Loading...
Quest Care- CS 20190814 MEMORANDUM TO: Rolando Frias, iConstruct FROM: Marcus Marion, Engineering DATE: August 14, 2019 REF: Vista Ridge Questcare (The Plaza) - Engineering Pre-Punch List Clean the whole jobsite As-Built in CAD and DWG files 2 year maintenance bonds for 50% Water The domestic meter box needs to be adjusted to proper elevation The irrigation meter box needs to be adjusted Cut valve markings in the curb Proper color on irrigation controller box Sewer Square concrete pad around clean out Storm Sewer Clean out all debris in storm drain Streets Route and seal all surface cracks. General Mark fire lane marking on the curb in front of building. This is a PRE-punch list. We have to give Streets, Water, and Sewer Departments a 7 day notice for their walk-thru. Their list may be more specific than my list because ours is a quick visual, surface inspection. Our list needs to be complete prior to scheduling a Public Works walk-thru. Be sure to become familiar with pages 14 – 16 in the Pre-Construction packet. If you have any questions, please let me know.