Loading...
Coppell Cross 1P-CS 980226DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coo~ell Crossi_n__o ~4,ldUton. Lot 1. Block 1. Final Plat and Site Plan Review. to allow the development of two retail buildings on 3.137 acres of property located 361' north of Bdgine Rotu~ along the west side of MacArthur Blvd., at the request of MocMngbird Managemena DRC DATE: February 26, 1998 and March 5, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS: ~PRELIMINARY a r.~v P~Z 1. On the Final Plat show the new right-of-way dedicated for the deceleration lane similiar to the way it is shown on the Site Plan. 2. All utility and drainage easements for City utilities must be a minimum of 20' wide as per the City Subdivision Ordinance. 3. Provide 8' wide brick paver band for driveways intersecting MacArthur Blvd.