Loading...
Frontier-PT200103A copy of the approved permit must be on the job site at all times. CC: Applicant Public Works Permit File Orig. to Project File T K [ - C I'r 7 - O F COPPELL Page I of 4 ,Rev. 0512022 RIGHT -DF -WAY USE PERMIT APPLICATION Permit valid.for 90 calendar days from date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: ° 1 /02/2020 Applicant's Job # / Work Order # PERMIT FEE: $100.00 (No charge to Utility Companies with approved FranchiseIROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes (*- No C ❑ Plans provided and approved (Erosion ControllSafety fences must be installed prior to beginning work) Project Name/Location or address Sandy Lake Road General Contractor Green Planet 21 Utility Services Contact# 916-529-0132 E-mail address to return permit eperkins@greenpl anet21. com Representative: Franchise Telephone #: I -7 3 6 Q 7 Company: E-mail address: Tk, --`��a--4��i--i tof L F ,[L- � ea An -- _ (for contact if needed/if e-mail of approvedpe7"iiiit is desiredlpermit cannot be e-mailed unless complete) Utility Company Represented: C' Oncor Electric Delivery (' Atmos Energy C' Verizon C' SBC/ AT&T C Time Warner Cable (' CoSery Electric/Gas G Other Frontier Communications General Description of Work (in accordance with ord. No.2ooi-s44j: PLEASE ATTACH PLAN OF PROPOSED WORK Manhole work along Sandy Lake Road between Freeport Pkwy and PGBT rypical Bight Lane Closures Estimated Start Date 01-/06/2020 Estimated Completion Date` 03/06/2020 * Completion )requires submittal of Completion Verification Notice (see page 4) )i -Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason.No digging C' Yes C* No ➢Is removal of existing streets, alleys, or sidewalks necessary? C' Yes is No if YES, project must have City inspection prior to concrete replacement Richt -off War Use Permit Analication Paee 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement_ of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) can 972-462-5155. ➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-3043512 Street Department a 972-462-5150 Engineering Department (0 972-304-3679 ➢Attach barricade plan 1 trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. ➢Attach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 !lours prior to beginning work. For City utility locates, call 572-462-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@bMWellix gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you ant the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) _ Signature of Utility Company Representative Date Eric Perkins Signature of Contractor Representative Signature of City Representative Comments 01/02/2020 Date a--�; C) ?,Q Date ➢NOTE: No '# # Cio Ins ector at 972-304-3679 Pdor to beg inni rk and prior to backfdi for concrete, trench, ditch and opera pit inspections. Backfill mast meet ad construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted_ T H = • c I T r . o r Page 3 of 4 COPPELL r -k A 1 r UTILITY REWCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: LA copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 5 Sod is to be replaced when necessary. .Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. S.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION .connel11 x�aylutili -opgr iatts-�i.)4�si01} 9721462-5155 CITY OF COPPELL ENGINEERING DEPT. 9721304-3679 HOMEOWNER ASSOCIATIONS 9721304-3678 (Planning Department) TIME WARNER CABLE 2141320-5455 (Mike Rasmussen) AT&T LOCAL NETWORK 2141215-3031 (Rich Millenman) COSERV Gas & Electric 9401 321-7800 x 7624 (Greg Ward) EXPLORER PIPELINE 9181493-5100 (Patrick Nwakoby) ONCOR Electric Delivery 9721 323-8917 (Larry Redick) VERIZON COMNIUNICATIONS 9721318-5277 FEDERAL EMERGENCY MGMT. ADMIN. 9401 898-5138 TERAS COMM. on ENVIRONMENTAL QUALITY 8171588-5800 DENTON CO. LEVEE DISTRICT 2141352-5118 (Richard Hightower) Atmos Energy 9721360-4428 (Gary Dickinson) 1800 DIG TESS for line locates (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16."Clean up" requires returning work area to pre -project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T M 9 C 1 T Y p >� COFFELL UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public Works Division at 972462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location 1 Applicant's Work Order # (if applicable) Sub -contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL ❖Inspected by of Utilities Maintenance Division on and found to be acceptable 1 not acceptable because Follow-up needed? C' Yes (- No Follow-up scheduled for ❖Inspected by of Streets Maintenance Division on and found to be acceptable 1 not acceptable because Follow-up needed? r Yes (- No Follow-up scheduled far A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E-mail Print FOTM aaoa Lateral Buffer (optional) I r Space (optional) L C ITILIT WORK