YMCA-CS 980611 Coppell. Texas 75019
(/~-~/~ The City With A Beautiful Future 972-462-0022
.~une ! 1, ?:998
Bill Anderson, P.E.
Dowdey Anderson & Associates
5225 Village Creek Drive
Piano, TX 75093
RE: Coppell Family Y.M.C.A.
Development Fee Assessment
Dear M Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table~ along wi~ a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the am $9,450.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our o~.cc
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, / ~
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Coppell Family Y.M.C.A.
Date: 6/11/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $5,850.00 $5,850.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $192.15
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $142.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation/Fireline) $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $10,049.95
TOTAL AM'0-~ DUE PRIOR TO COUNCIL APPROVAL $9,450.00~
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell Family Y.M.C.A.
DATE: 6/11/98
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 8 ESU's
Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's
= ESU's
Fireline Meter(s): = ESU's
Total #: 13 ESU's @ $450.00 ea. $5,850.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea. $100.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $192.15 $192.15
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ $142.80 $142.80
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 0 Meter(s) @ $35.00 ea. $35.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Irrigation/Fire):
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ES 8 @ $450.00 ea. $3,600.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility. Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $0.00
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Coppell Family Y.M.C.A.
DATE: 6/11/98
ROADWAY IMPACT FEE:
Service Area * 2
Category ** Institutional
Land Use ** Others/Not Specified
Building Size (Sq. Ft.) 35,000
Development Units ** 35
Vehicle Miles per Development Unit ** 0.56
Fee per Vehicle Mile *** $300
Roadway ImPact Fee due ='"(Development Unit~ x ' ' I
(Vehicle Miles per Development Unit) x (Fee pe_r Vehicle M~Ie) = $5,880.00Il
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee ~tudy)
As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd.
& Sandy Lake Rd.. Therefore no Roadway Impact Fee will be collected on this project