr;~cl Price .,,hall bc corrc.~pond- 12.2. "]'Itc Contracl 'l'in~¢ will bc extended in an ingly adju'~tcd, equal to lime lost duc lo dcl;~ys beyond thc conlrol of' CON- TRACTOR if a claim is mndc Ihcrcfor as provided in para- graph 12.1. Such d~luys shall include, but not bc limited to. £'ni! Price WorA: acts or neglect by OWNER or other,, pcrf.~lrming ;,ddillon;~l 11.9.1. %'here Ibc (.'t~ntract Documents providc Ih;il work ns contcmp~;ltcd by Article 7. or Io ~rcn. f'ltlod,,. --ill or p;irt of. thc Work is to bc Unit Price Work. initially disputes, epidemJcs, abnorm;H wc;ithcr condition~ or act,, BI' thc C~.lnlr~ct Price will bc deemed lo include for all Unit God. P~icc Work an amount equal to thc sum of the est:~bllshcd unit prices for each ncpurat¢ly identified item of Unit Price 12.3. All lime limits slal¢d in Ibc Contract Documcnt~ %'t~rk lint¢,~ the enlimatcd quantity o1' e~tch item as indi- arc BI' Ibc cs~cnce o1' Ihe Agreement. The proviz, ions of c;itcd in Ibc Agreement. Thc estimated qu:tntitics ofilcm~ Article 12 shall not exclude recovery ft)r al.iT;igc,, linclt~d~ng ill' Unit Pricc Work urc apl gt~arantecd and arc solely rot but no! limlt¢d Io fees and ch;trgc~, of' engineers. ;trchitccl~. Ibc pt~rpo,~c o1' comp;triRon o1' Bids and dclcrmi~ing ;~n ;~ttorneys and other profcs~,ionals ;~nd coati ;md ;trbilralion initi;,I C'ontr;tct Price. Dclermination~; of Ibc aclu;d quan- costs) for delay by either p;,rty. ttt,.',~ ;tad cht,,sif~c;ttions of Unit Price Work perforated by CONTRACTOR will bc made by ENGINEER in accor- d.~n¢c ~,hh P,~r;~gr~ph 9.10. I 1.~.2. E;ich unit price will be d¢cmcd to include ;,n ARTICLE 13~WARRANTY AND GUARANTEE; am,lunl con,,idcrcd by CONTRACTOR to bc adcqu;ttc lo TESTS AND INSPECTIONS: cover C()NTRAC'rOR's uvcrhcud und profit for each scp- CORRECTION. REMOVAL OR un,~cl)' identified ilcm. ACCEPTANCE OF DEFEC'I'IVE WORK I 1.9.3. Where Ibc quantily oi' any item BI' Unit Price W~)rk pcrf'ormcd by CONTRACTOR differs materially Warranty and C~uaranlte: and *.ignif[canlly Prom the e:~timuted quantity of'such ilem 13. I. CONTRACTOR warrants and guarantee's, lo ind~culcd in thc Agreement andther¢in no corresponding OWNER ;tad ENGINEER th~,t all Work will bc in adju',,tmcn! ,¢. i~h rc',pcct to any other ilcm of' Work und ir d-'~ncc with thc Contr;tct Doctlmcnt~, ;tnd ~ ill apl be ~l~;/i'~'lt~ C()N rRACT()R hclicvc., Ih-',t CONTRACTOR h~,n Prompt noliCC or all dcf.ccl.~ .,~h;dl bc gi,,cn lo C()N'I'RAC- ln~.'tlrrcd ;Id,Jiti~ln;d cxpcn~,c a~, It rc~,ult Ihcrcol'. CON- TOR. All d~'ctit'c Work. wh~:lhcr tlr not in pi.fcc, re;H, I',c '1R.n,C"EC)R m;ty male u claim for ;~n incrca~.e in thc Con- rc. jcctcd, corrcclcd or ;icccplCd ;l~, pro,,i~h.'d m Ihi.,, ,.'~rli~:l~.' 13. Ir.icl I'ricc in ;iccord;incc with Arlich.' I I if thc parlics arc un;ihl~: to agree a',, to Ibc umounl o1' -',ny such incrca~.e. Access lo Worit: I."l.2. ENGINEER and ENC;INEER'~, rcprc.,cnt;llivcn. ^R'I'IC'LIE t"--CIIANGE OF CONTRACT TIME t)thcr rcprc~cl~l;ttivcs or OWN[.:R. ic.,tl,tg :lgcnci,..,. and g,,,, · lo thc Work ;ti rc;.l<,on~tblc tintcn f'~.)r Ihcir ob,crv;ition, tt~',i~'~.'tint.: I" I. 'l'hc Ct~ntr;l¢tTimc n~;~yonlyhech~ngcdbyaCh;ingc and Ic~,ting. CONTRACTOR ,,h;dl p~o,,idc pr~lpcr ;ind ,,.~1'~.' ¢)r~,h.'r tlr ;i Wr~Hcn Amcndmenl. Any el;liT f.or an cxlcn,,ion co=tditionx for such ~r ,,horlcnlng o1' Iht: Ct~nlr,lcl 'l'imc ,~h;tll be ha,,cd on wrillcrt n~li,.'c dchvcrcd by thc p;irly making thc claim to thc tllhcr p.irt) :tad Io ENC;I N EER promptly (hut in no cvcnt I;it¢r Ih;tn Te~t$ anttl,~pectiott$: Ihirt)' al,i)',,! ;ff~cr thc occurrence of. thc event giving risc lo 13.3. CON'I'RAC"I'OR.,,h;dlgivcENGINEERIimcl) all IbC cxlcnt ~lf If~c el;tim wilh r, tlpp~rting d-'rial .~h~dl hc dcliv- .'tpprov[ds. crcd ~tlhin ,,ixly d;ty,, ;,ftcr such ~cct~rrcncc {unless ENC;I- pi, hied hy Ibc cl~lim;,nl's writlcn at;Hcmcnt that Ibc ad. ju~,t- he inspected, tented {~r ,'apprtlvcd. {.'()NTRACT()R ~.h.,ll meat claimed in the entlrc -'ldjuxlment to which thc: clidmamt an,~umc ruff rcspons;h~lily thcrcl'~r, p;iy :ill c{~,.In in h.i., rc~,.~n I~ hcllcv¢ it in enlitlcd an a result tlr'Ibc occurrence Ihcrcwilh trod furnish ENGfN EI'~R Ibc rcqt/ircd ccrliliealc,, ~,ff ~ldd ¢~'cnl. All cfaim~, for adjuslmcn! in Ibc Cusip;icl Time of innpeclion. Icsting t~r tlpprov;d. CONTRAC'I'()R nh;dl ~,f.,~ he rc~.pon,,ible for and shall pay all COSlS in connection with thereof, CONTRACTOR may make u claim therefor a~, pro- uny in,,r,¢CliOn or le~ting required in connection with OWN- vided in Articles I 1 and 12. ER'~, or ENGINEER's acceptance ora Supplier of materials or equipment propo,,ed lo be incorporated in Ihe Work. or of Owner/Ifay Stop the Work: m, tcrial~,or,..quipmem submitted for approval prior to CON- 13.10. If the Work is defectlre, or CONTRACq'OR 'tN ACTOR'.~ purcha,,e thcrco£ror incorporation in thc Work. to supply sufficient skilled workers or suit;ibl¢ matcri:d., ~r Thc cu,,l uf-',II iht, portions, tesl~ and approvals in addition to equipment, or fails to furni,,h or perform thc W~lrk in ,,u~.'h Ibc ab,Jvc v, hJch arc required by Ibc Contract Documents w:W th;,t the completed Work will conl'urm lu thc ~,hall bc paid by OWNER lunlcss otherwise specified). Documcnls. OWNER may order CON'I'R^CTOR to .,I.t~p Ih,' Work, or uny portion Ihereof. until the c;lu~,c ft)r .,uch urdcr 1.1.5. All in,~pcctions, loses or approvals other Ihan those h;~s been cllminat,'d; however, this right or OWNER lu required by L;,ws or Regulations orany public body having Ihe Work sh:dlnot giv~ r~s¢ to-',~y duty un thc p;~n ui'OWN[;K jur~.,diction ~,h;fll be performed by organizations acceptable lo exercise thi~ right for Iht benefit of CONTRAC."i'C)R or to OWNER and CONTRACTOR {or by ENGINEER if so uny other party. ,,pccified). 13.6. If any Work (including Ihe work or olhers) Ihut is Correction orRemoval of Defective WorA: Iobein~pccted. lcstcdorapprovediscovercdwilhoutwrilten 13.11. lfrequircd by ENGINEER. CONTRAC'I'OR .,h.dl concurtcnce of ENGINEER. itmust, ifrequcstcdbyENGI- promptly, as directed, either correct oil d,.fct~ti~'e Work. NEER. be uncovered for observation. Such uncovering shall whether or sol fabriculed, installed or completed, or. if thc bc al CONTRAC'I'OR',. cxpeense unless CONTRACTOR has Work has been rejected by ENGINEER. rem,~vc i~ fr,m thc given ENGINEER timely notice of CONTRACTOR's inten- silo and replace it wilh n~,,tde~'~'tll'c Work. CONTRAC'I'()R lion to cover the same and ENGINEER has not acted with sh:dl bear all direct, indirect and con,..equential cu~,ts u/' ,,u,.h rca',onablc promptness in r¢~pon.,,c lo such notice, correction or removal (includit~g but not limited t~ fee~ charges of engineers, architects, attorneys and other pr~fc,,. 1.1.7. Neither observations by ENGINEER nor inspec- sionuls) made necessary lhereby. li~.~n,~. ICSt,, or upproval~ by olhcrs shall relieve CONTRAC- 'l'OR from CONTRACTOR's ubligallons lo perform the Work One Year Correction Period: in accord;ince with thc ConeY:tel Documents. 13.12. if within one year after the date of Sub,,ti,mini Complelion or such longer period of lime us may be scribed by Lows or Regulations, or by Ibc Icftu', ~.~f any t.'ncureri,g I$'orl~: c:~blc .~pcci;d gtJqrurHee required b)' Ibc (.'untr;~cl 1.1.~. If;lny Work i,, covered c[~nlr, try lo Ibc writlCfl request or by llny spectre provision of Ibc Cunlr;l~.'l Doeumenl~. an)' ~.,f ENC;IN EER. il nm.,I, if requested by ENGINEER. be Work is found lo be ,lc./~'e'th'c. EON'fRAE'fOR .~h,dl promptly. wilht~ut C(~xt Io OWNER and in ;record.race V, ilh OWNER',, unc~,,,crcd for ENGINEER's t~bxcr,.'atlt~n m~d replaced al C'(,1N l RAC.-I'OR'n expcn~,¢, wrillcn instructions, either ct)rrec'l such lliJ't't'll'l'f Work. or. if it has been rejected by OWNER. remove il from Ibc ,.,Ir 13.¥. If ENGINEER ctmsidcrs il necessary or advisable and repl:~cc it wilh ,t,ndcfccti~'e Work. If CONTRACTOR Ihal covered %'ork hc oh.,crvcd by ENGINEI"R or inspected does not promptly comply with lhe lcrm'~ of such ln~,lruct~on'.. ur ~c,,tcd by others. CONTR^C'TOR. ut r.NGINEER's or in un emergency where delay would cause scriuu,, risk of requc~,t..,,h~dl uncover, expose or othcrwise make available loss or damage. OWNER may have the dcfrctive Work cur. reeled or Ihe rejected Work removed and replaced, and all for ub.,crvution, in,~pec~ion 6r lesllng as ENGINEER may require. Ih:l! portion or iht. Work in question, furnishing oil direct, indircct and con,,cqucntial costs of such removal and ncce,,,,:try I;ihor. m:~tcri:tl and equipment, if il is found that replacement (including but not limilcd to fccs and charges ~r ,,ach Work i', ,h.J~,~ ti~'c. CONTRAC'I'OR shall .bear all direct, enginccrs, architects, attorneys and other professionals] v. ill be p;~id by CONTRACTOR. In special circum,,lan,:c,, v, here ina,reel and cc, n',cqucn~i;d costs of such uncovering, expo- ,,ur,.'. uh,,ervation, in,,pcciJon and Iesting and of satisfactory a particular item ofequip~nent is placed in continuous .,,crvicc rccon,,ttt,~'liun. (inehsding but nt)l limhcd Io fees and ch:,rgcs before Substantial Cumplclion pi'all thc Work. thc corr¢¢t,un ~,f engineer.,. :,rchitcct,,. :tllt)rn~:ys and ulhcr profcssionalsl, period for that item may Slate to run rron] un ¢arl~cr d.~c ir ~lnd ()¥,'N r'R ~,h~dl bc cntittcd !o :~n appropri:~tc decrease in so provided in thc Specifications or by Wrhtcn Amcndn~cnl. Ibc (.'onlr:tct Price. ~tnd. if thc parties :irc unable tu :~gree us Itl Ibc ;~m~,~unt Ihcrcor. m:~y mukc a claim Ihcrcfor u~ provided m Article II. Ir. however..~uch Work in not f~.~und Io be Acceptance of Defective Worlt: ,I,.I~., tA.c. (.'ON'I'RACTOR sh-'dl bc allowed 'i~n increase in 1.1.1.1. 1['. inslcud or requiring correction or renu)vid and Ih,..- f..'onlr;act Price ur un ex~cn,,ion of Ibc Conlrilct Time. or replacement of elrfei'tirr Work. OWNER tired, prior h~th. d~rcctly ~lttrilu,t;ihlc IL! .~uch unct~vcring, expos, utc. ENGINEER's rc¢ommcnd:,lion of lined p~lymcnt. t~h,,crv,ti,~n, in.,pccli,m. Ic~,ting amd rccon~.truclion; and. if £NGINEER)preferstoacceptit. OWNER maydu"o.C()N- the O.ltti¢~ '-trc un~hlc t~ ;igrce an lo thc amount or exlent TRACTOR sh~dl bear all direct, indirect and cu, n.'.,cqocntial c~v,t,, attribut-',ble to OWNER's evaluation of and determi- ARTICLE 14~PAYMEN'I'$ TO CONTRACTOR AND n;~Hon ~o :~cccp! ~uch dcJ'cc/ive Work (such cost~ to bc approved COMPLETION by EN(;INEER as to rea,.onablenc~s and to include but not h.c limited lo fec~. and charges of cng:incer~, archilccts, attor- Schedule of ~/alue$: nc)',, ;md olhcr orofc,~,,iomds}. If any such acccptancc occurs prior Io ENGINEER's rccornmendation of fi~lal paynlcnl, a 14.1. Thc schedule of value~ c~l:lbli~hcd ;l~ pr~vidcd ~n ~ ('h;~ngc Order ~'ill be i~ucd incorporating Ihc ncccs~ary rcvl- paragraph 2.9 will serve us Ibc h;l~is fur pr~grc~ p;~) mcnl~ ~ion~ ~n Iht Conlracl Doc~mcnls with rc~pcct to thc Work: smd will be incorporalcd inlo a form of Applic;~tion for and OWNER ~hall be cnlhlcd loan appropriatedecreasc in meal acceptable Io ENGINEER. Pro~rc~ p.~ymcnl~ accounl of Uni[ Price Work will bc b;=~cd on Ibc n[~mb~r Ih¢ ~'onlracl Price. and. if Ibc parties are unable Io agree as units complc~ed. ~ I~ I'hc amount Ihcrc(3~. O~VN~R may make a claim Ihcrcfor ;~ provided in Arliclc I I. If thc acccplance occurs aflcr such rccommcnd;Hton, an appropriate amount wilJ bc paid by ApplicalionforProgresxPofl'ment: C()NTRAC'FOR [oOWNER. 14;2. Allcasllwcnlydaysbcforce;~chprogre~p~)mcnt -- i~ scheduled (bul nol more orlon Ih.~n once a mo~tlh). C'()N- TRACTOR sh;dl submil lo EN(;INI~EI{ for rcvicw;m Apph- Otl',~'ER 3fa)' Correcl Defecli~'e Wor~: calion for Paymcnl filled oul and ~igncd by C()N'I'RAC'I'()R -- 1~.14. If CONTRACTOR failswilhina rcaxonablelime covcringlhcWorkcompIcleda~ofH~cd:Hcof~hcApplic,~Hon and accompanied by such supporling ducumcnl:~l~on ;,~ ;~flcr ~rillcn nolic¢ or ENGINEER Io procecd Io correct and required by Ihe Conlracl D[~c[~mcnl~. II'paymcnl i~ rvq~e~lcd lo correct ,h:l~'~ tiv~. Work [~r to remove and rcph~cc rcjcclcd on thc basis of malcrial~ ~md cq~ipmu~l nol inc~ p~*r;~lCd ~n ~'ork ;~ rcqHircd by ENGINEER in aecordancc wilh p;~ra- Ihc Work but dclivercd a~d ~tHl;~bly ~[~rcd ;~1 H~c ~itc or '-- gr.~ph I~. I I. ur if C'()N'I'RACTOR f;lil~ lo pcrlbrm lhc Work anulher IocalJon agreed I~ in writing. Iht ApplicaH,n ~n ;~cc~rd;~ncc ~hh Ibc Conlr;JCt Docismcnl~. or if CON- P~ymcnl shall also hcaccompanicd hy a bill of ~;dc. inv,~cc '1RAC' I()R I';~il~ h~ comply wJlh any olhcr provision of Ibc [~r oilier d~umcnlallon w;~rnmlJ~t~ Ih;~l OWNER h;~ rccci~.d ('onlr;~cl l)oc~munt~. ()WN ER may. aflcr seven duy~' wril- Ihc malcdals and cquipmcnl frcc and cle;~r of all lic~. ch;~r~c,. -- I~'n notice' Io C()NTRAC'rOR. corrccl and remedy any s~ch sccurily jnlcrests and encumbrancc~ {~hich arc herein;al'tot deficiency. In cxcrci~inglhc righ[sand remedies undcrlhi~ in Ihesc General Conditions rcl~rrcd Io a~ "Licn~"l and ~r:~gr;~ph (]WNKR ~h;~ll pre,ccd cxpcdiliously. To Ibc cxlcnt evidence Ihal Ibc maicrial~ and cquipmcn{ ar~' co~crcd by _ ncuc~;~r) It~compIclccurrcclivcand~mcdi~duclion. OWNER appropri;Hc properly in~uranL'c and [~lhcr arr,mgcmcnl~ m:~) e'xch~dc C'ONTRAC'rOR from :dl ur port of thc site.lake prolcct OWNER's inlcre~l Ihcrcin. ali of v hich ~ill bc ~;~l- p,~x~c~ion of oil or p:~rt of Ibc Work. and suspend CON- isfactory Io OWNER. Thc amount of rcl;*in;~gc ~vi~h 'IKAC'FOR'~ ~crvicc~ rch~cd thereto, t~kc possession of Ioprugrcs~paymcnlswillbcas~[ipuh~lcdinlhcAgrccmcnt. _ ['()NJ RAC' [OR'x Ioo1~. appI;;~ncc~, con~lruclion ;*nd n~.*chmcry al Ibc ~ilc ;~nd incorporate in thc Work all m.~lcn.d~ and ~'quipm~'nl ~[orcd at Ibc silc or for which OWN ER COA'TRACTOR'~tt'arranf~o~Tille: h.,~ p;'d C'ON'I'RAC'TOR but which are ~lorcd elsewhere. 14.3. CONTRACTOR warr;~nl~ and gu;~r;inlcc~ Ih;~l -- C'()NTRAC'IOR ~hull allow OWNER. OWNER's rcprcscn- Io all Work, malcrial~ and equipment covered by ;~n) Apph- I;,ti~ c~. a~-nl~ and employees such access tu thc t~l¢ a~ may cation for Payment, whether incorpor;~tcd in Ibc ProjcCl bc nccc~;~ry to cn;~blc OWNER lo cgcrcise thc rlghls and nol. will p[tss [o O~VNER no I;~lcr Ih~m Ibc lime [~f rcmcdi~'~ under Ihig p;tr;~gr;iph. All dirccl. [ndirccl and con- free and clear ofall Liens. -- ~cq~cn[i;d co~ of OWNER in exercising such righls and rt-m~-d~'~ ~ ill bc ch~rgcd ag;finsl CONTRA~rOR in un umounl ;~rprovcd ~=~ I~) rc;~onablenc~ by ENGI N E ER. and u Change Rev[e~ of App/icallons~or Progress ()rdcr ~ill bc i~t~cd incorpor;~ling Ibc necessary rcvi~ion~ in 14.4. ENGINEER will. whhin Ica d,~)'~ ;~l'l~'r receipt '-- tho' ('onlr;l~'l I)o~'Hn~cnl~ ~'Hh rc~pccl lo Iht Work; ;md c;ich Applic~Hion Ibr P,~ymc~)l. cilhcr h~lic:Hc h~ ~rHinF ('t,nlr;~cl I'ricc. ;mO. if thc p;~rlic~ arc un;~blc [o agree a~ Io OWNER. or rclurn Ibc Application Io CON'fRA~I ()R inJl- Ihc ;imounl Ihcrcuf. OWNER m;~y make a claim therefor a~ caling in wril~n~ ENGINEER'~ rc~)n~ for rcfu~in~ Io rcc- ~ pr~)~id~'O in Article I I. Such dirccl. [ndirccl and con~cqucn- [raimond pnymcnl. In thc I~stlcr [';t~c. CONTRA(-I()R m.~)' h.~l ~1~ ~ dl in,'hide hilt nol hc limilcd Io rccs and ch;irgcs m;ikc Ibc nccc~;iry ¢orrcction~ a(~d rc~td~mil th~. all ['otlrl ~nd ;~lhilr;~liOlt ct~l~ and all c~ls ur repair and nlcnl wilh ENGINEER's rccommcnd;~lion. Iht ;Hltounl fcpl.~u~'mcnl o[ ~'ork u~ othcr~ destroyed or dan~aEcd by ommcndcd will (~uh~ecl Io Ibc pruvi~ion~ tfflhc I;~t ~cnlcncc [orrccl~on. removal or rcplaccmcnl o~ CONTRA~'OR'~ u~paraeruph 14.7) bccomcduc~md~hcnd~c ~'illhcp;fid d,.Ic~ ~vc Work. CON3'RA~I'OR shall m)l bc allowed l~n OWNER Io CONTRACTOR. t'~lcn~ion o[ Ibc C'~nlracl Time bcc;m~c o[any delay in pcr- R~rn~;~nccol'lhcWorkuHrlh~lablclolhcex¢rci~cbyO~VNE~ 14.5. ENGINEER's rccommcnd;Hion u~ any p;~)'menl or ()WNHR'~ riFhl~ and remedies hereunder, rcqucsl¢d in Im Application [or Paymcnl will ['on~l~lul~' rk. prc,,cnt;lllon by ENGINEER to OWNER. bascdon ENGI- OWNER Io n scl-o/T ng;lin.~l Ihc amounl recommended, hut NI-:ER'~ on-line oh~crvaHon~ or Ihe ~ork in pro~rcs~ us an OWNER musl give CONTRAC~'OR immcdh~lc ~llcn notice c~pcricnccdand q~z;dificdde~ign protc~ional and on ENGI- (wilh a copy lo ENGINEER) ~;Hing thc rc;~on~ for ~uch NI~i~R'~ review, of Iht Applicalion rot Paymcnl and thc ~clJon. ;~ccomp.myin~ dills and schcdulc~ Ih;it Iht Work has pro- ~re~cd Io thc poinl indlc;lled: Ihal. lo Ibc bcs[ o[ ENGI- NEI:R'~ knowledge, in[otto;ilion and belief, thc qu[dily of Subst~ntlalCo,tple/ion: Ibc Work in in ~ccord~mcc with Ibc Conlracl Documents 14.8. When CONTRA~OR connidcr~ thc cntitc Work Inl~hjccl Io an cv;~hl:llion of Iht Work ;l~ ;i funclloning whole ready fur its inlcndcd usc C()NTRACI'OR xhMI pilot Io i~r upon ~tih~l;l~li~tJ Complclion. Io Iht rcsulls of any OWNER and ENGINEER in wriling lh;~t thc cnlirc Work ~uh,cq~enl Icxln c;dlcd I~r in Ihe Conlracl Documcnls. Io ;I substantially complclc (cxcepl for ilcm~ specific;ally lixlcd by lin.d dctcrmin;~lion ofqtt;mlltic~ and clax~i~cali~[ts for Unil CONTRA~OR its incomplete) and rcquc~l thai ENGI- Pr/cc Work trader p;~r;~graph 9.10. and lo any other qu;difi- NEER issu~ a ccrlifical¢ of Sub~t;tnliul Complcti,m. WHhm c:Hion~ ~l;~lcd in the recommend:ilion); and Ihal CONTRAC- a rcaxonablc lim~ Ihcrcaflcr. OWNER. CONTRAC'.I'OR /()R i~ cnH~lcd Io paymcnl of Iht amount recommended. ENGINEER shall m:&c an in~pccliun orlhc %'otk to dclct. IIo~c~cr. hy recommending any nuch p;~ymcnl ENGINEER mine thc stulus of complclion. If ENGINEER doc~ m,I ~ tit nol Ihcrchy he dccmcd Io h:tvc rcprcncnlcd Ihat cxh~,u~- sider thc Work subxlanlially complclc. ENGINEER ~ill live or conlinuou~ on-~ilc innpcctions havc been made Io CONTRAS'OR in wriHng giving Ibc rcasonn Ihcrcfor. If check Ibc qu:dity or Ibc quanlily oFIhc Work beyond Ibc ENGINEER considers Ibc Work suhxlunHally complclc. rc~pon~ibililien ~pccifically asnignc0 lo ENGINEER in thc ENGINEER will prepare and dclivcr lo OWNER u C'ontracl Documcnls or that Iherc may not bc olhcr mailers certificate ofSubslantial ComplcHon which nhull fix Ibc or innucn bcl~'cc~ Ih~ parties thai mighl cnlillc CONTRAC- of Substantial Complcllon. There shall bc ;H~:~chcd Io Iht 'i'()R lo bc p:tid addilit~nally by OWNER or OWNER to ccrlificatlc u Icnlalive Iisi ofitcm~ lo bc complclcd or ~i~hhold puymenl Io CONTRA~OR. rcclcd bcfor~ final payment. OWNER nh:dl have ~cvcn after receipt of thc tcntalivc ccrlificalc during ~'hich lo m:~kc 14.6. ENGINEER's recommendation of final payment wriHcn objcction lo ENGINEER u~ lo any provi~ion~ of will ¢onxlilul~ an addition;d rcprcscnlalion by ENGINEER ccrlificatc or allachcd Iisi. If. uflcr considering nuch objcc- Io O%'NER Ihut Ibc conditions prcccdcnt Io CON'I'RAC- lions. ENGINEER concludes th;il Iht Work in n~l 'l'{)R'n being cnlitlcd to linal p:wmcnl us scl forlh in paragraph liully complclc. ENGINEER will within G~urtccn da) ~ al'let 14.1~ h;ivc ~cn fulfilled, submission of Ihe Icnlalive certificate Io OWNER nolify CONTRA~OR in writing, sl:lling the rca~on~ Ihcrcfor. If. 14.7. ENGINEER may rcfus~ lo recommend Ibc whole after considerufion or OWNER's objections. ENGINEER a~r any p~trl of any O;~),mcnl if. in ENGINEER's opinion, it considers thc Work subsl:mliully complclc. ENGINI]ER ~uld hcincorrccl Ion~;~kc ~tlchrcprc~ent:~lion~loOWNER. wilhin said fourl:Cn d:lys :xeculc and deliver to I.N(;INEER may ul~o rcfu~c lo rccommct~d any such p;~y- and CONTRACTOR u definitive terrific:He of meal. ur. hcc:~u,c or ~uhacqucnlly dlscovcrcd evidence or Completion (with u rcvi~cd Icnl;~livc hat of i1c~11~ ltl hc Iht rc~ult~ of ~ub~cqucnl in~pcclions or lOSeS, nullify any such plctcd or correclcd) reflecting ~uch changc~ from Ibc Icntu~ c p.~)mcnt previously recommended. Io such calcnl as may bc ccrli~cale as ENGINEER believes ju~li~cd after nccc~sary in ENGINEER's opinion lo prolecl OWNER from orion ofany objections from OWN ER. Al thc llmc of dchvc,Y Io~ ~cuuxc: of thc Icntutive ccrti~calc of Sub~tunli:d Completion ENGI- NEER will deliver lo OWNER and CON'I'RA~I'OR a ~tittcn 14.~. I. Ibc Work in defective, or completed Work has recommcndalion as Io division of rcspon~ibilHics pending ~cn damaged rcqttiring corrccHon or replacement, final paymenl between OWNER and CONTRACTOR t~pcel Io security, opcralion, safely, mainlcnancc, hc.H. 14.7.2. Iht Contracl Pricc hun bccn reduced by Writ- utiliHcs, insurance und warranties. Unlesn OWNER and Icn Amendment or Change Order. CONTRA~OR agree olhc~i~c in wriling and so in~orm ENGINEER prior lo ENGINEER's K~uing Ibc 14.7.3. OWNER ha~ bccn rcquircd Iocorrect dc~'c- certificate o[ Substantial Completion. ENGINEER's uforc- ti~'r Wot k ur complctc Work in accordance with paragraph said recommcnd~tion will bc bindmg on OWN ER and CON- 13.14. or TRACTOR until final payment. 14.7.4. of ENGINEER's actual knowledge of Ibc 14.9. OWNER shall have Ibc 6ght Io cxcludc CON- ~currcncc of ,ny ifflhe cvcnln cmlmeralcd in paragraphs TRA~OR from thc Work aflcr Ihe dale of Sub~l;~ntiul 15.2. I through 15.2.9 inclusive, plclion, but OWNER shall allow CONTRACTOR rc:~onahlc accc~s Io complclc or correct ilcms on Ibc tent~ttivc li~t. OWNER may refuse lo make payment or ibc full amount recommended by ENGINEER becaunc claims have been Partial made againsl OWNER on accounl of CON'FRA~'OR'a per- form:rotc or furnishing of thc Work or Liens have been filed 14.10. U~e by OWNER o~uny finished p;~ri of the Work. in connection with the Work or Ihcrc are olhcr ilcms cnlllllng which hun speciflcully bccn Identified in Ibc Comracl D~u- -21- meats, or which OWNER. ENGINEER and CONTRAC- 14.10.3. No occupnncy or sep:lr;ttc opcratlon ofp;art TOR agrcc con`,titutes u scpnrutely functioning und useable or the Work w~ll bc nccompli.~hcd prior to compli,mcc p.n of Iht Work Ihat can be used by OWNER wilhuul sig- thc requircmcnts oF paragraph 5.13 in respect of property -- hi,cant inlcr'f'¢rcnce with CONTRACTOR's performance or insurance. Ihc rcmuindcr of Ihe Work. may be accomplished prior Io Sub`,tuntial Completion o/'all Ihe Work subjccl to Ihc fullow- lng: Final Inspect/on: __ 14.11. Upon wrillcn nolice From CON'I'R AC-I'OR t h;at thc 14.10.1. OWNER ut any limc may rcqucst CON- entircWurkoranugrecdportionthcreoFiscumplcte. ENGI. TRACTOR in writing IO permit OWNER to use any such NEER will make a final inspcction with OWNER and CON- part of the Work which OWNER believes to bc ready for TRACTOR and will holily CONTRACTOR in `,,,,ritmg of all ils inlcndcd usc and subsluntia[ly c0mplctc. If CON- particulars in which Ihis inspccllon rcvcal~ ih;at thc Work is 'l'RACTORagrces. CONTRAC-TOl?,willccrtifytoOWNER incomplctc or defer'tii.e. CONTRAC'I'OR ,,hall immcdi;atcl,v and ENGINEER Ihat saidparloFthe Work is substantiully lake such measures as are neccss:lry to rcrned)' such dc/t- complctc and rcqucst ENGINEER IO issue a certificate of ciencics. Suh,.tantial Completion for Ihat part of thc Work. CON- TRACTOR ut un)' lime may notify OWNER and ENGI- N EER in writing that CONTRACTOR considers any such part of thc Work rcady For its inlendcd usc and subst:m- FinalAi~plicati°nf°rPoyment: __ ti,dly complete and rcqncst ENGINEER lo issue a ccrtif- 14.12. After CONTRACf'OR h:ts complclcd all such cur- ionic of guhslanti;d Completion for Ih:it purl of thc Work. rcctions Io Ih(:: satisfaction of ENC;INEER and delivered ;ill Wilhin:lrcn,,on;iblclimc;Iflcrcithcrst,chrcqucst. OWNER. mainlcn;mcc and opcr:tling in,,trucliol:s. ,,¢hcdltlc`,. ['()N'I'RA(.'I'()R and ENGINEER .,,hall make an in.,;pcc- tees, Bonds. ccrtilicntcs or im, pcclinn, re;irked-up record __ lion or th;il part of the Work to dclcrminc ils slutus of documents (as provided in paragraph 6.19) and other docu- complclion. If ENGINEER docs not consider Ih:il part of tents--all as rcquired by thc Contract Documcnls. nnd alice Ibc YVork Itl be ~,,hslanli:llly complete. ENGINEER will ENGINEER has indicalcd Ih;il Ibc Wolk i,, ac(.'Cplable I,.uh- notif) ()WNER ;md CONTRACTOR in wrhing giving Ibc jcct Io thc provisions of parngrttph 14.16). CON'I'RAC'I'()R __ re;laos., therefor. II'ENGINEER considers Ihs[ part oFIhe may makc npplic.'ltion for fln;d payment follov..ing thc pro- Work lo be subsl:mli;dly complcle, thc provisions oFpara- ccdurc for progress payments. Thc fin;d Application fur graph`, 14.8-'md 14.9 will apply wilh respect Iocertification tent shall be accompanied by all documentation called for of Suh~.t;mtia] Completion of that part orlhe Work and thc in thc Contract Documcnls. together with complete -',nd Icg;all). --r di~ i,,.iOn of rcnponsibilhy in respect thcrcof and access effective releases or waivers (satisfactory lo OWNER1 of ;ill thereto. Liens arising out oFor filed in connection wilh Ihe %'ork. In Ilea Ihcrcof and as approved by OWNER. CONTRACTOR 14. IO.~'. OWNER may al any time rcqucsl CON- m,y Furnish receipts or releases in full: an affidavit of CON- _ TRACTOR in welling Io permit OWNER lo lake over TRACTOR that the releases and receipts include ;ill labor. opcralion c)r any such part of Ihe Work although it is sol services, matcri;d and equipment for ~ hich a Licn could bc ,~ub.,taniially complete. A copy of such requcsl will bc filcd, andlhal aH payrolls, material.'md equipment bill,,, and sent Itl, ENGINEER ;ind within a reason;thio time Ihcre- oilier indebtedness connected whh lite ~)Votk for ~hich __ ;trice OWNER. CONTRACTOR and ENGINEER shall OWNER or OWNER's properly ntighl in any way bc m:tke an in',,pection of thai part or Ihe Work to dclermine sible, have been paid or olherwi~,e sati.,ficd: and con,.cnt its ,,,l:ltu~, of completion and will prepare a li~t of the items thc surety, if any. lo fin;ti payment, if ;my Subcontractor or remaining Io be completed or corrected thereon bcforc Supplier fails to furnish a release or receipt in full. CON- fined p;i)'mcnt. IfCON"I'RAC'FOR docs not object in writ- TRACTOR m;ty Furnish a Bond or other cc, Il;alee;l] ing to OWNER ;md ENGINEER th:it ~uch part or Ihe Iory to OWNER to indemnify OWNER ag:tinct ;in)' Lien. Work i,, sol ready for scp:,r:ltc oper;llion by OWNER. ENGINEER ,,,.ill finalize Ibc list oFitems, lo be completed --. tlr corrected :lnd will deliver such lint lo OWNER and Final Payment and Acce£tance: CON'IRACT()R together with u written recommend:dion 14.13. IF. on Ihe b;asis of ENGINEER's ob,,crv,t;on or astolhcd*vi',ionofre'~.ponsibililiespending~nalpayment thc Work during construction and finial in,,pcclion. :md bct'.,.ccn OWNER and CONTRACTOR with rcspccl IO ENGINEER's rcvicw of thc fin:il Applh.'nllon fur }');tymcnt .... ,,.celerity. op. cr;tlit')n. ~.afety. mqinlcn;mcc, utililies, in,ur- lind accompanying documcnt;ition~all a,. rcqulro. I by Ibc ;in,cc. warr;mlic,, and gunr;mlcc.~ for th:it p;ir[ of Iht Wc)rk C'ontr;tct Documenls. ENGINEER in .,,ntt-lied th;al thc V,'~lrk ~hi(.'h will bccome binding upon OWNER lind CON- ha~beencomplcledandCONTRAC."]'()R'sothcr 'I'RAC'I'(}R at Ibc timc when OWNER takes over such under the Contract Document`, have been fulhllcd. -' opcr;dlon iunlc,~s Ihcy nh;ill have othcrwise:tgrecdinwrh- NEER will. within ten d:,ys arler rcccipl of IbC finnl Apph- ing ;md ,.o informed ENGINEER). During such opcr;ilion cation for Paymcnt. indic.'ttc in writing FNC;INEI".R',, roe- and prior Itl .S;uh`,lunli;ll Complclion or such purl or the ommcnd:ltion or paymcnl and orc.'..cnl Ihe Application ~,'ork. OWNER shall ullow CONTRACTOR reasunublc OWNER for p:lymenl. 'i'hcrcupon ENCiINI.'I:R will give - uc,,.'c,,~, to complete or curr¢cl items on auld Iisi and to writlcn notice lo OWNER lind CONTR.~{.'I'()R th,H Ih,..' Work compIclc uther rclnlcd Work. is acccplnblc l~ubjcct lo thc pruvi`,ion,~ or par;igr;.iph 14. I~. OIherwb. c. ENGINEER will return thc Application Io CON- CONTRACTOR's continuing obit'gallons under Iht Con- - TRACTOR. indicating in writing thc reasons for refusing to tract Documents; and recommend fin;d payment, in which case CONTRACTOR · hall make thc neccssnry corrections and resubmit thc Appli- 14.16.2. a waiver of all claims by CONTRACTOR cai:on. Thirty days uflcr prescnlatlon to OWNER of Ihe agnins! OWNER other than those previously made in wr,t- -- ApplicaHon and :,ccompanying documentation, in appropri- lng and still unsettled. ale form ;and ~uhsmncc. :,nd wilh ENGINEER's recommcn- d.~lion and nolicc or ncccpl:lhilhy. Ibc umoun[ recommended b) ENGINEER will bccomc duc and willbepaidbyOWNER ARTICLE IS--SUSPENSION OF WORK AND Io CON'I'R ACTOR. TERM I NATION 14.14. If. lhroughnofaul~ofCONTRACTOR, finalcom- r~ plt'lion or thc Work is significantly delayed and if ENGI- OwnerAlaySus,oendtVork: NEER so confirms,. OWNER sh.',ll, upon receipt of CON- 15.1. OWNER may. al .',ny lime and ~'ilhou[ cause. TRACTOR's final AppliC:llion for Payment and recommen- pend the Work or any portion thereof for a period of not more dalion of ENGINEER. nnd without tcrminaling Ihe Agree- Ih:,n ninety days by nolicc in writing lo CONTRACTOR and ~ mem. m,~ke p:lymcnt of thc balance due rot ihnl portion of ENGINEER which will fix Ibc date on ~hich Work v. ill hc thc Work fully completed and accepted. If the remaining resumed. CONTRACTOR .shnll rcsumc thc Work un Ihc d.llc b.dancc Io be held by OWNER for Work no[ fully complclcd so fixed. CONTRACFOR shall be allo~¢d ;.in incrc~sc in or ¢orrcclcd is less Ihan thc rctMn;,ge stipulaled in Iht Agrcc- Contract Price or un cxlcnsion ur Iht Contracl Time. or bolt,. ~ mum. and if Bond~, havc been furnished us required in pun~- directly allributublc to uny suspension if CONTRACTOR gr,ph 5. I. Ibc wriuen consent of Iht surety Io the payment makes an approved claim Ihercfor as provided in Arliclcs I I of thc bahmcc duc for that porlion of Ihc Work fully com- -',nd 12. pitied '-,nd :,ccepled ~,h:dl be sabra:Ired by CONTRACTOR -- its ENGINEER wilh Iht Applicalion for such paymcnh Such Owner l~l=y Terminate: p;o, mcnt ~hull bc mndc under Ihe Icrms and condilions gov- erning fin;d p:,ymcnl, exccpt Ih:il ii shall not conslilule a 15.2. Upon Ibc occurrence ur uny one or more or ~hc ~'aivcr of claims, following evcnts: 15.2.1. ifCONTRAC'TOR commences u volunlary Contrartor'~ Continuing Obligation: under any chaplcr oflhe Bankruplcy Code {Title I I. United 14.15. CON'FRACTOR's obligation lo perform and eom- States Code). us now or hereafter in eiffel, or ir CON. -- pl¢lc Iht V¢ork in ;~ccorduncc wilh thc Conlract Documenls TRACTOR lakes any equivalcnt ur ~,imilar action by Iii:ne · ,h.MI Dc ab.,olute. Ncilhcr rccommcnd:,lion ur uny progrcss a petition or olherwise under any other fcdcr;ll tlr tlr fin.d p;wmcnl by ENGINEER. nor the issunnce ora cfr- I;iw in effect al such lime liclaling lo thc' b, nkruplc)' hlic.sl¢ of Sub,l;inli:sl (.'omplclion. nor any pll)'menl by insolvency; -- ()WN I'~R Io ('I)N'I'RACT()I~. under Iht Contrncl Documcnl~,. nor any use t,r occupnncy ur thc Work or any pnrl ihercor by 15.2.2. if u pclillon is ~ed ;sgaln~l CON'I'RAC-I'()R {)WNER. nor any ac[ or acceptance by OWNER nor uny under any chaplet or ibc Bankruptcy Code u~ no~ or luilurc Io do ~o. nor uny review and approval or u Shop hereafter in eiffel al Ihe lime or filing, ur ir u pelilion -- I)ra~ing ur sample ~ubmi~slon. nor Ihe issuance ora nolice filed seeking uny such equivatenl or sim:htr reliul' ufacgcpli, hilily by ENGINEER pursuum Io purngraph 14.13. CONTRACTOR under uny olher federal or ~la~e I.,~ ~or ;my curreclion or,h~i.ctlre Work by OWNER will con- err~ct ul iht lime relating to bankruptcy or insohcncy: ~lilulc un acccplunCC or Work nol in uccordance wilh --' ('unlracl D~umcnl~ or u release of CONTRAC'FOR's obit- 15.2.3. irCONTRACTOR mukcs:sgcncraln~,ignmcnl g~ion ~o pc~orm Ibc ~'ork in accordance with the Conlract rot Ihe benefil orcredilors; I)~umcnl~ {except a~ provided in parugrnph 14.16}. 15.~.4. ir it Irusleg. receiver, cuMudinn or agcnl ~ CONTRACTOR is appolnlcd under ,pplic;sblc l.~w or under II'~irtr of Clo;m~: conlr~cl, whose appointment or authorily lo ~ake Il. Iff. Th~ m~king and ucceplnnce or final payment will or property ur CONTRAS'OR is fur Ibc purpose ~un~lilulg: enforcing a Lien againsl such propcrD' or for lhe purpose -- or general udminislralion or such property for Iht bone/il 14.16.1. a w,iver or all claims by OWNER against of CONTRACTOR's cr~dhors: C()N~RA~i'()R. cxccpl claims arising from unsenlcd Lien~. from d~ffCrdve Work nppearing ~fl,r final in,pfc- 15.2.5. ir CONTRAS'OR admlls in writing an inubsl- lion pur~uum Io p:magraph 14. I ! or from railur~ lo comply ily Io pay ils debts gcncrally as lhey become duc; ~ ilh Ihe Conlmscl Documenl~ or Ihe lerms of any spec:hi gu,r;mlcc~ ~pccificd Ihcrcin: however, il will nol consli- 15.~.6. irCONTRA~OR pcrsNIcnlly fifil~ Imf a waivcr by OWNER of uny rights in rcspccl or ihe Work in accordance wilh Ibc Conlracl D~umcnl~ linch,clinic, bill rH, iI limited lo. f:lilurc lo supply snRiclcnl 15.3. Where C'C)NTI~^C"i'()I(", ,.cra'icc', hnv¢ h¢cn ,,killed ~ukcr,, ~r ,~uhnhlc mnlcrinl.~ ~r cqulpmcnl or Icrminnlcd by OWNIJH. Iht Icznlinnzi,~n ~11 n~l ;H'l'c~-t [~nhtrc Io ndhcrc lo Ihc pr~rc~s schcdulc cslabli~hcd under ri~hl~ or rcmcdics ur OWNER ;~:~in~i C()N'I'~AC'I'()H Ihcn pnrn~r~ph 2.g as rcvi~cd From [imc Io lime): cxiszin~ or which tony Ihcrc:,flcr ~ccr,c. Any rclcnli~m ur paymcnl u~ m~ncy~ duc CONTRAC'I'()R hy OWNER 15.~.7. iF ('()N'FRACTOR disrc~nrd~ Lnws or Rcgu. hal rclcnsc CON'i'HAC'I'()R ~r~m linhilizy. I.~l~n~ ~r ;~ny public body h:~ving jurisdicliun; 15.4. Upon scvcn d~ys' wri~lcn n~Hcc ~ C()N'I'kAC'- IS.~.~. ir CONTRACTOR disregards Ibc au(horizy or TOR nnd ENGINEER. OWNER m:~y. wizh~u~ cnu~c and ENGINEER; or wilhout prcjudice Io any olhcr righ[ or rcmcdy, clcc~ ~o aban- don thc Work und I~rminn[c thc A~rccm~n[. In ~uch 1~.~.9. i[ CONTRACTOR olhcrwise violulcs in any CONTRA~FOl~hallbcpui~FurullWorkcxccu~cdandany ~uh~l:~ntiul why uny provisions oF Ibc Conlrucl Docu- txpcnscsusluincdpluRrcusonublclcrmin~lioncx~n~c~.~h~c'h mcnl~; will includc, but not bc limilcd lo, dircc[, indirccl :~nd scqucnli;d costs (including. bu[ not limhcd lo. [cc~ ;~nd OWNER may. urlcr giving CONTRA~OR (;md thc surcly, or cnginccrs, urchilccl~, utlornc)'s and other prufc~i~m~l~ iF Ih¢rc ~c ~nc) ~cv~n dnys' wriilcn nolic~ und to Ibc exlcn[ and cour[ und urb~lr:~lion cosls). ~rm~llcd hy Ln~'~ ~nd RcguhHions. Icrmin;llc Ibc scrviccs ~f CON] NAC'I'OR. c.xcludc CON'FRAC'i'()I( from Ihc silo ~md Ia/c p,~xscs~iun o~ Ibc Work and GEnii CONTRA~OR's Conlrnctor Afa7 5lo~ tt'or~ or Ioo1~. ;~ppli:mcc~. conslruclion cquymcnl und m;~chlncry ut 15.5. I~. Ihrough no ucl or [;lull oF CONTRACTOR. Ih~ Ibc ~llc nnd u~c Ibc ~;imc to Ibc Full c.xlcnl Ihcy could bc uscd Work is ~uspcndcd For a pcriod oF more Ihun ninety dny~ h) C'()NlRACTORIwilhouth,~bililyluCON'l'RAC'TORfor OWNER or undcr an ordcr ofcuurl or ~lhcr public uulhori~)'. ~rcxp:~ ~r convcr~it~n), incorpon~lc in thc Work nil mulcri;ds or ENGINEER [~ils Io act on :my Appliculi~m for I~,)-mcnl nnd cquipmcnl ~lorcd nl Iht silc or For which OWNER hn~ wilhin thirly dnys a[Icr il i~ suhnHHcd, or OWNER [.~ilx p,nd ('()N'I'~AC'I'()R hut v'hich arc ~lorcd cl~cwhcrc, und thirty dny~ Io p:~y CON'I'RAC'I'()E nny ~um linnlly dclcr- hm,h ~hc W~rk nx ()WNER mny dccm cxpcdicnl. In ~uch mincd Io bc duc. Ihcn CONTEAC'I'C)R tony. upon ~cvcn cd~c C'ON'FRA~OK ~h;HI nol bc cnlillcd Io rcccivc any days' wriucn notice to OWNER und ENGINEER. Icrmina~c [urlhcr pn)'mcnl unHI Iht Work is finishcd, i[ Ibc unpuid Ibc Agrccmcnt and rccovcr from OWNER puymcm For all h~l;~ncc ~ thc Conlracl Price cxcccds Ibc dirccl, indirccl and Work cxcculcd and uny cxpcn~c su~tu;ncd plus c~n~cuucnli~ll co~l~ o~ complcting Ibc Work lincluding but Icrmin;llion cxpcn~cs. In uddhion und in licu of n~ IlmHcd lo Fcc~ nnd ch:~rgc~ o~cnginccr~,urchizcc[~, alt~r- the Agrccmcnl. iF ENGINEER hu~ [~Hlcd lo ucl on un Apph- nc) ~ und olhcr proFc~xionnls and cuurl lind ;Irbilrulion COSlS) culion For Paymcnl or OWNER h:~x f;Hlcd Io makc uny pa) · ~u~h cxcc~ will bc pnid lu CONTRACTOR. I[ such co~ls mcnl as arorcsaid. CONTRACTOR tony upon sc~cn cxcccd ~u~'h unpaid huhmcc. CONTRA~OR ~hall P;W Ibc wrillcn nolicc Io OWNER and ENGINEEK ~[~p Ibc W~rk dHTcrcncc [~ OWNER. Such costs incurred by OWNER w~ll unzil puymcnl o[;~ll un~ounl~ Ihcn duc. ~hc pr~vi~i~n~ o~ ~h~ hc nppr,~vcd u~ IO rc;~onnblcncss by ENGINEER [~nd incor- pnragr:lph shnll hal rclicvc CONTRAC'FOR ~flhc D,r..cd in u Ch:~ngc ()~dcr. bul whcn c~crci~ing uny righl~ undcr p.rngrnph 6.29 lo c.rry un thc Work in ~r rcmudiu~ undur Ihi~ pn~grnph OWNER sh;dl nol ~ required wi[h Ihc prugrcss ~chcdulc und whhu~[ dcla)' during It~ t~htain Ihc Iowc~l price for thc Work pc~ormcd, and disagrccmcnls with OWNER. [Thc rcm:dndcr ol' this pugc wus IcFt bl~nk intcntionully.] AR'rlC'I.E if~-.ARlilTRATION American Arbilrallon Association. ;md u copy will bc .,eat E NG I N EER for inl'orm;~liun. The dent:md fur ;irhil r:~li~.~n ~ ill Ih.I. All ch,ira,,, di,~putcs and olhcr n'lullcrs in question be made wilhin Ihc thirty-d;~y or Icn-day period ~,p¢cilied in b¢l~,¢c~t OWNER ;~nd CONTRACTOR arising out of. or p;tragzaph 16.2 us applicable, and in all other ¢;t~,e~ within ;, rcl.~hn~: to Ibc Contracl Documcnls or Ih¢ breach thereof reasonable lime al'let Ibc claim, di,,pute or other ne',lief in Ic,~cept for ~:l;,[m,, ~hich h;~vc been w;~ived by the making or qucstion has ari.,~cn, and in no event sh;dl an)' ~,u~'h dem;~nd ;tceepldnc¢ of hn:~l payment :~ provided by par;,graph 14.16) be made ;trier thc dale when institution or legal or cquit;~bl¢ ~,11 be decided by :~rhilration in accord;.tnec with Iht Con- proeeeding~ ba.~ed on .~uch el;~irn, di,,pul¢ or olhe~ m~lter itt ...Iru~Jlion Indu,,Iry ^rbilrution Rules o1' the American Arbi- quc.~lion would be barred by Ihe ;~pplicable .~,l;~lute o1' Iralion A,,,,ociaHon Ihcn ubt:~ining s~,bjcct to [he limilation,, lotions. ol' Ihi-. Arlicle 16. 'l'hi,, agreement .~o to arbilrule and any olher :~gr¢cmenl or con,,¢nl lc) urhitrul¢ entered inlo in actor- 16.4. No urbitrullon uri'.ing out o1' or rel:,ting Io Ihe d.~nce here~.ilh ;~,. provided in Ihi.~ Article 16 will bc ,;pccifi- tract Documents sh:~ll inctudc by com, olid:Hion, joinder or in eMlyenf'~rce:~bleunderlheprcv;'illngluwol'un¥cuurlhaving any other re;inner uny other per,,on or entity lincluding ENGINEER. ENGINEER's agent'., empIoyc,.:~, or jur~,.d~ction, lurlls) who is no[ a parly Io this contract 16._. No dem;~nd for ;trbhr:~lion oruny claim, di~pulc or ~,~her m:~t~-r th:~t i~ required lo he referred lo ENGINEER 16.4.1.. the inclusion of.~uch other per.,,on ur entity in~ti.dl~' I'~r decixion in accord:race with par;~g~aph 9.11 will access;try il'complete relJefi~ Io be afforded among b~ m~,d~' until Ibc earlier of(u) the dale on which ENGINEER who are already parties Io the ;~rhitration. h-,x r~'ndered a decixion or lb) the lenth day after the part;cs have pre,,emed Ih¢ir c~idence to ENGINEER if a written decJ,,ion h~s nol been rendered by ENGINEER before Ihal 16.4.2. such other person or cathy is .,,ub~l;mtJally d.~te. No dem:,nd for :trbilration of any such claim, dispulc involved in a question o~'law or fact which is common ¢~r other mailer ,.,ill bc made later than Ihirty days l~flcr Ibc Ihose who ~rc already p:lrtlcs Io Ihe :trhilration and v. hich d,~tc on ~,hich ENGINEER has rendered a written decision will -',rise in such proceedings. in rc,,pccl i herc'ol'in :~ccordance with paragr:~ph 9. I I: and thc f'-,ilurc to dcm:md ,,rbitrulion within said Ihlrly days' period 16.4.~. Ibc wrillen consenl or lhe olher i'..'r..,on or ..,h:.ll r¢,~uh in ENGINEER's decision bclnl; final ,~nd binding sought Io bc included nnd of OWNER ,.nd CON'I'RAC'- upon OWNER -',nd CONTRACTOR. If ENGINEER renders TOR has been oblalncd for sueh inclm, ion. which cun.,ent ;~ d¢ciGon Ufler ,,thief.lion proceedings h,,vc been inhiz~led, shall make specific rererenc¢ to Ihis p;,rat~r'.~ph: hut .,,ac h dcei..ion m.~y bc entered ;is evidence bul will nut supercale such consenl sh;dl con~lJlUlC con,,chi Io ;irbilr;Hion of thc ~rhitr:Hion proceedin~:,~, exccpI whcrc Ihc decision is di~,putc not .~pccific;dly d¢.,,crihed in ~,ch c~.~n..enl ~,~r ;~cecpt:~hle Io thc p~rlie~, concerned. No dcm:md for arhitr;t- arhilralion whh any p:lrly nol .,,pecilic;dly idcnlilied m -.ach ll,~n ~,d' any v, rh~.-n d¢ci,,ion of ENGINEER rendered in con~,cnl. :,ccord.mce ~,,'ilh purugr~ph 9.1(.] will he fll:ld¢ lalcr Ih;m d.~),, .-,tier iht p:~rly m:~king ~,uch dcm:~nd hat. delivered w61- I~.'n nohc¢ I. II' illlenlion I~,1 ;ippe;ll ;1~ provided in p;in~gntph 16.5. 3'he uw;,rd rendered by Ihe arhilr;dLir,, v. ill h,.- lin.cl. 9. Itt. judgntcnl m:ly be enlered upol) il in a~ly court h~,,'ini: diclion Ihcrcol'. and will nol be ~,ubjecl lo modilic~tlion or 1fl..3. I'qolic¢ o1' Ibc dcm;md for Isrbhration will bc filed in r, ppcal cxcep! Io Ibc ¢xtent permhled by Secllon,, ILl and I I ~,.riling with Ibc other pnrly lo thc Agr¢¢menl and wilh Ih¢ orthe Federal Arbitralion Act (9 U.S.C. J~Jlll. I [Thc rcmaindcr of this page w-',s Ic~'t blank intentionally.] -- ^R'rlCLE 17--I~IISCELLANEOUS sion or act or Ihe other p;trly or or;Any or Iht L~lher (;i,'inZ A'ulice: is Icgidly liublc, claim will be mudc in writing lu thc ,~lhcr 17.1. Whenever uny provision of IbC Conlrllcl Poco- p~riy within a rc~som~blc time o[Ihc iir~l uh~crvuncc ~F~u~h -- mcnl~ rcquirc~ ibc givin¢ orwriHcn notice, il will bc dccmcd injury or dam;,gc. Thc pr~,vlsions oFIhi~ p;~ruFr~ph I~ ha~'c been v,lidly ~ivcn iF delivered in pcrson lo Iht indi- nol bc conslrucd as ~ suhstilulc [or or u waiver oF Ibc pro- ~iJu~l ~r lo a member oF Ibc firm or lo [iff o[ficcr o[ Iht visions o~ny appllcublc slululc o~limh:d{on~ or c~,rpor;~zion ~ur whom il is inlcndcd, or irdclivcrcd ut or sen[ ~ h)' rcFi~lcrcd or ccrHficd m;dl. po~lngc prep;Hd. Io [he last 17.4. The dulics and obliealions imputed by Ihc~c Con- hu~inc~ address known Io Ibc ~ivcr orlhc notice, ertl Condilions and Ibc ri~hls and rcmcdic~ or,diablo here. under IO Iht panics hcrclo, and. in p:~rHculur hul ~J~huul Computation o/Tim~: limilaHon, Iht w;t~anli¢~, guaranlcc~ nnd ohli~:dion~ I?.~. I. When any pcrlod oF lime is rcrcrrcd Io in the upon CONTRACTOR by pur;~¢raph~ 6.30. 13. I. 13. I~. I~. 14. ConlraCt D~umcnls by days. il will bc computed lo exclude 14.3 and 15.2 and all oF thc ri~hls and remedies u~.aih~hlc thc tirol unJ include Iht I:~st day oFsuch period. Ir~hc Iu~l OWNER and ENGINEER Ihcrcundcr. arc in uddhion day t~[ uny ~uch period ~dls on u S~llurda~ or Sundlly or und arc nOl to be cunslrUCd in tiny w~ly ;~ a limit;ii,un ~1'. ~n u d;~y made a Ic~ul holiday by thc law oF Ihc applicable rish[s and remedies uv~Hlablc lu uny or ~11 ul' them juri~dlclion, such day will bc omhlcd from thc compuza- o~hc~isc imposed or avuilahlc by La~s or Rc~uh~liun~. hy lion. special warranty or ~ua~nlcc or by other pru~'i~ions ul' Contract Documcnls. and iht provi~ion~ ur ihi~ -- 17.2.2. A calcndur day orlwcnly-~our hours measured will be as effcclivc as ii rcpcutcd ~pcciflcully in ~hc C'un~ruul [rom midnighl to Ih: nexl midnight ~h:dl con~tilutc a d[ly. Documents in connccllon wllh (;~'h p:~r~i~'uh~r duly. lion. righl and remedy Io which they ;ipply. All General: lions, warranties and guarantees m:~dc in thc C~nlr~cl I)~- 17..~. Should OWNER or CONTRA~OR su~cr injury umcnls will survlvc fi~ul puymcnl and Icrmin:~lion ur corn- ur dam:~gc ~u person or propc~y because oFuny error, omis- pie[ion o[ ibc Agreement. SPECIAL CONDITIONS -- AND TECHNICAL SPECIFICATIONS 1. SAFETY PRECAUTIONS: The Contractor shall comply with all applicable laws including the Occupational Safety and Health Act of 1970, ordinances, rules, regulations and orders of any -- public authority having jurisdiction for the safety of persons or property to protect them from damage, injury or loss. He shall erect and maintain, as required by existing conditions _ and progress of the work, all reasonable safeguards for safety and protection including posting danger signs and other warnings against hazards, promulgating safety regulations and notifying Owners and users of adjacent utilities. 2. MATERIALS AND WORKMANSHIP: No material which has been used by the Contractor for any temporary purpose whatever is to be -- incorporated in the permanent structure without the written consent of the Engineer, All materials to be used shall be new. 3. Where materials or equipment are specified by a trade or -- brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but rather to set a definite standard of- quality or performance, and to -- establish an equal basis for the evaluation of bids. Where the words "or approved equal" are used, they shall be understood to mean that the items referred to shall be proper, the _ equivalent of, or equal to some other item, in the opinion or judgment of the Engineer. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be in all cases fully equal to approved samples. Notwithstanding -- that the specifications in connection with a material, manufactured article or process, the materials, article or process specifically designated shall be used, unless a _ substitute shall have the right to require the use of such specifically designated material, article or process. 4. PERMITS: The Contractor will be required to secure any -- permits required for the execution of the Contract at his expense except for City of C0ppe]] Inspections Fees. However, if the Contractor requires overtime from the City of C0ppe]] _ inspection Department, then all overtime charges will be at the Contractor's expense. 5. BARRICADES, WARNING SIGNS & FLARES: Where the work on this -- project creates a safety hazard to the general public, the Contractor shall furnish and erect sufficient barricades and warning signs to warn the public of the danger and also provide _ sufficient flares or other emergency lighting to warn the public at night at his expense (no pay item). Page I of 3 6. RIGHT OF ENTRY: The right of entry to the site of any - project covered by these Contracts is reserved by the Owner, or the representatives of the Owner. Engineer, Texas State Department of Health, Texas Department of Water Resources for _ the purposes if inspecting construction both completed and in progress and materials on hand and installed. The Contractor will be required to cooperate with representatives of the State agencies connected with the project in any manner in which they - may direct. 7. FINISHED GRADES: Areas within the street Right-of-Way where _ grades are not disturbed or altered during utility or paving construction shall be re-established by the Contractor to the established grades existing (plus or minus 0.2 feet) prior to utility or paving final cleanup and smoothing of any affected - areas shall be done by blading and shall be subject to inspection and approval by the Engineer. Any re-staking of street and lot grades or re-verification of finished grades shall be bore _ at the utility or paving Contractor's expense. 8. CONFORMITY WITH PLANS: All work shall conform to the lines, grades, cross-sections and dimensions shown on the plans. Any -- deviation from the plans which may be required by the exigencies of construction will be determined by the Engineer and authorized by him in writing. 9. EXCESSIVE EXCAVATED MATERIAL (WASTE): Excavated on-site material not required as fill or for backfilling of improvements shall be stockpiled on site at a location or locations designated - by the Owner or Engineer, except that all large rocks, rubbish and organic or inorganic debris shall be disposed of offsite. 10. STAKING: The Owner will furnish the following stakes, to be approved by the Contractor's foreman or superintendent: one set of construction stakes of each of the following: · - a. Paving stakes, street and alley 11. EXISTING UTILITIES, STRUCTUP~ES OR OTHER PROPERTY: a. Prior to any excavation, the Contractor shall determine the locations of all existing water, gas, sewer, electric, telephone, telegraph, television and other underground utilities and structures. b. After commencing the work, the Contractor shall use every precaution to avoid interference with existing underground and surface utilities and structures, and shall protect the from damage -- Page 2 of 3 c. Where the locations of existing underground and surface utilities and structures are indicated, these locations are generally approximate, and all items which may be encountered during the work are not necessarily indicated. The Contractor -- shall determine the exact location of all items indicated, and the existence and location of all items not indicated. _ d. The Contractor shall repair or pay for all damage caused by his operations to all existing utility lines, public property and private property, whether it is below ground or above ground, and he shall settle, in total, cost of all damage suits. e. To avoid unnecessary interference or delays, the Contractor shall coordinate all utility removals, replacements _ and construction with the appropriate utility company. 12. REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work which has been rejected or condemned shall be repaired or, if it cannot -- be repaired satisfactorily, it shall be immediately removed and replaced at the Contractor's expense. Defective materials shall be immediately removed from the site of the work. Work _ done without line and grade having been given, work done without proper inspection, or any extra or unclassified work done without written authority and prior agreement in writing as to prices, shall be done at the Contractor's risk, and will be considered -- unauthorized, and at the option of the engineer, may not be measured and paid for, and may be ordered removed at the Contractor's expense. Upon failure of the Contractor to repair ._ satisfactorily or to remove and replace, if so directed, rejected, unauthorized or condemned work or materials immediately after receiving notice from the Engineer, the Engineer will, after gi~ing written notice to the Contractor, have the authority to cause defective work to be rendered or removed and replaced, or to cause unauthorized work to be removed and to deduct the cost thereof from any moneys due to the Contractor. 13. FINAL INSPECTION: The Engineer will make final inspection of all work included in the Contract as soon as practicable after the work is completed and ready for acceptance. If the work is not acceptable to the Engineer at the time of such inspection, he will inform the Contractor as to the particular defects to be remedied before final acceptance will be made. All work must be accepted by the City of C0ppe]] and the Engineer before retainage amounts will be paid. _ 14. The Excavation Contractor and Utility Contractor shall be required to coordinate their work with the Paving Contractor and shall schedule his work to avoid conflicts with Paving Construction; however, the Paving Contractor will not be issued a "Notice to Proceed" until all utility work in the street Right- of-Way is completed unless otherwise agreed to by the Utility Contractor. Page 3 of 3