PA9702-LR000410 ONCRETE COMPRESsriVE STRENGTH TEST
a division of ']r~r'~t~
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
)ate of Service: 03/31/2000 Report No.: 0008668 Report Date
04/10/2000
Client No.: COPPELL Project No.: 94991118
Client: City of Coppe11 Project: Coppell Aquatic/Recreation Ctr
Attn: Brad Reid 300 Block of Parkway Blvd
732 DeForest
Coppelt TX 75019 Coppell, Texas/Prj. #96051
Services: Obtain samp~es of fresh c~ncrete at the p1acement1~cati~ns~ perf~rm requir~d ~e~d test and cast
compressire strength samples.
PROJECT DATA
CONTRACTOn: Hisaw & Assoc. M~X 1.D.: N/A
CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 03/31/2000 BATCH TIME: 7:02am
pLANT: N/A TIME SAMPLED: 7:45am BY: Conan Cantwell
SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Clear
STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 53 F CONCRETE: 62 P
SLtr~P: 5.0" Max TnUCKNO: 222 TICK~TNO: 83466
AIR: N/A AreCONTENT(%): 3.0 UNITWEtGHT(pCf): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
North entrance walkway
ASTM C- 172
ASTM C-39
SAMPLE LOCATION: 15' North of center line main doors
REPORT OF TESTS ACCUMULATIVE YARDS: l0
CYLINDER MEASURED MAXIMUM COMERESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE
1 1 5.50 04/07/2000 7 90610 3200
1 2 5.50 04/07/2000 7 92160 3260
Average 3230
I 3 5.50 04/28/2000 28
1 4 5.50 04/28/2000 28
Technician: Conan Cantwell Started: 7:00am Finished: 8:30am
Report Distribution: E g~ Inc.
(1) City of coppell (1) City of Coppell - Engineering
(I) BrinkIcy Sargent Architects (1) City ofCoppell - Bldg. lnsp. Paul D. Smith, P.E.
(1) Turner Engineers (1) City of Coppell - Leisure Serv Dept Senior Project Engineer
(1) Hisaw & Associates
This report is exclusively for the use of die client indicated above and shall not be reproduced except in full without die wriRen approval of HBC Engineering, Inc.
qLL Page I of I