Loading...
FEMA-EC990601The City With A Beautiful Future /7a e - 3y BUILDING PERMIT APPLICATION Print or Type in a Clear, Legible Manner Job Address: O ) N� L— Date: Lot: Block: Subdivision: V L / Phase or Section Number: Z' Owner Address: B S`Phon #: M /�. Contractor: Address: `� hone #: e^ N 0 D� 7 M - Description of Work to be Done Class of Work: New ❑Addition ❑Alteration ❑ Repair ❑ Demolition J /9 Go /vSfI' C-Sf SON Area of Building in Square Feet ty� First Floor 2%0S Garage 72 Value of Work to be Performed � � ?' �� �%• �:lc� Second Floor 132 4 Other 22-2, GRAY AREA FOR OFFICE USE ONLY NOTICE • Ix This permit becomes null and void if work or construction authorized is not commenced within 180 days, or construction on work is suspended or abandoned for a period of 180 days at any time after work is commenced. u I hereby certify that I have read and examined this application and know the same to be true : and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other federal, state or local law regulating construction of the performance of construction. S. ,.r rt:, �d a .. .. :. .. �. xw ::.. :: ;. ,nsr .p rid' ,;...: '„'�P„a... 1. t:: F.. .,•'•? ..'_.q za ........ r< �,'G?.v_ v _ • �i,l §• ,I<Sf ✓ :_ . a- °' r ";5MM"IT. �, = s�T,xu G k; it e Sign of Contractor or Authorized Agent 'nt Name \�S' Y., f t1 ?. ,�`' d : . .:x; +A't r ri .: /♦�/�r ,;'r, Electrical Contractor Plumbing Contractor Mechanical Contractor FPMC - 1 (4/94) BUILDING INSPECTION - WHITE, APPRAISAL - YELLOW, CUSTOMER - PINK W1 ELEVATION CERTIFICATE FEDERAL EMERGENCY MANAGEMENT AGENCY NATIONAL FLOOD INSURANCE PROGRAM ATTENTION: Use of this certificate does not provide a waiver of the flood Insurance purchase requirement. This form is used only to provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR). Instructions for completing this form can be found on the following pages. SECTION A PROPERTY INFORMATION I FOr, INSURANCE COMPANY USE BUILDING OWNER'S NAME I POLICY NUMBER STREET ADDRESS (Including Apt., Unit, Sults and/or Bldg. Number) OR P.O. ROUTE AND BOX NUMBERI COMPANY NAIL NUMBER OTHER DESCRIPTION (Lot and Block Numbers, etc.) /Il•?G i✓Ot/.A CITY STATE ZIP CODE L'OP,AefGG , TX. SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION Provide the following from the proper FIRM (See Instructions): 1, COMMUNITY NUMBER 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE S. BASE FLOOD ELEVATION nn AO zenee. use depth) 7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): ❑ NGVD '29 ❑ Other (describe on back) 8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, Indicate the community's BFE: I I I I I I.0 feet NGVD (or other FIRM datum -see Section 8, Item 7), SECTION C BUILDING ELEVATION INFORMATION 1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best describes the subject building's reference level __ . 2(a). FIRM Zones Al -A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram Is at an elevation of I.1__1411,L7 V1 feet NGVD (or other FIRM datum -see Section B, Item 7). (b). FIRM Zones V1 -V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the selected diagram, is at an elevation of U 1 1 feet NGVD (or other FIRM datum -see Section B, Item 7). (c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram Is UJ.0 feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. 41W. 41, 47.'7 W#YS rhW&W 4 7 -7 -ye (d). FIRM Zone AO. The floor used as the reference level from the selected diagram Is UJ.0 feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference level) elevated In accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown 3. Indicate the elevation datum system used In determining the above reference level elevations: ❑ NGVD '29 ❑ Other (describe ' under Comments on Page 2). (NOTE: If the elevation datum used In measuring the elevations is different than that used on the FIRM (see Section B, Item 71, then convert the elevations to the datum system used on the FIRM and show the conversion equation under Comments on Page 2.) 4. Elevation reference mark used appears on FIRM: ❑ Yes ❑ No (See Instructions on Page 4) 5. The reference level elevation Is based on: ❑ actual construction ❑ construction drawings (NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which case this certificate will only be valid for the building during the course of construction. A post -construction Elevation Certificate will be required once construction is complete.) 6. The elevation of the lowest grade Immediately adjacent to the building is: I I I I I I .0 feet NGVD (or other FIRM datum -see Section B, item 7). This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation Information when the elevation Information for Zones Ai -A30, AE, AH, A (with BFE),Vi-V30,VE, and V (with BFE) is required. Community officials who are authorized by local law or ordinance to provide floodplain management Information, may also sign the certification. In the case of Zones AO and A (without a FEMA or community Issued BFE), a building official, a property owner, or an owner's representative may also sign the certification. Reference level diagrams 6, 7 and 8 - Distinguishing Features -If the certifier is unable to certify to breakaway/non-breakaway wall, enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered. I certify that the information in Sections B and C on this certificate represents my best efforts to interpret the data available. I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. • � 0 CERTIFIER'S NAME LICENSE NUMBER (or Aft Seel) TITLE COMPANY NAME /' �f s rTw' J. 1�f,1�1;•,r • • ADDRESS CITY �.' ZIP _/36 g;P06 SIGNATURE DATE Pft .. Copies should be made ofihls Certificate for: 1) community official, 2) Insurance agent/company, and 3) building owner. COMMENTS: 696661L & oD,C_Tid L'ON701?04 67,4270/V /Ye -).44 --_—i_ L�T_ZTTT�jZT/7 TTTTTLz.TT1 //Z I-� - S U I�, V E Y P LA rI' �7�/-Z-Z--,-/ BEING LOT 2, BLOCK E OF MAGNOLIA PARK AN ADDITION TO THE CITY OF COPPEL, DALLAS COUNTY, TEXAS. RECORDED IN VOLUME 98145, PAGE 0506, P. R. D. C. T. REFERENCE DRG. S 84''49x49• ty J / C RAD.= 49(;.20 66 .90 I' LOT 2 BLK. E IO.D W O o W CV CID r� FORMBOARDS I x9.7, W I w co 1 n 10.0 I I CID I N I o ,2 LOT 1 — --- j ao a L — �— 6 M o LOT 3 M SET "X" SET "X' S' UTIL. ESTM. CABLE BOX 1.67 RAD.= 250' 88.33 RAD.= 360• 607 CANEMOUNT LAN, I hereby certify that on the30TH- day of APRIL 19 99_, this survey was made on the ground and this survey plat has been prepared as per the field notes thereby produced, and it properly represents the facts as found on the ground. This survey plat has been prepared in accordance with, and in substantial compliance with , all rules and regulations promulgated by the Texas Board of Professional Land Surveying. Unless otherwise noted, the surveyor has relied solely on the record data provided in the title commitment for the determination of the boundaries of the land parcel surveyed and for any easements of record which may be shown or addressed on the survey. The survey shows visble easements, encroachments, conflicts, or protrusions apparent on the ground. OF T Date MAY 3, 1999 ��P,�EcsrFR�op9 J0J3 99-2903 N\ #f -- GF No. HARRY .1. ROWELL -- --- - 4597 / m . /`7 �"A• /��>a�°, YLEGEND Scale: >" 25' gs5 1/2" Steel Iron Rod Found O SUP, IIA R� 1 Steel Iron Rod Set {OW A L L Property Line By .C _ Wood Fence Surveying &Engineerin Engineering Chain Link / Wire Fence XX—X—X—X 1301 Elm Street Ste. 201 Overhead Electric E-- E E �. _ arrollton, Texas 75006 (972) 242-567911 Lorr 2 "A,Ggcuf*, ,,pqZ Op id -i ea qz, ---------- eA 4 jo tmtich, rip it lip, Z/ Pg/,WM 15r S�LVIA e PT I "PF ry C. FRAMING Figure 3 shows a typical framing of this appliance using combustible materials. All required clearances to combustibles must be adhered to. This appliance may be placed on a smooth combustible or noncombustible continuous, flat surface. When the appliance is installed direct- ly on carpeting, tile or other combustible material other than wood flooring, the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance. Slide the unit into position and level the appliance from eablator The f rst name in fireplaces CAUTION WEAR GLOVES AND SAFETY GLASSES FOR PROTECTION. CAUTION PROVIDE ADEQUATE CLEARANCES AROUND THE AIR OPENINGS INTO THE COMBUSTION CHAMBER AND ADEQUATE ACCESSIBILITY CLEARANCES FOR SER- VICING AND PROPER OPERATION. THE UNIT r side-to-side and front -to -back. Shim with noncom- bustible material as necessary. Secure the appliance by bending out the nailing flanges on each side of the appliance and nail to framing. The nailing flanges have been positioned 5/8" back from the front of the unit to allow the addi- tion of drywall. 12-97 5i 28887A E. VENTING NOTE: THIS APPLIANCE REQUIRES A 5 INCH 9 -VENT FOR OPERATION. NEVER DOWNSIZE PIPE. a. Clearances. See Figure 4 for clearance information. b. Vent Lengths. Various venting configurations are shown in Figures 5 and 6 from which maximum vent o runs can be determined. MINIMUM CLEARANCES ARE PER VENT MANUFACTURERS' f A/ SPECIFICATIONS METAL PLUMBERS' STRAP SECURED TO FRAMING 40' MAX. w� 9' MIN. t VENT SUPPORTS ARE PER VENT MANUFACTURER'S SPECIFICATIONS 1 Figure 4 Vertical Termination Clearances i NT SUPPORTS ARE yr METAL NT MANUFACTURER'S LUMBERS' STRAP SPECIFICATIONS MAXIMUM HORIZONTAL RUN IS 50% OF VERTICAL. HORIZONTAL RUN CANNOT BE MORE THAN 20' Figure 5 Vertical Termination Vent Lengths 12-97 61 28887A