Loading...
FEMA-EC950202W �g99)a3� The City With A Beautiful Future BUILDING PERMIT APPLICATION 1,4)2 7 ;� , 17Print or Type in a Clear, Legible Manner 2 5 95 r Job Address: Date: 1 �� U �� SENC Lot: Block: Subdivision: Ti4� o Phase or Section Number: Owner: „ ti� t N G...—o N � -yt Address: 1 � 61 o N Zja �� A y � , ; C * 2 � ooPhone #: (73 Contractor: Address: Phone #: Description of Work to be Done Class of Work: ew []Addition ❑ Alteration ❑ Repair ❑Demolition Area of Building in Square Feet First Floor C' Second Floor (Z l -Z- NOTICE NOTICE Garage 5��4 Other rob This permit becomes null and void if work or construction authorized is not commenced within 180 days, or construction on work is suspended or abandoned for a period of 180 days at any time after work is commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other federal, state or local law regulating construction or the performance of construction. SiWature of Contradtor or Authorized Agent Print Name ka—i Electrical Contractor Plumbing Contractor Mechanical Contractor Value of Work to be Performed A FOR OFFICE USE ONLY FPMC -1 (4/94) V 0 '�'&/ t ci� C 8'—o" fC 451.40 F.ENLA. LETTER D. NUNIMUM U. • PLANS ARE REVIEWED FOR , APPROVAL OF SINGLE FAMILY RESIDENCE ONLY. OTHER DEPICTIONS OR CALL -OUTS ON PLOT PLAN HAVE NOT BEEN REVIEWED AND ARE NOT APPROVED. 16 E Lot Area: 25912 Sq.Ft. Type 'C' Drainage 10 Fence Length- 766' vaa�w vw• FLNCE LENGTH SHOWN IS MAX. FIELD VERIFY EXISTING FENCES. gYNF.RAI NOTES: _ w mktd. as ENTRYWAYS 16' WIFE . AY ISOEw 11 ­ L Gibbs Station _ ENTRY WALKWAY$ }' WIDE + PAUNwE . OTHE��E P __..,.,. _.._�,._.—...... suhdl�. Gibbs Station Phase Two R IEWEID lot 23 blk E �AiE address i.pprova► ©' ihC 1)1+' COY 1040 Creek Crossing f�ict ��'�' �Itr Cop p e l l, TX _ r ~date plan --_..:. _.._... 1!010 OALLAO ►AT1KwAY. owe Igoe L 01/03/95 2986.00 E L E V A RIGHT OALLAO, TlkAO 16l�0 HR SUR%EY' PLAT H R LOT 23, BLOCK E, OF CIBBS STATION, PHASE TWO, AN ADDITION TO THE CITY OF COPPELL, DALLAS COUNTY, TEXAS. 35 g 144., E 43.56' S8 S 83 f 4' 42" -. y U? Cr ti v 100 YEAR FLOODPLAIN PER PLAT ` fco CY LOT 23 BLK. E 9.0' LOT 22 FORMBOARD SURVEY FF.ELEV.453.32 8.0' a a` N w y 0 0 N N N V 25' BUILDING LING b 4i N — — — — — — — — — — — — — — — — — — — — — — — — — — — f 0' UTILITY ESN'T -- ------------------4349=- 5' T tI Esm,r N 78 CALL 70.00' MEAf'1r16NCT ff'A/NG 1040 CREEK CROSSING LOT 24 I hereby certify that on the_-!--I-day day of gr 3A 192-4—this survey was made on the ground as per the field notes shown on this survey and is Crus, correct, and accurate as to the dimensions of the subject property and rise, location and type of buildings and improvements thereon, if any. The survey shows all easements and visible easements of which I have knowledge or have been advised affecting the subject properly. There are no encroachments, conflicts, or protrusions visible on the ground other than those shown. FEB. 2, 1995 P�cq ��`"f E Date ��,'�e•,� r fOB HARRY J. R _. GF No. 4597 (D LEGF, ND Scale: I" = zs 1/2" Steel / Iron Rod round O i 1/2" Steel / Iron Rod Set Property Line it good Fence —•—.—•—•— Chain Link / Wire Fence X—x—X—X—X 114oad Electric IYuR HA RR Y R0WF,LL & Associates, INC. Surveying & Enginserir 1301 Elm Street Ste. 201 Ca,rrollto?t, Texas 75006 " ELEVATION CERTIFICATE " °-"'_esMay3 7-093 Ejcpires May 31, 1993 FEDERAL EMERGENCY MANAGEMENT AGENCY NATIONAL FLOOD INSURANCE PROGRAM ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to determine the, proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMB)._- Instructions for.completing this form can be` found ort the.following pages. = BUILDING OWNER'S NAME STREET ADDRESS OTHER SECTION A PROPERTY INFORMATION Unit, Suite and/or Bldg. (Lot and Block Numbers, etc.) Z -3. 23LGt__ OR P.O. ROUTE AND BOX NUMBER FOh INSURANCE COMPANY USE POLICY NUMBER COMPANY NAIC NUMBER - CITY 7Z'P�/ / J - STATE ZIP CODE SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION Provide the following from the proper FIRM (See Instructions): 1. COMMUNITY -NUMBER 2. PANEL NUMBER 3. SUFFIX DATE OF FIRM INDEX S. FIRM ZONE 6. BASE FLOOD'ELEVATION /}4.. (In AD Zaies, use ) 7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): EGVD'29 [3 Other (describe on back) 8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, indicate the community's BFE: I I I I I I.0 feet NGVD (or other FIRM datum—see Section B, Item 7), SECTION C BUILDING ELEVATION INFORMATION 1. Using the Elevation Certificate Instructions, indicatQ the diagram number from the diagrams found on Pages 5 and 6 that best describes the subject building's reference level i 2(a). FIRM Zones Al -A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation of I I I4l513l . J feet. NGVD (or other FIRM datum—see Section B, Item 7). (b). FIRM Zones V1 430, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the selected diagram, is at an elevation of I I I I I I .L feet NGVD (or other FIRM datum—see Section B, Item 7). (c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is W . U feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. (d). FIRM Zone A0. The floor used as the reference level from the selected diagram is w . U feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference level) elevated in accordance with the community's floodplain management ordinance? ❑ Yes ❑ No ❑ Unknown 3. Indicate the elevation datum system used in determining the above reference level elevations: `NGVD'29 0 Other (describe under Comments on Page 2). (NOTE: If the'elevation datum used in measuring the elevations is different than that used on the FIRM [see Section B, Item 7], then convert the elevations to the datum system used on the FIRM and show the conversion equation under Comments on Page 2.) 4. Elevation reference mark used appears on �FI,RM: E Yes . El No (See Instructions on Page 4) 5. The reference level elevation is based on: Ly actual construction ❑ construction drawings (NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which case this certificate will only be valid for the building during the course of construction. A post -construction Elevation Certificate will be required once construction is complete.) 6. The elevation of the lowest grade immediately adjacent to the building is:1 1 141ST -1 . L'Z feet NGVD (or other FIRM datum -see Section B, Item 7). SECTION D COMMUNITY INFORMATION 1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1 is not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest - floor" as defined by the ordinance is: I I ISI . CZ feet NGVD (or other FIRM datum—see Section B, Item 7). 2. Date of the start of construction or substantial improvement FEMA Form 81-31, MAY 90 REPLACES ALL PREVIOUS EDITIONS SEE REVERSE SIDE FOR CONTINUATION W This certification Is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law - certify elev:11on ;,-W pied. ri information when the elov4jiGn ifif@rmation for 4�Q@q Al AE 'A4 A (Wth PFE)"'YI-Ved", W'4' t. -BFE-) ins rR,`L6ire K1w of Aliii4p COMMUnRY 0#10" Wile Bre auth66W I V" 161;dpiajA. fthaje tint infd.ftati6n, may 4166 sign the- "ttifloatloh, In the *me of a i A (Witftdt a FIEMA bf %mAhity islbbd SFE b bdildin Off property 6*h6r, oian- owner's representative may W68 bidh the cer6fl6kti6n. Reference level diagrams 6, 7 and 8 - Distinguishing Features—If the certifier is Unable to certify to breakaway/non-breakiway WWI, enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered. certify that the information in Sections B and C on this certificate represents my best efforts to interpret the data available. understand that any false statement may be punishable by fine or imprisonmen or Code don 1001. A -t•A CERTIFfR-S NAME LI UM fx Y. TITLE ADDRESS SIGNATURE Copies should be COMMENTS: COMPANY STATE ZIP PHONE of this Certificate for: 1) community official, 2) Insurance agent/company, and 3) building owner. ON WITH SLAB BASEMENT A v A ZONES ZONES Itr ZONES LEVEE ja BASE hrff� FLOOD FLOOD JOR- AENT [=D ELEVATION ADJACENT LEVEL GFIADE 1114 / ME— ON PILES, PIERS, OR COLUMNS A v The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones. Elevations for all A Zones should be measured at the top of the reference level floor. Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. Page 2 . .