Loading...
Coppell Cross 1P-CS 980226 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coo~ell Crossin~ A,hl#~on. Lot 1. Block 1. Final Plat and Site Plan Review. to allow the development of two retail buildings on 3.137 acres of property located 361' north of Beltline Road, along the west side of Mac.4rtkur Blvd., at the request of Mockingbird Management. DRC DATE: February 26, 1998 and March 5, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (304-3679) COMMENT STATUS 1. Need to dedicate offsite easements and fire lanes on Lots 3, 4, and 5, Block 1 by separate instrument.