Coppell Cross 1P-CS 971223DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: pD-164R. Com~ Crossing Addition, a zoning change from "C"
commoz~ to "PD-C" Plo:reed Depelopmeat. Commo~a/, to a/Zo., the
elimination of ~ side yard building setbacks and the ~ landscape
requirements on the interior lot lines and reduce the rear yard setback to 2
feet along the TP&L easement, on a 9.891 acre tract of land, located at the
nor~rt corner of MacArthur ~ and Belt Line Road, at ~ request of
Kurtz & Bedford Associates, Inc.
DRC D,4TE: December23, 1997 and Decembar 30, 1997
CONTACT: ~d~ Mar~ P.~, Ass~a~ Cay £ng~er ($04-$~79)
COMMENT STATtI$: ~PREL1MINAR¥ ~ ~
1. Provide deceleration lanes for driveways on Mac~ Blvd.
2. Provide a 5' sidewalk along Mac~ Blvd.
3. Provide a drainage easement across south end of lots 2 and 4, Block 1.
drainage easements.
4. Provide utility plans so location of easements can be determined.
Also, show all other
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Co~dl ~ A&fttio~ Prdlndnarv t~at, to arrow the develop~ of
commercial lots on a 9.891 acre tract of ~ located at tire
comer of MacArthur Blwt and Belt Line Road, at the request of Kurtz
DRC DATE: December23, 1997 and December 30, 1997
CONTACT: M~d~e Mart~ P.E, A~isamt Cay Engineer 0O4-3679)
COMMENT STATtlS: ,~PREL1MINARY ~
1. Provide utility plans so location of easements can be determined.
2. Provide deceleration lanes at all driveways intersecting MacArthur Blvd.