Loading...
YMCA-CS 980611 Coppell. Texas 75019 (/~-~/~ The City With A Beautiful Future 972-462-0022 .~une ! 1, ?:998 Bill Anderson, P.E. Dowdey Anderson & Associates 5225 Village Creek Drive Piano, TX 75093 RE: Coppell Family Y.M.C.A. Development Fee Assessment Dear M Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment table~ along wi~ a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the am $9,450.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our o~.cc so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, / ~ Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Coppell Family Y.M.C.A. Date: 6/11/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,850.00 $5,850.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.15 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $142.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation/Fireline) $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $10,049.95 TOTAL AM'0-~ DUE PRIOR TO COUNCIL APPROVAL $9,450.00~ DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Family Y.M.C.A. DATE: 6/11/98 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 ESU's Irrigation Meter(s): 1 - 1 1/2 inch = 5 ESU's = ESU's Fireline Meter(s): = ESU's Total #: 13 ESU's @ $450.00 ea. $5,850.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $192.15 $192.15 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ $142.80 $142.80 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 0 Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation/Fire): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ES 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility. Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Coppell Family Y.M.C.A. DATE: 6/11/98 ROADWAY IMPACT FEE: Service Area * 2 Category ** Institutional Land Use ** Others/Not Specified Building Size (Sq. Ft.) 35,000 Development Units ** 35 Vehicle Miles per Development Unit ** 0.56 Fee per Vehicle Mile *** $300 Roadway ImPact Fee due ='"(Development Unit~ x ' ' I (Vehicle Miles per Development Unit) x (Fee pe_r Vehicle M~Ie) = $5,880.00Il * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee ~tudy) As per the 1980 Univest agreement this property can not be assessed for Denton Tap Rd. & Sandy Lake Rd.. Therefore no Roadway Impact Fee will be collected on this project