Loading...
ST9601-CS 9710171 I;3-17-- 1997 2: B4.PM FROM "' ,""' 1:::>.I IIIII II III I C 0 V E R ..... -- FAX S H [ E I To: Ken Griffin, P.E, - City Engineer Citt' of Coppell Fax #: (972) 304-3570 Subject: Wrangler Drive Reconstruction Project (Project ~tST 96-01 ) Date: October 17, 1997 Pages: 6, including this cover sheet. COMMENTS: Please see attached memorandum. Thanks. ~rom the desk of... Mich3el A. Jones, P.E. PrinCil~l Teague ~,~all and Perkins. Inc. 2001 W. Irving ~n,,Ing, Texas 75061 (972) 254-1765 Fax: (ej72) 25!-4348 10-17-1997 2:g4PM FROPL.. 4c6~,L~7 ~ P. 2 C 0 N S U L T I N G E N G l N E E R S T~l ~' 40- MEMORAND b oz o DATE: October 17.1~7 "xx, TO: Ken Griffin, P.E.- City Engin~r & ~ Z ~j, 7~,~o "',,, City of Coppoll ~ ,,~ '~',,~-, FROM: Michael Jones Wrangler Drive Recons~ction Project (Project ~ ST 96-01) City of Coppell Based upon our phone conversation earlier in the week. we have prepared the attached break-down of probable construction cost for the Wrangler Drive project. For the purpose of this cost break- down, we have dMded the project into Phases I & lI as follows: Phase I: Water Improvements - All water line improvements are included in Phase I. Storm Drain Improvements - Storm Drain Line 'B'. Pavjg_e~Improvements - The south half of the roadway from the west propert), line of the Coppell Middle School West tract (approx. Sta. 8+30) to the west curb return at Enterprise Drive (Sta. 14+22.08)- The full roadway froin the west curb return at Enterprise Drive (Sta. 14+22.08) to Belt Line Road (Sta. 43 +73.76). Phase lI: Water Improvements - None. Storm Drain Improvements - Storm Drain Line 'A'. PavinJ~ Improvements - The full roadway from Freeport Parkway (Sta. 0+82.83) to the west property line of the Coppoll Middle School West tract (approx. Sta. 8 + 30). The north half of the roadway from the west property line of the Coppoll Middle School West tract (approx. Sta. 8 + 30) to the west curb return at Enterprise Drive (Sta. 14+22.08). The break-down of probable cost is based upon the March 20. 1997 Preliminary Hans and Opinion of Probable Cost Estimate. With a contingency of ten (10) percent, the total estimated cost for each phase of the project is as follows: Phase I $1,409,328.25 Phasc II $ 380,6i~Zr~.) ' ~Z,sr ' ,, ~ ~,~z.o~,: I~%q.xS 10-17-1997 2:05PM FROM P. 3 Memorandum - Ken Griffin, P,E. 10/17/97 Wrangler Drive Reconstruction Project Should you have any questions or need additional information, please give me a call. 2 10-17-1997 2:0SPN FRON~,_ ~ P,~ TEAGUE NALL AND PERKINS, INC. ENGINEER'S OPINION OF PROBABLE COST Project: Wrangler Drive Paving, Drainage & Water Line Improvements Coppull, Texas October 17, 1997 I - Coppell Middle School West to Belt Line Road) Proj. No. CPL 96164 DESCRIPTION'bF ITEM' U'NIT '~I'OTAL UNIT CO~S'I' QUANTITY PRICE WATER IMPROVEMENT8 1 6" PVC Water Line LF. '~0 16.00 .... 320.00 2 12" PVG Water Line L.F. 790 32.00 _25,280.00 3 6" Gate Valve ane Box ~A. 2 400.00 800.00 4 D.t. Fittings Tons 2 2,800=,~0 5,600.00 5 ~ire N~er8nt EA. ., 2 1,000.00 2,000.00 "6! Conne~ to Exist. Water System ..... EA. 2 5~0.00 1,00Q00 7: Trench Safety.for Water Line L.F. , ..... ?90 1.00 790,00 8 Water Line Grade Adjustment EA. ~ 2,000.00 ........2,000.00 $ub~Otal Water Improvements .... ~,~90.00 STORM DRAINAGE IMPROVEMENTS 9 Remove Exi~in~ 12" RCP L.F. , 85 10.00 850.00 10 Remove ~xisting 15" RCP L.~, ~,9~ 10,00 1,000.00 11 Remove Existing 18" RCP LF. 975 12,00 11,7g0,00 12 Remove ~xisting 21" ~P L.F. 260 1~.9.~ 3,120.00 13 Remo~ Exi~in9 Drop Inlet ~A 2 500_00 1,000.00 14 18" RCP Inlet Lead LF. 200 35.00 ~ 7.g99.00 15 21" RCP Inlet Lead LF. 45 38.00 ~ 1,710.00 16 30" RCP Inlet Lead LF. 30 55.00 ( ~ .!,_,650.00 17 18" RCP (Class III) L.F. 160 3500 ~ 5,600.00 18 27" RGP ~Class HI) L.F. 335 ....~Z. 00 15,~45.00 19 30" RCP (Class 111) ... L.F 160 ~5.00 8,800.00 20 36".~0P {Class III) L.F, 65 70.00 4,550.00 21 4' x 3' Box Culved L.~. 485 170.00 82,450.00 22 5' x 3' Box Culve~ L.~. 1,245 195.00 242,775,00 23 6' x 3' Box Culved L.F. 250 220.00 55,000.00 24 2-6'x3' Dox Culve~ LF 40 400.00 16,000,00 25 10' Receded Curb Inlet EA. 4 2,000.00 8,000.00 26 12' Receded Curb Inlet EA. 5 ~,~00.00 11,000.00 27 4' Square $DMH EA. 1 2,500.00 2,500,00 28~5' Sq,uare SDMN EA- 1 2,80000 2,800,00 29;Water Line Grade Adjustment EA. 7 4,000.00 28.000.00 ~01Rei0?t~.Fire. Hydrant ~. ,.. 3 1,500.00 4,500.00 Page 1 of 2 10-17-1997 2: 06PI'4 FROM P, 5 TEACUE NALL AND PERKINS, INC. ENGINEER'S OPINION OF PROBABLE COST Project: Wrangler Drive Paving, Drainage & Water Line Improvements City of Coppell, Texas October 17, 1997 (Phase t - Coppell Middle School West to Belt Line Road) Proj. No. CPL 96164 ITEM' DESCRIPTION OF ITEM .... UNIT TOTAL' UI~IT l COST NO. QUANTITY PRICEi ... 31 ErgOion Control L.S. "'1 3,000.00 3,'000,00 .32 TrenCh Safety ,for Drainage L.F. 3,015 5.00 ,,, 15,075.00 Subto. t. al Storm Drainage Improv.,ements 533,825.00 PAVING IMPROVEMENTS 33 Unclassified Street Excavation C,Y, 11,650 6.50 75,725,00 34 Remove Exist HMAC Pavement S.Y. 10,450 2,00 20,900,00 35 Remove Exist Concrete Pavement S,Y, 1 205 3.00 3,615,00 36 8" Lime Stabilized Subgrade ..... S.Y. 18,795 3.00 56,385.00 37 Lime For Stabilization TONS 340 100_00 34,000,00 38 7" Reinf. Concrete Pavement S.Y, 17,865 24.00 428,760.00 39 6" Integ_ral Curb ,., L.F. 6,515 1,50 , ,9,772,5.0. 40 4" HMAC Transition S.Y. 465 15.00 6,975.00 41 6" HMAC Transition S.Y. 255 16.00 4,590.00 42 6" Flexible Base S,Y. 465 10.00 4,650.00 43 Wheelch,~,!r Ramp EA- 6 i 350.00 .... 2,100,00 44 4" Concrete Sidewalk S.F. 1,150 4.00 ........ _4_,_60__0.0Q_ 45 Adjus. t .ManhOle To Grade .....,,EA. 5 300.00 1,500,00 ~-. 46!Adjust Valve Box TO Grade EA, 11 25,0:00 2,750,00 47 Centerline Pavement M,a, rkers EA 640 6,00 3,840,00 48, Edge Pavement Markers ... EA. 320 5.00 1,600.00 49 Hydro-mulc.h Seeding S,Y. 7,200 2.00 14,400.00 ,,, 50 Conc. Driveways and Drivew,,,ay TransitiOn S.Y. ' "F, 6~5 22,00 23,430,00 51 Relocate and Reconstruct Earth Berm EA. 2 5,000.00 10,000.00 Subtotal Paving Impro~/ements ...... 709,592.50 /5"'RF_PED BY: SUBTOTAL ........ $1 ,_281,207.50 RE TOTAL $1 ..... ,,,~ ......... ., . ~ ,,. ,, fil®:cc>l~e'i e4\Ph- '1 cQ~;t wb2 ~Ge 2 o~ 2 10-17-1997 2:O6PN FROM P. 6 TEAGUE NALL AND PERKINS, INC. ENGINEER'S OPINION OF PROBABLE COST Project: Wrangler Drive Paving, Drainage & Water Line Improvements Coppell, Texas October 17, 1997 II - Freeport Parkway to Enterprise Drive) Proj. No. CPL 96164 DESCRIPYION OF ITEM UNIT 'F0'TAE UNIT COST QUANTITY PRICE STORM DRAINAGE IMPROVEMENTS 1 Remove Existing Drop Inlet EA. ! 500.00 /~roO 500,00 2 21" RCP inlet Lead L.F. c}~p 105 38.00 S~ 6--~ 3,990.00 3 30" RCP Inl,e,t Lead L.F, /l<~ 100 55.00 S~-G'~-~ 5,590,00' ~Z~4 45" RCP Inlet Lead LF_ /¢- 70 85.00 ~ b ' 5,950.00 5 38" rCP (Class !!!) L.F. ~ 3 115 70,00 'TcPq--¢ 8,050,00 6 48" RGP (Class III,) LF. ;L~5 295 100.00 }(2~ ~ 29,500.00 7 54" RCP (Class 111),, L,F ~ro ~ 410 t 112,00 1 33 ~ 45,920_00 8 60" RCP (Class III) , .. L.F. I~' 20 , 125.00 1'78~--~ 2,500.00 9 10' reces.s_e..d Curb Inlet EA, I 2 2,000.00 I GoO ' 4,000.00 10 12' Recessed Curb Inlet EA. } 1 2,200.00 2 oU0 ' 2,200.00 11 14' Recessed Curb Inlet EA. v" 3 2,400.00 9- I co ' 7,200.00 12 6' x 6' Drop Inlet EA. I 4,800.00 O 4,800.00 .13 4' Square SDMH EA. I 2,500.00 ) c%00 ' 2,500.00 14 Water Line Grade Adj.ustment EA. 1 4,000.00 0 .... 4,,000.00 t 5 Erosion Control L.S, 1 2,000,00 O 2,000.00 16 Trench Safety for Drainage.., L.F. ICPG'"I' 1,130 5.00 I, t0 5,650.00 ,, ¢!b5 _;%0" Cep 4 Subtotal Storm Dr..a. ina~e Improvements ,. 1.34,260.00 PAVING IMPROVEMENTS 17 Unc. l.a..s. sified Street Excavation C.Y. 3,350 6.50 4 5..D. 21,775.00 18 Remove Exist HMAC Pavement 8.Y. 250 2.00 O 500.00 19 Remove Exist Concrete Pavement S.Y. 20 3.00 O 60.00 20 8" Lime Stabilized Subgrade S.Y. 5,520 3.00 \ ~- 16,560.00 21 Lime For Stabilization TONS ~5 100 100.00 leo 10,000.00 ...22 7" Reinf. Concrete Pavement S.Y. 5,290 24.00 ..~. 7'. 126,960,00 23 6" Integral Curb L.F. 2,125 1.50 O 3,187.50 24 Adjust Valve Box To Grade EA. 4 250.00 I oc) ~ 1,000,00 25 Centerline Pavement Markers> EA, 200 6.00 ~ 1,200.00 ,2,.6EdcJe Pavement Markers EA. 100 5.00 ..... 500,00 27 Brick Pavers %Y S:r, ~' I~,% LP?¢0~ 9.00 '7o 21,600.00 28 Hydro-mulch seedin_g S.Y. 2,300 2.00 4,600.00 29 slreet Light Conduit (T,U. Electric) L.F, 780 4.00 3,120.00 Page 1 of 2 10-17-1997 2: 07pN FRON P, 7 TF=AGUI= NALL AND PERKINS, INC. ENGINEER'S OPINION QF PROBABLE COST Project: Wrangler Drive Paving, Drainage & Water Line Improvements City of Coppell, Texas October 17, 1997 {Phase II - Freeport Parkway to Enterprise Drive) Proj. No. GPL 96164 ITEM DESCRIPTION OF ITEM UNIT' TOTAL .... UNIT hOST NO. QUANTITY PRICE 30 Signal Con,d,,u.,it.,(,Future At Freeport PkwX) L.F. l 'Z,O 180 ! 4.00 IO ' 720,00 Subtotal Paving Improvements 211 ,TBZ.S8 '~'~o~. ' ..... ///~7 'SUS~..OTAL"....is4s,0~3.S0 TOTAL " fEle:Cp198184~.Ph,2c~t wb2 Page 2 of 2