Loading...
Coppell Cross L2-CS 990322Date: FroI11: To; Proje~-t: 23:18 2i46540122 DUNAWAY ASSOC~ES PAGE 82 3/22t99 Chris Lam Micl~ael Martin, P.E.-Cily of Coppell Coppe~l Crosmng 98566 Du away ssoc at s, Inc, Engineers ' Planrmm · Landscape ArChitects * Surveyors Dallas, TX · Fo~t Wortfl · Roanoke, TX MEMORANDUM SUBJECT: Storm Drainage System The purpose of this memo is to provide the drainage information per your requested; based on our conversation on March 18, 1999, Our calculation for the eXisting (2)~36" RCP pipes show that those pipes are under sized and does not have the capacity to handle, the amount of discharge from the Hollows {~ Northlake Woodlands development. The calculations indicate that we would have a surcharge above the top of our inlets. Our plans reflect part of the surcharge applied to the existing storm drain system. As we have discussed before, the detention area in the Dallas, Ught and Power Easement would provide relief of the discharge into the (2)-36" RCP pipes and it is our understanding' that Tipton Engineering inc. will calculate the detention system. If you have. any questions or comments regarding the above memo, please contact, our office at (214) 654-0123. Thanks ., · Chris Lam CC: File Page 1 ' ' ' ....... '" " '(21 0123 x FA~'(214).654-0122 2351 tV.. Northwest Hwy., Suite 3280 ~ De#as, Texas 75220 ~ 1501 Merrfmec, Suite 100 ~ Fo~t Worth, Texas 76107 ~ (817).335.ff2f x FAX(BlT),.335-7437 215N. Oak Stni~, Suite B ). Roalx~e, TeXas 7~262 x (817)-491-0~2g ~, FAX (Sf7)..491-0640