Spectrum-PT200131A copy of the approved permit must be on the job site at all times.
CC: Applicant T H c c T Y 0 F Page 1 of 4
Public Works COFFELL
Permit File Rev. 06/2012
Orig. to Project File f ,
RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 1/29/2020 Applicant's Job # / Work Order # PID - 1822346
PERMIT FEE: $100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C No C
❑ Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address Freeport Pkwy and Bethel
General Contractor Gardner Telecommunications Contact# 214-690-5177
E-mail address to return permit cmorris@gardnerl00 . com
Representative: Richie Bonner
Franchise Telephone #: 817-205-8177
Company:
E-mail address: richie . bonner@charter. com
(for contact if needed/if e-mailof approved permit is desired/permit cannot be e-mailed unless complete)
Utility Company Represented:
C1 Oncor Electric Delivery C Atmos Energy C' Verizon C SBC/ AT&T
Time Warner Cable C CoSery Electric/Gas C' Other
General Description of Work (in accordance with Ord. No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK
Bore 2-2" conduits for 326'. Pull new fiber thru the pipe then to existing CAN boxes.
Estimated Start Date 2/ 5/ 2 0 2 0 Estimated Completion Date* 4/21/2020
* Completion requires submittal of Completion Verification Notice (see page 4)
➢Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: C Yes C No
Is removal of existing streets, alleys, or sidewalks necessary? C Yes C: No
if YES, project must have City inspection prior to concrete replacement
Right-of-Wav Use Permit Ammlication Nee 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
➢Attach barricade plan / trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9:00 a.m. until3:30 p.m. ONLY unless otherwise approved by City
Engineer.
➢Attach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Richie Bonner 1/29/2020
Signature of Utility Company Representative Date
Colby Morris
Signature of Contractor Representative
1/29/2020
Date
31 January 2020
Signature of City Representative Date
Comments
The contractor shall submit the Completion Verification Notice
form on page 4 upon completion of the work.
➢NOTE: Notify Cia Inspector at 972-304-3679 prior to beginning work and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
FR FREEPORT PKWY RD
WIDENING
FREEPORT PKWY AT BETHEL
COPPELL, TX
VICINITY MAP
GENERAL PROJECT NOTES
1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT—OF—WAY SHALL BE DONE IN ACCORDANCE WITH THE
ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED.
2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT.
THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
DRAWINGS OR NOT.
3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK.
CALL BEFORE YOU DIG
811
IT'S THE LAW
4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND
PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS
SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
AND BARRICADED AT NIGHT.
6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING
EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
ASPECTS OF WORK RELATED TO EXCAVATION.
7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION — 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE.
8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED.
10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 957 PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
3
J J
a
W
a
o
a
W
rn
W
W BETHEL RD
ftOJECT
IOCAnON
z
GENERAL PROJECT NOTES
1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT—OF—WAY SHALL BE DONE IN ACCORDANCE WITH THE
ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED.
2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT.
THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
DRAWINGS OR NOT.
3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK.
CALL BEFORE YOU DIG
811
IT'S THE LAW
4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND
PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS
SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
AND BARRICADED AT NIGHT.
6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING
EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
ASPECTS OF WORK RELATED TO EXCAVATION.
7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION — 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE.
8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED.
10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 957 PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
TYPICAL UTILITY CROSSING
OF 4c 400ISIEDGbNDU
VA
24- MIN.
SEPARATION
T
4
IUTY 1 7
NOTED 'INP L N
TYPICAL PAVEMENT BORE DETAIL
CONDUIT A!
NOTED IN I
TRENCH DETAIL
NOT TO SCALE
GROUND LINE . .
--77-1
WARNING TAPE
r
CONCRETE PAF,;,iN(,
STA. 0+00 UNE A
LEGEND
QUANTITY DESCRIPTION QUANTITY
PROPOSED CONDUIT
ExisrrNr, FLUSH MOUNT
36" 36
BORE & PLACE CONDUIT
160, PLACE PEDESTAL
BORE UNDER CONCRETE
PLACE FLUSH DROP BUCKET
LEASE DUCT
x
EXISTING SPECTRUM CONDUIT
PLACE CONDUIT(S)
EXISTING CUSTOMER CONDUIT
PP XX'
PP
0
0 OVERHEAD: NEW BUILD
PP XX'
Pp
0
0 OVERHEAD: OVERLASH
TYPICAL UTILITY CROSSING
OF 4c 400ISIEDGbNDU
VA
24- MIN.
SEPARATION
T
4
IUTY 1 7
NOTED 'INP L N
TYPICAL PAVEMENT BORE DETAIL
CONDUIT A!
NOTED IN I
TRENCH DETAIL
NOT TO SCALE
GROUND LINE . .
--77-1
WARNING TAPE
r
CONCRETE PAF,;,iN(,
STA. 0+00 UNE A
DESCRIPTION
QUANTITY DESCRIPTION QUANTITY
TRENCH & PLACE CONDUIT
ExisrrNr, FLUSH MOUNT
36" 36
BORE & PLACE CONDUIT
160, PLACE PEDESTAL
CUSHION SAND
PLACE FLUSH DROP BUCKET
VAULT 24" x
x
R & R CONCRETE SIDEWALK (SF)
PLACE CONDUIT(S)
a) I
TO 98% PROCTOR
AERIAL: OVERLASH
AS SPECIFIED
0 0, GTE ML
mw
CS
UG
likR CONCRETE Ti
NAC
PVMT. - 40 SF
124—
1 2SS
W BETHEL RD
(VARIABLE'
R.O.W.)
4- 5X10 BOX CULVERT
--- -- UTILITY MT -�
--- --------
UTILITY Lo
STA. 3+26 LINE 'A' PROP. R.O.W.
• EXISITNG FLUSH MOUNT
VAULT 24' x 36" x 36"
STA. 1+44
PLACE FLUSH MOUNT
VAULT 24" x 36' x 36"
W/20K RATED LID
16-W
Z>16,w
D -10 -SS
_v-
---A-PlROP. PAAoG
30
ii
PREPARED BY:
DF w
0
DFWT CONTACT:
DAVID HATTON 972.67011 13
ESTIMATED SHEET TOTALS
DESCRIPTION
QUANTITY DESCRIPTION QUANTITY
TRENCH & PLACE CONDUIT
BACKFILL TRENCH
BORE & PLACE CONDUIT
160, PLACE PEDESTAL
CUSHION SAND
PLACE FLUSH DROP BUCKET
WITH DEBRIS FREE
MATERIAL TAMPED
PLACE POWER SUPPLY
R & R CONCRETE SIDEWALK (SF)
PLACE CONDUIT(S)
a) I
TO 98% PROCTOR
AERIAL: OVERLASH
AS SPECIFIED
PREPARED BY:
DF w
0
DFWT CONTACT:
DAVID HATTON 972.67011 13
ESTIMATED SHEET TOTALS
DESCRIPTION
QUANTITY DESCRIPTION QUANTITY
TRENCH & PLACE CONDUIT
204' PLACE FLUSH MOUNT VAULT
BORE & PLACE CONDUIT
160, PLACE PEDESTAL
BORE & PLACE STEEL CASING
PLACE FLUSH DROP BUCKET
PULL THROUGH EXISTING CONDUIT
PLACE POWER SUPPLY
R & R CONCRETE SIDEWALK (SF)
PLACE WALL BOX & RISER
R & R CONCRETE PAVEMENT (SF)
PLACE U -GUARD RISER
AERIAL: OVERLASH
I JOVERHEAD: NEW BUILD
NORTH PROJECT: FR FREEPORT PKWY RD
WIDENING
ADDRESS: FREEPORT PKWY AT BETHEL
CITY, STATE: COPPELL, TX
SHEET HORIZONTAL SCALE SCALE J013 NUMBER:
OF 1" = 40' I"= 10' 1822346
DATE:
01-03-2020
_ .. �4i r _ �'� gar f i 1 I ; �•: /Y �- � ,�
• x ,
kir
114F11111OW 1417 11 .t -
New UG�'
Pull thru e i dig
Fi ..FBF° �iF,R���rbl lF�xi'r _ ,� i _ ti;�. ---- - 4 � � �^ ! � ` •_ �,
at
Vwoli rn,
L rt Sae — 4.
f ilt
J77777cm
� , � �E �� 1E_�� #�'�t_it.•=t�1+El'�'- fPf�=3 � �! tK . �'i I�t �[ s-- � Ki` '� _ �' •
f
ILE.'r' r/�6�1 LL! o v �LAvLI '
o3
! � i" .x,•11
- ; - - _ � + cr. - t a.,4 V ♦�+- '' � .�� � � i SF'rT.�`� � � '�4 moi, _ _ � k' i � ( „�•�'y ► H � • 1��� c
I� ... • �� I � . � .Li,t• ti r ,�f t k � ,�..,ye �y ��'�, ,�. i' I� �F .rpH;^"'"�� - � t � � ,�.
PE&4�' �r(a' Ali �!• tw ! �y
SWANr r
f �g
R� I � l' Pew , ~ a -i • r z � �r- ",�„! -Q' r+ a �....r. i '•� � ' i � Ji "• _
J
1» ! .I �. �.. � _ r' !- e+ k A � ; # v t��r t'r'•' ,.�.��: -�. "\ra�.��4 +,w.r''� Ft a _.a
r
Ind+. f { j� I - _. ,'� _ ' •
F—�dm