Woodlands-CS 950418 FINLEY DEVELOPMENT
LAND DEVELOPMENT CONSULTANTS
16801 Addizon Road, Suite 250
Addiaon, Texas 75248
(214) 931-1312
Fax (214) 931-8749
April 18, 1995
Mr. Ken Griffin, City Engineer
CITY OF COPPELL
P.O. Box 478
Coppell, Texas 75019
Dear Mr. Griffin:
Finley Development, on behalf of W.O.C. Investments, Inc., owner of the above referenced
development, respectfully request the City of CoppeH permit the grading of this project to begin
prior to final plan approval.
It is understood the owner will be responsible for any damages which may occur as a result of
this early start. The owner will be responsible for complying with the EPA requirements.
The required preventive pollution plan erosion control measures will be constructed prior to
commencement of grading operations.
HAP Engineering, project engineer, will deliver the requisite number of plans for the grading
operations. Rodman Excavation, and I will meet on site with the inspector, at a time to be
determined, for a pre-construction conference.
Robert C. Finley, President
cc: HAP Engineering
W.O.C. Investments, Inc.