Coppell Cross 1P-CS 970925 (2)DEVELOPMENT REVIEW COMMI EE
ENGINEERING COMMENTS
ITEM: I'D.I~. ~ ~. ss ~ e.k~ porn "C"
to ~PD-C~ (Planned Development, Commerdal), to allow a
in ~ yard and landscape s~acl~ for a ¢o~ plmmed
development consisting of 6 commercial buildings and a future
restaurant site on a 9.89 acre tract of land, located at tke nortkwest
comer of MacAttkur Blvd. and Belt Line Road, at tke request of
Hunter Associates of Texas, Ltd.
DRC DATE: September 25, 1997 and October 2, 1997
CONTACT: Mike Marthz, P.E., Assistant City Engineer (304-3679)
COMMENT STATUS: ~PRELIMINAR Y FIN,~.L
These comments are based on the last site plan submitted for the last DRC meeting on
September 17, 1991.
1. Provide floodplain signature block.
2. It appears that the drainage easement for the existing double 7'x4' box culvert located at the
northwest comer of the property is inadequate across Lot 5. Also, show the drainage
easement for the 2 - 36" RCP's located on the south side of the property.
3. Show zoning of adjacent property to the north.
4. As previously discussed, water line around site should be private. Please comment as to
what the 15' utility easement is for. Note also that minimum width of easement is 20'feet.
5. New site plan should be provided that addressees prior comments concerning driveways,
manholes, bores, water lines, etc.
6. Please comment as to what the 10' utility and landscape easement at the northeast comer
of Lot 1 is for. It is not contiguous to the 12' street and utility easement, therefore, it is
not wide enough.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
development of 7 commercial lots on a 9.89 acre a~t of land,
located at the nor:hwest corner of MacArlhur Boulevard ami
road, at tke request of Hunter ~ of Te~ts, Ltd.
DR¢ DATE: Septonber 25, 1~7 and October 2, 1~7
CONTACT: M~e Man~ ~.~.,
COMMENT STATU$: ~PRELIMINAR Y
See PD-164 for comments.