Loading...
ST9601-CS 9702282-28-1997 12: 4. E, PM FROM P, 2 TEAGUE NALL AND PERKINS, INC. CONSULTING ENGINE,gRS 2001 W Nng Blvd, Inting. T~ 75061 972/254-1765 fax 972/251-434g MEMORANDUM DATE: February 28, 1997 Via fax to: 972/304-3673 (2 pages) TO: Ken Griffin, P.E. - City Engineer City of Coppell FROM: Michael Jones RE: Wrangler Drive Reconstruction Project (Project # ST 96-01) City of CoppeI! We are currently in the process of completing an in-house review of the prel irninary/pre-fmal plans for the Wrangler Drive project. The plans will be ready for submittal to you for your review by the end of next week. Included with this next submittal will be the right-of-way documents for the proposed extension of Wrangler Drive to Freeport Parkway and an updated opinion of probable cost. Although there are a few issues which remain urtresolved from the schematic plan submittal and review, we have attempted to address most of these items on the preliminary/pre-fmal plans. Some, however, may require additional consideration and/or direction before we complete the final plans. These um'esolved issues generally relate to the following: 1. Uncertainty as to whether or not a segment of the sanitary sewer, immediately to the east of Enterprise Drive, has been constructed; 2. Driveway locations, access and traffic channelization for left-turn movements adjacent to the CoppeI1 Middle gchool property; 3. Collection of runoff from undeveloped, offsite drainage areas; 4. Recommendations regarding subgrade stabilization; 5. The intersection Iayout at the southwest comer of Wrangler Drive and Crestside Drive; and 6. Left-turn channelization at the intersection of Freeport Parkway and Belt Line Road. 2-28-1997 12:~6PM FROb~,_ P. 3 Memorandum - City of Coppell Wrangler Drive Project February, 28, 1997 I will look forward to meeting with you late next week, if possible, or at your earliest convenience sometime during the following week to receive your direction for fmalizing the plans. I will contact you in the next few days to schedule a specific date and time for presenting the preliminary/pre-finaI plus. In the meantime, should you have any questions, please do not hesitate to give me a call. 2