Loading...
Woodlands-CS 951025EN~NEER~N~ - UT~LIT~E~ D~V~ON D~TE= TO: FROM= October 25, 1995 ?.arty Davis, construction Inspector ,/'~' IF' Howard L. Pafford, Utilities Superintendent Water/Sewer Final Walk Through for Woodlands of Coppell Utilities staff conducted a final walk through for the above referenced project this morning. The following item should be installed on the project for the system to meet state code: · Need 2" Blowoff in Cul-de-sac If you have any questions, please advise. HLP/bc