Loading...
YMCA-CS 990211From the desk of... Ken Griffin, P.E. ATM Director of Engineering & Public Works "Gig 'em Aggies" u vv. 2 J 2 1 4 %f V,.% 0 OLO R 5 r G y n 1� S r v4a R : C em 2 �v SC K •9 City of Coppell P.O. Box 478 Coppell, Texas 75019 (972)304 -3679 /(Metro 471 -2251) r Y� 4 E w A i 91 ^ 0. �. 1 - 0 1 , 1 N01 °00'58 "W _ B. F. R. PER 1l SD- 7 1� ,. SAWCUT, REMOVE do DISPOSE Of t 175 1. Of CONIC. CURB do GUTTER TIE INTO EXIST. STREET, MATCH EXIST. GRADE MB� rA 1n oC1 Q.'e� A lM(, \ R, � a d�S4VS5i�� \ � / � o ►v.c(SLto►pPH� REMOVE EXISTING PAVERS AT ENTRANCE AND CONST 8'x 97' OF P ATERS PER CITY STANDARDS V 2. 0 tj� vP_ Lj A, a.o erg � a P P y x I la I m O 41 -- -- --� `------ - - Q Q K I V Q N -- ap Q I'OL ICE & COURTS FACILITY ADDITION ZONFD W 4p CITY OF COPPELL PAYMENT AUTHORIZATION MEMO Vendor #: Pay to: Address: Date: It Charge To: Rio ` un - pt- ivision- xpense Code) Amount: �� • ACCOUNTING USE ONLY Description/Explanation: r44;,� . 4L f�� °"► Approved for payment by: Date Paid Approval Check Number Invoice No. itt, i �,�.1 ` f ry Cipmonth City of Coppell C.I.P. Funds As of January 31, 1999 Funded Projects (408.68) Sandy Lake Road - City (343,963.00) Streets Issue Status Funds Denton Tap 84/85 Active 408.68 Surplus Funds 84/85 Surplus (21,208.60) Interest Income 95 Surplus 90,836.49 Sandy Lake Engineering 95 Active 100,000.00 Sandy Lake County 95 Active 130,244.81 Interest Income 95CO Surplus 9,445.65 Beltine Road 95CO Inactive 303,148.00 Interest Income 97GO Surplus 430,774.10 Sandy Lake Road - Construction 97GO Active 14,458.00 Interest Income 97CO Surplus 138,917.33 Wrangler Drive 97CO Active 1,219,891.52 Fairway Drive 97CO Active (152,979.05) MacArthur 97CO Inactive 535,000.00 Interest 97ACO Surplus 180,197.05 N. Denton Tap 97ACO Active 2,654,731.96 Wrangler Reimbursements 180,197.05 Fairway Traffic Signal Reimbursement 30,000.00 Zone 10 Impact Fees -Traffic Signal 16,052.60 Zone 10 Impact Fees - Wrangler 381,511.11 Zone 2 Impact Fees - N. Denton Tap 69,908.22 Zone 1 Impact Fees - N. Denton Tap 194,604.80 6,506,139.72 Uses Current Active Projects (408.68) Sandy Lake Road - City (343,963.00) Sandy Lake Road - County (3,419.74) Beltline Road (303,148.00) Sandy Lake - Construction (165,061.00) Wrangler Drive (1,651,000.00) N. Denton Tap (3,100,000.00) Airline Signal (16,052.60) Transmission Relocations (100,000.00) Geotech & Inspections (130,000.00) Concrete Bridge Rails - N. Denton Tap (200,000.00) 2nd High School Access ($240,000) 0.00 YMCA - Shared Access (10,000.00) MacArthur (535, 000.00) (6,558,053.02) Surplus (Deficit) Funds - Streets (51,913.30) Page 1 v COPPELL FAMILY YMCA 1203 Crestside Dr. Coppell, TX 75019 972.393.5121 Fax 972.393.5947 February 9, 1999 Mr. Ken Griffin City of Coppell 255 Parkway Blvd. PO Box 478 Coppell, TX 75019 Dear Ken: Here is the cost breakdown analysis for the installation of the shared approach between the YMCA and the city of Coppell. What we discussed earlier in the year was the city paying half of the cost. I made the changes that you discussed with Bill Anderson. Please review this and call Mark Lambert at Hill & Wilkinson or me if you have any questions. Sincerely, Curt Hazelbaker Executive Director f Young Men's Christian Association of Metropolitan Dallas Where everyone belongs COPPELL FAmmy YMCA 1203 Crestside Dr. Coppell, TX 75019 January 26, 1999 Mr. Ken Griffin City of Coppell 255 Parkway Blvd. PO Box 478 Coppell, TX 75019 Dear Ken: 972.393.5121 Fax 972.393.5947 U Z V % Here is the cost breakdown approach and the storm sewer of Coppell. The costs were a l problems connecting with the earlier in the year was the city a s for the installation of the shared co ection between the YMCA and the city it a higher than originally estimated due to xisting storm sewer. What we discussed , aving half of the cost. I need to discuss with you ' the very near future the landscape maintenance for the island we shar7sland the island to the west of us on Town Center Blvd. The west island appea have someone maintaining it already. We put an irrigation sleeve in the we share. Please review this Od call Mark Lambert at Hill & Wilkinson or me if you have any questiorv. Sincerely, Curt Ha:4 Director Young Men's Christian Association of Metropolitan Dallas Where everyone belongs January 20, 1999 Mr. Curt Hazelbaker Coppell Family YMCA 1203 Crestside Dr., Suite 300 Coppell, Tx 75019 1 HILL & WILKINSON, INC. General Contractors Re: Coppell YMCA (New Facility) HWI Project #2022 Storm Sewer / Paving Costs Dear Curt: J (D 7 rd CA Itemized below is a cost breakdown of the storm sewer and paving costs which are to be allocated ho 'dxe City of Coppell. Storm Sewer 45" RCP - 1271f @ $80.00/lf = $10,160 Connect to Existing = $ 8,601 Misc. (5 %) = 938 Total: $19,699 *Original estimated cost to connect to existing increased substantially due to the existing storm lines being filled with standing water. Method of installing the tie -in required specialized services and additional equipment / manpower. Concrete Paving 6" Thick - 2016sf @ 3.00 /sf = $6,048 Brick Pavers - 360sf @ 6.99/sf = $2,160 Excavation = $ 500 Misc. (5 %) = S 435 Total: $9,143 Grand Total: $28,842 L� 1 �o h �vP y �� 6 Should you need any additional information, please do not hesitate to call. Sincerely, HILL & WILKINSON, INC. Mark Lambert —�'– Sr. Project Manager Z.. Y-1 -0101 11969 Plano Road, Suite 190 • Dallas, Texas 75243 -5486 • (972) 437 -1600 • Fax (972) 437 -6708