Loading...
Coppell Cross L4-CS010627June 27, 2001 Mike Macaluso Terra Builders, L.C. 2200 Morriss Road, Suite 310 Flower Mound, TX 75028 RE: Coppell Crossing-t~ 6t~J~- FILE Dear Mike: The City of Coppell has recently completed a follow-up walk-thru ia the referenced project. Listed below are items that must be addressed prior to final acceptance. 1. Need 1" meter loop to set 1" meter for domestic. 2. Need 5/8" meter loop to set 5/8" meter for irrigation. 3. Need to test DC for irrigation and have paperwork. 4. Manhole chimney seal on 18" sewer line bottom ring loose. 5. Seal joints in curb. 6. Rout and seal all random cracks (painted white). 7. Backfill behind sidewalk. 8. Complete reinstallation of traffic loop. Thank you for your cooperation during the construction of this project. If you have any questions, please call me at (972) 304-3685. Sincerely, CC: ' Ken Griffin, Director of Engineering Rhonda Brothers, Engineering Secretary Glenn Hollowell, Asst. Director of P.W. Greg Jones, Chief Building Official Travis Crump, Fire Marshal 25*5 PARKWAY dr P.O.BOX 478 dr COppI='LL TX 7!5019 dr TEL 972/462 0022 l&'FAX 972/304 3673 ~1., ~55 1940 NOV 08 '00 18:38PM OFFI~CEMTER TERRA BUILDERS, l.C. DATE: Wednesday, November 8, 200~ SUBJECT: FAX COVER SHEET NO. OF PAGE.S:.1 with Fax Memo ,d;;[;{*]L',+ Mike Macalu$o Terra Builders. L.C, 2200 Morriss Road Suite Flower Mound, Tx 75028 TO: Michael Martin City of Coppell 255 Parkway Blvd. Coppell, TX FAX NO.: 972-304-3570 ......... ,.-,,,,,,-,..-..-- PHONE NO.: 972-304-3681 PHONE NO.: 972-355-1014 PROJECT: Coppell Crossing 3 '~"~ ~ Requested Letter from TXU Gas P.1 0 Attached please find the letter fromTXUGa$, (f(~r~lliy know as LoneStar Pipeline), that you requested from us for the proposed work over the gas easement on Lot 4 at 777 N. MacArthur in Coppell. This letter should finalize all previous requests you required for us to install the site utilities on both Lots 4 & 5, We are proceeding aa per this letter to the area over the gas easement. Should you have any further requests, please let us know. Thank You for your cooperation in this matter, Mike Macaluso Project Manager PC: IF YOU DO NOT RECEIVE ALL OF-;I'HE INDICATED PAGES PLEASE CALL OUR OFFICE IMMEDIATELY. 992 304 3549 06×27x01 10:34 CITY.m~COPPELL ~ CITY OF COPPELL ~ N0.135 QO1 To~ From: Date: RE; MEMORANDUM FROM TIiE DEPARTMENT OF PUBLIC WORKS Garretb Campben, construction Inspector Encneer~ Lm-y Morton, Streets Division Public Works June 27, 2001 Wldk-thru Coppell Crossing II 6/2SI01 Seal joints in curb. Rout and seal M! rundmn cracks (painted white). hckflH behind sidewalk (~s~iS,~mfi. Note: Call 972-~3~ when ready for re-walk. CITY OF COPPEI. L I~BLtC WOR~$ DEPAItTYEArT 08:11 9?2 30m 354? CITY,~ COPPELL + CITY OF COPPELL N0.121 MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS Garreth Campbell, Const~ction xn~ctor F~ugin~ Danny Hightower, Utilities Division INiblic Works June 26, ZOOt .... FOUow-up Walk-thru Copp~l Crossing Lot 4 6/2~/01 Need 1 ' meter loop to set 1' meter for domestic. Need 5/8' meter loop to set $/8" meter for irrigation. Need to test DC for ~tion and have paperwork. M~nhole chimney seal on 18" sewer line bottom ~ loose. Note: Call 972-30~-3S~, Danny Hightow~r, when ready. CITY OJ~ COPPEI..L p~J~IJC WOi~Eg Dg~AR~M~NT