Loading...
Coppell Cross L4-CS 991028DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coppell Crossing Addition, Lot 4, Block 1, Final Plat and Site Plan Review, to allow the development of a 11,570 square foot office/showroom facility on approximately 1.5 acres of property located at the northwest corner °ii MacArthur Boulevard and the D.A.R.T. right-of-way, at the request of Dunaway Associates, Inc. DRC DATE: October 28, 1999 and November 4, 1999 CONTA CT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COMMENT ,.q TA TUS: PREL. La. ~!?L ~ R Y The building should be located on the lot such that no portion of the building or building walkway interferes with the drainage/sanitary sewer easement along the south side of the building.