Loading...
Samaritans Purse-CS190207r w x rt� r r e F avooP ELL IS CONSTRUCTION DEVELOPMENT PERMiT APPLICATION Name of Applicant F.A. Peinado, LLC Date Submitted 02/07/2019 Address of Applicant 1701 Legacy Dr., Suite 1000, Frisco, TX 75034 Phone Number 1214.200.9140 Fax Number Location of Construction (address, if available): =!!= IV Subdivision Section # Block # Lot # 1� OR Survey/Abstract # 1716 Acreage t 0.683 Location description (attach vicinity map): See attached map 1. Type of proposed construction or development: C' Residential C" Alteration of a natural waterway drainage course C: Non=Residential C Other (describe & attach drawing or sketch) C' Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: Fxl Paving ❑ Median or Landscape j Sidewalk Q Drive Approach Excavation ❑ Fire Lane ❑ Bridge Water Main X❑ R.C.P. ❑x Sanitary Sewer Main ❑ Flume ❑ Inlet ❑ Box Culvert ❑ Rip Rap ❑ Fill Area ❑ Drainage Channel Excavation ❑X Slope Protection/Retaining Wall ❑ Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisors) for every contractor working under this general permit. 3.AU construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION S.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ Date Paid: NOTE: A separate excavation permit is required anytime pavement is cut or when of is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department (� 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-3043679 ➢Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As -Built Drawings be turned in at the end of thisproject. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. ➢A pre -construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of tlris form: Evan Burden - Peinado Construction of Applicant Signature of Inspector 2142009140 Contact Number Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C' Yes ®No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? (Yes 0 No Are other federal, state, or local permits required? ( Yes 4 No PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED City Approval Ll9 �u 19 1 Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Y H ii C i `► T r :OPPELL INSPECTION FEE CALCULATION SHEET Project Name 5 ATz-2-ae.�s RA4zs E Date OZ/o? 1 2419' Asper the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to ba permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verily the inspection fee due, please provide a copy of the development contracts) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of $ 2 � � � $ p Z both colored fields) j ,U Submit by E-mail Print Form PUBLIC IMPROVEMENTS CONTRACT AMOUNT ° PRIVATE IMPROVEMENTS CONTRACT AMOUNT ° Paving ju, sOb.00 gQq.00 Sfoa�� 000.60 111,20o.00 Water 4)1y,5662 06 �1,582.yv 3931 065.00 3 ►i $61.3a Sanitary Sewer qj ID0. 00 18 8 , 06 t el q*1 4(050 a � 55 9,30 Storm Sewer 12, (025y0� �j1bS,04 $41,da 1, �91o4 Alleys U' N 1 Rr W 14 N 1 Sidewalks 41y110400 9 o�ODD zt39,200600 � �gq.I)0 Other Total �,lvfi5.�0 6j6C N'o �� ird�1-Qb Grand Total (total of $ 2 � � � $ p Z both colored fields) j ,U Submit by E-mail Print Form