YMCA-CS 980219 CITY OF COPPELL
PLANNING DEPARTMENT
STAFF RI.PORT
COPPELL FAMILY Y.M.C.A. LOT 1, BLOCK 1
FINAL PI,AT and SITE PLAN
P & Z HEARING DATE: February 19, 1998
C.C. HEARING DATE: March 10, 1998
LOCATION: Southwest corner of Town Center Boulevard and Town Center
Drive.
SIZE OF AREA: 5.366 acres; 34,000 s.f. two-story building with gymnasium and
indoor swimming pool.
CURRENT ZONING: TC (Town Center)
REQUEST: Final Plat and Site Plan approval.
APPLICANT: Developer: Planner/Engineer:
Coppell Y.M.C.A Dowdey Anderson & Assoc, Inc.
1203 Crestside//300 5225 Village Creek Dr, Ste 200
Coppell TX 75019 Plano TX 75093
972-393-5947 972-931-0694
Fax 972-393-5121 Fax 972-931-9538
HISTORY: Preliminary plat approved by Planning and Zoning Commission
November 20, 1997 and by City Council December 9, 1997. The
Planning and Zoning Commission did not approve the Site Plan
submitted with the Preliminary Plat.
TRANSPORTATION: Town Center Boulevard is a 28'-wide pavement within a 28'wide
right-of-way dedicated by separate instrument. Town Center Drive
is a 66'-wide divided pavement within a 66'-wide right-of-way
dedicated by separate instrument. The Final Plat will provide a
vehicle for City acceptance of the right-of-way dedications.
Item # 6
SURROUNDING LAND USE & ZONING:
North- Municipal open space; TC
South- Vacant; TC
East - Chaucer Estates; PD-SF-7
West - Comerica Bank, Wendy's, vacant; TC
COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for
public/institutional uses.
DISCUSSION: The Commission did not approve the site plan when previously submitted
because it did not include building elevations. The current submission
includes all four building elevations. To date, however, the planning staff
has not received a letter of approval from the Town Center Architectural
Review Board.
RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION:
Staff recommends approval subject to the applicant providing a
letter of approval from the Town Center Architectural Review
Board.
ALTERNATIVES:
As to the Final Plat:
1) Recommend approval of the request
2) Recommend disapproval of the request
As to the Site Plan:
1) Recommend approval of the request
2) Recommend disapproval of the request
3) Recommend modification of the request
4) Take under advisement for reconsideration at a later date.
ATTACHMENTS: 1) Final plat
2) Site plan
3) Building elevations
4) Color reductions of building elevations
5) Landscape plan
Item # 6