Coppell Cross L1-CS 980505COPPELL, TEXAS 75019
P.O, Box 478
Coppell, Texas 75019
972-462-0022
May 5, 1998
Mitch Vexler
Mockingbird Management Co.
P.O. Box 293053
Lewisville, TX 75029
RE: Coppell Crossing Addition, Lot 1, Block 1
Development Fee Assessment
Dear Mr. Vexler:
Enclosed is a revised copy of the City of Coppell Development Fee Assessment Table. No
payment is required at this time. Paragraph 14 of the CED Settlement Agreement approved by
City Council on June 12, 1997 waives up to $51,000.00 of fees for this property during the
initial two-year time frame after approval.
Please refer to attached table for additional fees. Also, provide a copy of the Engineer's
estimate or contract to our office so the consmiction inspection fee can be verified.
Construction inspection fees and building permit fees may also be waived until such time as the
$51,000.00 has been exhausted. The attached Fee Table waives $42,883.15 of the $51,000.00.
This leaves a balance of $8116.85 that could still be waived prior to June 12,1999.
If you have any questions, please contact me.
Sincerely, . ~ ~
Director of Engineering and Public Works.
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Coppell Crossing Addition, Lot 1, Block 1
Date: 4/24/98
I
~ TOTAL AMOUNT DUE
FEES DUE PRIOR TO
' COUNCIL
APPROVAL
Water Impact Fee * $5850.00 *
(100% due prior to Council Approval)
Water Tap Inspection Fee * $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) * $192.15
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) * $2940.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $60.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee * $3600.00 *
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee * $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee * $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee * $30051.00 *
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $95.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
* Fees in the total amount of $ 42,883.15 waived per paragraph 14 of the
CED Settlement Agreemem approved by City Council on 6/12/97.