Loading...
Lost Creek Addition- PT180420Page 1 of 4 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant Date SubmittedMARK HAAS COMPANY 5/16/2016 Address of Applicant 141 Dickens, Coppell, TX 75019 Phone Number Fax Number2142132302 2142132302 Location of Construction 568 COPPELL RD, Coppell, TX 75019 Subdivision AcreageLost Creek Addition Section Block Lot1 26r Location Description Lost Creek Addition, Lot 26 Block 1, Coppell Lofts, 568 S Coppell Rd 1. Type of proposed construction or development: Residential 2. Description of Construction Permit requested: Storm/Grading/Erosion/Utilities/Paving: Paving, Sidewalk, Drive Approach, Fill Area, Parking Lot, Excavation, Water Main, Sanitary Sewer Main, R.C.P. Provide an attachment containing the name and 24-hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $1,779.56 Date Paid: 4/4/2018 NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. > Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Dept. @ 972-304-3679 > Attach barricade plan / trench safety plan of a lane or street closure. (Required) > It is a requirement of this permit that As-Built Drawings be turned in at the end of this project. As-Builts consist of a .pdf and CD with Autocad .dwg files. Page 2 of 4 NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. > A pre-construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: Mark Haas Signature of Applicant Contact Number 2142132302 Signature of Inspector Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? If YES, a Floodplan Development Permit is required before any construction can begin.Is additional information requred? No No City Approval Date George Marshall 4/20/2018 Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is Page 3 of 4 INSPECTION FEE CALCULATION SHEET Project Name DateLost Creek Addition, Block 1, Lot 26 Coppell Lofts live / work 5/16/2016 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre-construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Paving Grading Water Sanitary Sewer Storm Sewer Alleys Sidewalks Other PUBLIC IMPROVEMENTS CONTRACT AMOUNT $10,946.00 $0.00 $6,900.00 $7,360.00 $1,100.00 $0.00 $6,867.00 $0.00 X 4% = $437.84 $0.00 $276.00 $294.40 $44.00 $0.00 $274.68 $0.00 $7,693.00 $0.00 $3,600.00 $3,700.00 $7,300.00 $0.00 $339.00 $0.00 X 2% = $153.86 $0.00 $72.00 $74.00 $146.00 $0.00 $6.78 $0.00 Total $33,173.00 $1,326.92 $22,632.00 $452.64 PRIVATE IMPROVEMENTS CONTRACT AMOUNT Grand Total (total of both colored fields)$1,779.56 Page 4 of 4 Signature of Applicant Signature of Inspector Date Date