CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Name of Applicant ICasey Dillon Date Submitted 5/15/19
Address of Applicant
2021 McKinney Ave #1050 Dallas TX 75201
469-236-1434 Fax Number
Location of Construction (address, if available): I l u N. Freeport Parkway
Subdivision Prologis Park 121 Section # Block # Lot ff 1 R
OR Survey/Abstract # Acreage 7.17
Location description (attach vicinity map):
Corner of Freeport Parkway and Sandy Lake Road
1. Type of proposed construction or development:
(', Residential C Alteration of a natural waterway drainage course
C, Non -Residential Other (describe & attach drawing or sketch)
C' Placement of Fill (in right-of-way or on private property)
2. Description of Construction Permit requested:
X❑ Paving
MX
Median or Landscape
KISidewalk
Q Drive Approach
❑X Excavation
❑X Fire Lane
❑ Bridge
❑ Water Main
❑X R.C.P.
❑ Sanitary Sewer Main
❑ Flume
❑X Inlet
❑ Box Culvert
❑ Rip Rap
❑ Fill Area
❑ Drainage Channel Excavation
❑X Slope Protection/Retaining Wall
❑X Parking Lot
Provide an attachment containing the name and 24 -hr. contact phone number
of supervisors) for every contractor working under this general permit.
3.A11 construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2
S.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due. $ 21,294.80 Date Paid:
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
➢Any work requiring closure of a lane of traffic, street, or alley must be approved in
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department @ 972-462-5150
Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679
➢Attach barricade plan / trench safety plan of a lane or street closure. (Required)
➢It is a requirement of this permit that As -Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY
unless otherwise approved by City Engineer.
➢A pre-
construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing your name indicates your acceptance of the terms and conditions of this form:
Casey Dillon
Signature of Applicant
Signature of Inspector
469-236-1434
Contact Number
Contact Number
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? �' Yes l: No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? (Yes
Cd No
Are other federal, state, or local permits required? Yes (0 No
0 PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED
City Approval
Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
I T V F
:OPPELL
INSPECTION FEE CALCULATION SHEET
Project Name jPrologis Park 121 Building 1 Date 5/15/19
Page 3
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre -construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development cont►•act(s) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
Grand Total (total of 21,294.8
both colored fields)
Submit by E-mail Print Form
PUBLIC IMPROVEMENTS
o
PRIVATE IMPROVEMENTS
o
CONTRACT AMOUNT
CONTRACT AMOUNT
Paving
21,726
869.04
641,015
12,820.3
Water
41895
195.8
144,450
21889
Sanitary Sewer
0
46,076
921.52
Storm Sewer
0
179,957
31599.14
Alleys
0
0
Sidewalks
Other
Total
11064.84 '
30,229.9:6.
Grand Total (total of 21,294.8
both colored fields)