Loading...
Quest Care- CS 20190828 IConstruct 08/28/2019 133 W McDerott Dr. Ste 200 Allen, TX 75013 RE: Final Acceptance Letter Vista Ridge (The Plaza), Lot3R Block D, Questcare Dear Rolando Frias: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds have been received. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond LC if necessary, will also be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Marcus D. Marion Construction Inspector II (469) 576-7707 mmarion@coppelltx.gov cc: Kent Collins, P.E., Director of Public Works Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director