Loading...
Coppell Cross 1P-CS 970828 (2)DEVELOPMENT REVIEW COMMI'ITEE ENGINEERING COMMENTS ITEM: PD-164. Cem~ ~. · ~d~g clumge./'rem "C" (Cemmerda/) to "PI)-C" (Harmed Devdop~ Co~), to arrow a redrawn in side yard and landscape setbaeks for a commercial plann~ develop~ consisting of 6 co~ Indlt~gs and a fttatre restaurant site on a 9.89 acre tract of land, located at the nortltwest corner of MacAttlmr Btv& and Belt Line Road, at the request of Htmter Associates of Texas, Ltd.. DRC DATE: Augttst 28, 1997 and Selnember 4, 1997 CONTACT: Mike Martin, P.E., Assistattt City Engineer ($04-$679) COMMENT STATUS: ~'PRELIMINARY FtNAto ~ 1. Provide additional information for the proposed driveway at thc southeast corner of the development. Need to show location of existing signal and arms for railroad crossing, location of traffic signal poles and distance to the Belt Line Road intersection. The driveway may need to be shifted north. 2. Show the drainage easement for the existing double 7'x4' box culvert located at the northwest corner of the property. Also, show the drainage easement for the 2 - 36" RCP's located on the south side of the property. 3. Show zoning of adjacent property to the north. 4. On-site sanitary sewer needs to tie into existing manhole approximately 270' west of MacArthur Blvd. No new manholes will be allowed. 5. Show correct scale of 1" =50'. 6. Dry bore water line beneath MacArthur Blvd. 7. The previous plan on this site (MacArthur Plaza Phase 2) showed the water line around the site to be mostly in landscaped areas, not under pavement. This plan shows most of the water line under proposed and future paving. Therefore, the water line should be private.