ST9601-CS 961015lg-IS-lggG 2:g3PW FRON P. 2 TEA GUE NALL AND PERKINS, INC. CONSULTING ENGINEERS 2001 W. [r~ng BIrd, ir'~ing, 'l'~xi.~ 75061 972f254-1765 fax972t2:~l-4~48 MEMORANDUM DATE: October 11, 1996 Via fax to: 972/304-3673 (2 pages) TO: Ken Griffin, P.E. - City Engineer Mike Martin, E.I.T. - Graduate Engineer City of Coppel i Teri Jones RE: Wrangler Drive Reconstruction Project (Project # ST 96-01 ) City of Coppell Project Muting at City of Coppell (10/02/96) Thank you for taking the time last week to meet with us regarding the subject project. Your input on the various questions which were presented was valuable and very much appreciated. The following represents our understanding of how each issue should be addressed: Rainfall Intensities. Storm water discharges for the Wrangler Drive project are to be calculated using rainfall intensities based upon HYDRO-35, rather than TP-40. 2. Drainage Design for Lot I & 2, Blk. 5, Park West Commerce Center. The proposed drainage design for the 29.39-acre parcel of land on the west side of Belt Line Road, b~vveen Airline Drive and Wrangler Drive, as depicted on the Master Utility Layout plan prepared by HalffAssociates, shows all the runoff disoharging to the existing storm drainage system in Wrangler Drive. It is our understanding that the City will coordinate with HalffAssociates to make certain that runoff from this property is collected into the various drainage systems, in accordance with the previous drainage area delineations and/or drainage calculations developed as part of the Belt Line Road storm drainage design. 3, Drainage Design/Grading Plans for the New Lincoln Business Center Development. Plans for this tract, located at the southwest comer of the Wrangler Drive/Belt Line Road intersection, are being prepared by BrockeRe-Davis-Drake, Inc., Consulting Engineers. These plans will be provided to TNP for our review and use in preparing the design for the Wrangler Road drainage improvements. The drainage design for the storm drain at Wrangler 10-1B-1996 2:03PM FROM P. 3 Memorandum - City of Coppell October 11, 1996 Page Two Drive and Belt Line Road was prepared assuming that approximately one-half of this tract would &ain north to Wrangler Drive, while the southern portion of the tract was anticipated to drain to the channel, to the south of the property. If it is determined that less storm water is directed towards Wrangler Drive from this area than originally anticipated in the plans for the Belt Line Road drainage improvements, the City should coordina~:e with the cleveloper's engineer to delermine the capaciW of the system to the south into which the additional storm water is being discharged. 4. ,/Airline Drive Storm Drainage System. The City will provide TNP with plans for the existing Airline Drive storm drainage system. TNP will use the plans of the existing improvements to determine whether or not the runoff from the 8.3 acres of land, norda of Wrangler Drive and east of Enterprise Drive, was included in the design capacity for the Airline Drive storm drainage system. If it was not included in the Airline Drive design, TNP will evaluate the possibility of including capacity to accommodate runoff from this area in the new storm sewer extension in Wrangler Drive, and/or explore other options, as necessary. Freeport Parkway Storm Drainage System. TNP will analyze the capacity of the existing Freeport Parkway storm drain system, under the conditions of a 100-year storm event, to determine the allowable discharge from the Wrangler Drive drainage area into that system. Allowable Spread of Water in Wrangler Drive. Stormwater from the 100-year frequency storm will be allowed to flow in the street to a maximum depth of six (6") inches (from curb to curb), with no provision for a "dry-lane" of traffic. Curb inlets in Wrangler Drive will be designed and placed accordingly. .XL-/' Curb Return Radii. The existing curb returns (30-foot radii) at the Wrangler Drive/Belt Line Road intersection will not be removed or reconstructed in conjunction with this project. All other curb returns on the project will also have 30-foot radii, with the exception of the Freeport Parkway/Wrangler Drive intersection where the curb return radii will be 40 feet. Schedule for Submittal of Schematic Plans and Report. The proposed submittal date for the Schematic Design has been temporarily suspended until the plans for the Airline Drive storm drainage design are provided to TNP. TN'P will provide a revised schedule to the City once this information is received. Should you have any questions or comments regarding our understanding of last week's meeting, as stated above, please give us a call. Otherwise, we will wait to hear from you when the plans for the Airline Drive drainage improvements are available and ready to be picked up. Thank you again for your time and assistance.