Spectrum-PT200319 (2)RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: Applicant’s Job # / Work Order #
PERMIT FEE:$100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider?
Utility Company Represented:
Oncor Electric Delivery Atmos Energy Verizon SBC/ AT&T
Time Warner Cable CoServ Electric/Gas Other
Estimated Start Date Estimated Completion Date*
* Completion requires submittal of Completion Verification Notice (see page 4)
ØWas contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: Yes No
ØIs removal of existing streets, alleys, or sidewalks necessary? Yes No
if YES, project must have City inspection prior to concrete replacement
CC: Applicant
Public Works
Permit File
Orig. to Project File
Page 1 of 4
Rev. 06/2012
A copy of the approved permit must be on the job site at all times.
Yes No
General Description of Work (In accordance with Ord. No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK
Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
General Contractor
Project Name/Location or address
Contact #
E-mail address to return permit
E-mail address:
Telephone #:
Representative:
Franchise
Company:
(for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete)
X
3/17/20 1938604
State Farm 600 S. Denton Tap # 103
GW Communications Solutions Tim Norman 612-865-9897
tim.norman@glassandwire.com
Ashley Singleton
214-320-5439
ashley.singleton@charter.com
X Charter/ Spectrum
Placement of 95' of new UG cable from existing ped at 109 Meadowcreek Rd. N to East side of project location at 600 S. Denton Tap Rd.
and setting new pedestal
3/25/20 4/11/20
x
Right-of-Way Use Permit Application Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
ØAny excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department @ 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
ØAttach barricade plan / trench safety plan if a lane or street closure is required.
NOTE:Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City
Engineer.
ØAttach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov.
ØNOTE:Notify City Inspector at 972-304-3679 prior to beginning work and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
Comments
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
DateSignature of City Representative
DateSignature of Contractor Representative
DateSignature of Utility Company Representative
Ashley Singleton 3/17/20
3/17/20
Scott Latta 03/19/2020
The contractor shall submit the Completion Verification Notice
form on page 4 upon completion of the work.
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
8.Repair existing utilities that are damaged, including but not limited to clean-outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
10.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
12.Prior notice of work activity on weekends and holidays must be in writing.
13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility-operations-division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN.
214/ 320-5455 (Mike Rasmussen)940/ 898-5138
AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY
214/ 215-3031 (Rich Millenman)817/ 588-5800
COSERV Gas & Electric DENTON CO. LEVEE DISTRICT
940/ 321-7800 x 7624 (Greg Ward)214/ 352-5118 (Richard Hightower)
EXPLORER PIPELINE Atmos Energy
918/ 493-5100 (Patrick Nwakoby)972/360-4428 (Gary Dickinson)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates
972/ 318-5277 (344 - 8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16.“Clean-up” requires returning work area to pre-project condition or better.
17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
Page 3 of 4
Page 4 of 4
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name
Project Location / Applicant's Work Order # (if applicable)
Sub-contractor Company Name
24 hr.Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
A copy of this completed notice can be provided to the address below
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office: 972-304-3679 Fax: 972-304-3570
Follow-up needed? Follow-up scheduled for Yes No
and found to be acceptable / not acceptable because
of Streets Maintenance Division on vInspected by
and found to be acceptable / not acceptable because
of Utilities Maintenance Division on vInspected by
Follow-up needed? Follow-up scheduled for Yes No
Submit by E-mail Print Form
Charter / Spectrum
1938604
600 South Denton Tap Rd. Coppell
GW Communication Solutions
612-865-9897
217
221
229 233
122
140
134
149
153
157
699
CNA*6
C598-1
C598-3
C598-2
C102
109
108
110
112
CNA
118
C590
116
114
205
208
217
201
209
182
190186 213
200
204
208
141
603
145
602
209
213
216
121
VL
150
160
125
154
126
129
158
133
162
130
166
134
137
170
174
178
193
109
110
105
106
101
102
C684-100
C702-140
C702*6
C712
113
117
156
715
700 714
716
713
711
706
702
707
711 700715
703
100 361'109'
108'
389'
1
8
4'
141'133'21'1
5
6'
200
'228
'188
'422'158'365'101'252'160'134'114'
32'122'
222'
40'
107'290'147'
90'
196'
1081'196'231'
50'152'80'155'226'
153'79'
222'
200'365'
103'151'
123'150'316'
152'
127'50'110'65'133'154'50'86'
249'
118'
100'202'124'10'38'97'50'153'170'170'484'
10'108'300'86'182'
192'
192'
1
3
8'
181'SSSSSSS
S
SS
S SS
S
-8-9-7 -7-8
26 2623
262
6
14
26 23 20
2
6
111116.3
17.1
19.5
26
268
4
17.0
16.7
18.2
20
23
17
2
6
20
26
1
0
14
416.5
17.0
20.6
171723
23
17
17
10419.6
19.0
19.6
2316.1
11.6
6.2
82010
17.2
17.4
19.2 1720.9
18.6
16.8
7
28.7
26.0
22.7
26
26
2 2
1
0
2
2
2
2
2
2
2
1
2 4
22
2
2
0 2
4
1
1
2
2
2
2
2
2
2
4 6
10
2 0 7
0
2
0
0
0
0
0
0
1
0
0
0
2
1
0
2
1
0
0
3
0 0 30 0 0
0
1
0
0
R
25UC
R
25
R
25
R
25
R
25
UC
V
V
IN
6BLE-1000 @51
4406AAB5M1
25.1 26.9 31.3
51 46.3 39
6 14 16 6
4406B 59.5
770
4406AAB5M1
4406AAB4H1
IN
6BLE-1000 @51
4406AAB5H1
30.4 30.7 33.8
51 46.3 39
12 10 18 6
4406B 64.5
730
4406AAB5H1
4406AAB5C1
4406AAB2F0
T
3MB-1000 @51
4406AAB3W0
31.6 29.7 27.4
51 46.3 39
17 CS5 7 4
4406D 87.6
545
4406AAB3W0
4406AAB4C1
4406AAB4D1
4406AAB3K0
T
4BLE-1000 @51
4406AAB4Y0
22.9 22.5 25.9
51 46.3 39
4 9 10 6
4406D 82.3
826
4406AAB4Y0
4406AAB4W0 4406AA4406AA
FIRST BAPTIST CHURCH
CHATEAUS DRCORSICA CT MASON CTE BETHEL RD
SALEM CTTOWER CTTOWER CTRSR
EST513
517
521
525524
528
532
536
540
544
529
533
537
541
545
456
139
142
460
143
146
448
147
150
513
521
525
512
516
520
123
126
440
127
130
444
131
134
452
135
138
144
491
142
499
487
495
146
483
148
453
484
479
150
457
480
152
476
468
472
156
529
533
537
541
545
C495
21
C580*13
C504
C500
421
425
429
437
472
480
476
484
502
473
485
501
477
481
500
482
474
520 524
C485
482
474
478
486
467
475
479
483
487
26
VL
109
20
105
22
23
13
19
216
212
16
122
204
522
518
514
517510
509
521528513
507
506
505
500
525503
291
8
9
7
661
28232
3
6
27
5228
4
224 7'98'4'182'117'219'226'206'298'210'279'104'208'178'195'408'264'152'48'183'209'3
5
7'
161'
1
9
7'
164'
181'80'
50'
50'
124'
203'
3 3 3 '50'50'
198'221'390'295'
65'
172'200'
180'
140'
184'132'
194'201'40'84'19'31'
100'5'97'
192'
1
3
2'
193'
1
2
0'
248'
170'175'85'204'211'111'197'348'
55'81'55'
1
7
6'
95'
S
S-8-8
21.6
20.4
19.9
50.3
45.8
38.6
51
46.3
39
28.0
23.4
16.4
90V
4405C
22:B
7.2A
90V
4405A
22:A
5.1A
90V
4427A
15 A
2.06A 2322.7
19.7
14.5 2617 2623
26
2620172626
816.9
16.8
17.8 142023 23 23
16.7
13.5
10.3
231721.2
20.5
18.1
2
3 2323
17
20.4
17.0
12.7
17
18.4
17.3
16.9717.5
17.4
21.3
1423
23
23.1
19.0
12.6
172314
2323 1423172320172326
2
6
420.9
21
21.1
23
23
8
14 20813.7
14.2
15.5 1120
14.6
13.9
14.426172617
2 0
1714
4
3
4
1
4
4
4
4
2
2
4
3
2
2
3
2
2
2
2
4
2
0
2
2
2
2
2
1
2
2
2
2
2
2
2
2
2
2
4
1
2
2
4
13
0
1 100000
3
1 0
4 0 0 0
3
1
3
0
0
3
4
2
2
2
R
25
I
3MB-1000 @51
4407AAB3K1
25.6 25.4 27.9
51 46.3 39
15 4 8 4
4407B 82.4
7434407AAB3K1
I
2BLE-1000 @51
4407AAD2D0
29.1 29.7 33.6
51 46.3 39
10 11 18 6
4407B 86.3
865
4407AAD2D0
I
3BLE-1000 @51
4407AAB3H1
27.1 27 27.8
51 46.3 39
9 6 12 4
4407B 82.5
504
4407AAB3H1
T
2BLE-1000 @51
4407AAB2G1
25.2 26.8 32.8
51 46.3 39
6 16 17 8
4407B 83.3
954
4407AAB2G1
THRU
NC4000 @51
4427AA
51 46.3 39
4427A 90
4427AA
I
2BLE-1000 @51
4427AAC1H0
24.6 26.1 29.4
51 46.3 39
6 12 14 6
4427A 89.0
815
4427AAC1H0
I
2BLE-1000 @51
4407AAA2A0
21.4 23.8 31.6
51 46.3 39
2 20 16 8
4407B 85.2
1073
4407AAA2A0
I
1BLE-1000 @51
4407AAC1C0
26.5 26.1 29.1
51 46.3 39
8 9 14 6
4407B 88.2
690
4407AAC1C0
I
2BLE-1000 @51
4427AAC1C0
25 26.5 29.5
51 46.3 39
6 11 14 6
4427A 89.0
790
4427AAC1C0
I
3BLE-1000 @51
4405AAD2D0
23.8 24.1 28.5
51 46.3 39
5 12 13 6
4405C 88.5
8034405AAD2D0
T
2BLE-1000 @51
4405AAD1D0
31.7 28.5
46.3 39
13 4
89.3
323
4405AAD1D0
4410AA4407AA
4405AA
4405AA
4427AA
4427AA4405AA 4407AA4407AA
4427AA 4427AA4407AA4427AA 4427AA4407AACOUNTRY LNOLYMPIA LN WALES CTKNI
GHTS WAYO
LY
M
PIA LN
WALES CT
HIDDEN VALLEY DR
M
A
Y
W
O
O
D
C
IR
SANDY OAK LN
OAKCREST DRMEADOWCREEK RD HUNTERS RIDGE DRALEXANDER CT
AFTER ECO S0710017
10-25-07
COAX NOT BUILT
COAX NOT BUILT
AFTER ECO S0710017
10-25-07
ALEXANDER CT
COAX NOT BUILT
DP
DP
DPDP
C
D A
B
9
5'
0
13
C600*13
-8
2
0
1
7
6
46.1
41.9
35.2
4406AAB7C1
THRU
3MB-1000 @51
4406AAB3K0
22.3 24.3 30.5
51 46.3 39
11 12 11 6
4406B 69.6
1323
THRU
5MB-1000 @51
4406AAB4H1
14.3 16 20
51 46.3 39
3 8 7 8
4406B 65.4
1035
THRU
5BLE-1000 @51
4406AAB5C1
24.4 26.3 32.2
51 46.3 39
5 16 17 6
4406B 64
927
24.9
21.2
16.4
THRU
3MB-1000 @51
4406AAB2F0
22.6 23.2 25.9
51 46.3 39
12 5 6 6
4406B 70
1056
THRU
4BLE-1000 @51
4406AAB4W0
17.9 17.2 20.1
51 46.3 39
Z 8 11 8
4406D 82
985
1938604
IN
4BLE-1000 @51
4406AAB4D1
22.4 22.9 27.2
51 46.3 39
4 12 12 6
4406B 67.5
767
THRU
4BLE-1000 @51
4406AAB4C1
20.6 22.3 26.8
51 46.3 39
2 14 11 4
4406B 66.2
751
IN
4BLE-1000 @51
4406AAB7C1
29.2 26.7 24.6
51 46.3 39
11 CS1 9 2
4406B 67.7
349
NAME: STATE FARM JEREMY ROUGEAU
ADDRESS: 600 S DENTON TAP RD STE 133 COPPELL TX 75019
LOB: SMALL/MEDIUM BUSINESS TYPE: COAX
PRISM# 1938604 CONST# --
POC: JEREMY ROUGEAU STATE FAR, 337-540-8797
NODE/HUB: 4406 / 41 MAP: 3054-3321
OU: -- ZONE: --
DESIGN DATE: 02/27/2020
AFTER
PLACE DC-8,
ACTIVE, 2WAY,
W/TERM
95' UG 625 P3 COAX CABLE
PLACE 2 8PORT TAPS AS-SHOWN W/TERM
SOW: PLACE DC-8, ACTIVE, 2WAY, W/TERM, 95' UG 625 P3
COAX CABLE, PLACE 2 8PORT TAPS AS-SHOWN W/TERM
FACEPLATE CHANGE
FACEPLATE CHANGE
FACEPLATE CHANGE
FACEPLATE CHANGE
MOVE TAP
Ped
Bore 95'