Loading...
FEMA-EC950831 (3)The City With A Beautiful Future BUILDING PERMIT APPLICATION �J _Z40. 'f 2r2_ 4,04�11 2. f? int or Type in a Clear, Legible Manner AUG 0 95 Job Address: O o (r r-7 Date: F / Lot: �3 3 Block: Subdivision: r� Phase or Section Number: 2 � irG Owner: G1 /7/0e -7e s' Address: %6610 / Phone #: 380-2-366 P>-/ 3 60 Contractor: ' " Address: Phone #: L ` Description of Work to be Done Cl"Work: ew ❑Addition ❑ Alteration ❑ Repair 1--111 ^ pa ❑Demolition r- . V C - of Building in Square Feet z-7 t Q a `= -il� r� 9 d � f--- I First Floor Garage <7 U Value of Work /f �% /� to be Performed � 20) 0011�)Second Floor (( l 0 na�6 GRAY AREA FOR OFFICE USE ONLY ........ FPMC - 1 (4/94) � �� _ �% ELEVATION CERMay31, TIFICATE Expire. -0°" Expires May 31, 1993 FEDERAL EMERGENCY MANAGEMENT AGENCY NATIONAL FLOOD INSURANCE PROGRAM ATTENTION: Use of this certificate does not provide a waiver of the flood insurance purchase requirement. This form is used only to provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to determine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMB). Instructions for completing this form can be found on the following pages. SECTION A PROPERTY INFORMATION FOR INSURANCE COMPANY USE BUILDDINGG WNER'S NAME / POLICY NUMBER -- 1 45s-1 STREET ADDRESS (Includi Apt., Unit, Suite and/or dg. Number) OR P.O. ROUTE AND BOX NUMBER COMPANY NAIC NUMBER OTHER DESCRIPTION (Lot and Block Numbers, etc.)�- -�'—.Z CITY STATE ZIP CODE <: 772 SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION Provide the following from the proper FIRM (See Instructions): 1. COMMUNITY NUMBER 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE 6. BASE FLOOD ELEVATION (in AO Zones, use depth) 7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): 1-iit VD '29 F_I Other (describe on back) 8. For Zones A or V, where no BFE is provided on the FIRM, and the community has established a BFE for this building site, indicate the community's BFE: _�1_;___ _�.i_1 feet NGVD (or other FIRM datum -see Section B, Item 7). SECTION C BUILDING ELEVATION INFORMATION 1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best describes the subject building's reference level __/_ . 2(a). FIRM Zones Al -A30, AE, AH, and A (with BFE). The top of the reference level floor from the selected diagram is at an elevation of 19J feet NGVD (or other FIRM datum -see Section B, Item 7). (b). FIRM Zones V1 -V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the selected diagram, is at an elevation of L__L-1�_� .LJ feet NGVD (or other FIRM datum -see Section B, Item 7). (c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is I. i J . [ -I feet above n or below [_ J (check one) the highest grade adjacent to the building. (d). FIRM Zone AO. The floor used as the reference level from the selected diagram is L_ I_ . L-� feet above ❑ or below ❑ (check one) the highest grade adjacent to the building. If no flood depth number is available, is the building's lowest floor (reference level) elevated in accordance with the community's floodplain management ordinance? �_- [_I No [_i Unknown 3. Indicate the elevation datum system used in determining the above reference level elevations: ?­NGVD '29 !!_-I Other (describe under Comments on Page 2). (NOTE: If the elevation datum used in measuring the elevations is different than that used on the FIRM (see Section B, Item 71, then convert the elevations to the datum system used on the FIRM and show the conversion equation under Comments on Page 2.) 4. Elevation reference mark used appears on FIRM: es D-11No (See Instructions on Page 4) ! 5. The reference level elevation is based on: _ RMactual construction ❑ construction drawings (NOTE: Use of construction drawings is only valid if the building does not yet have the reference level floor in place, in which case this certificate will only be valid for the building during the course of construction. A post -construction Elevation Certificate will be required once construction is complete.) 6. The elevation of the lowest grade immediately adjacent to the building is: _-1!i .%, feet NGVD (or other FIRM datum -see Section B, Item 7). SECTION D COMMUNITY INFORMATION 1. If the community official responsible for verifying building elevations specifies that the reference level indicated in Section C, Item 1 is not the "lowest floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest floor" as defined by the ordinance is: feet NGVD (or other FIRM datum -see Section B, Item 7). 2. Date of the start of construction or substantial improvement F FMA rrer+r. F1 31, Mnv PO F{. Ccr- RFV'rt3 F- �inF cnn ('r)r�-TWIi i, AT,r) N SECTION E CERTIFICATION This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation information when the elevation information for Zones Al—A30, AE, AH, A (with BFE),V1—V30,VE, and V (with BFE) is required. Community officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the certification. In the case of Zones AO and A (without a FEMA or community issued BFE), a building official, a property owner, or an owner's representative may also sign the certification. Reference level diagrams 6, 7 and 8 - Distinguishing Features—If the certifier is unable to certify to breakaway/non-breakaway wall, enclosure size, location of servicing equipment, area use, wall openings, or unfinished area Feature(s), then list the Feature(s) not included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered. I certify that the information in Sections B and C on this certificate represents my best er ret the data available. I understand that any false statement may be punishable by fine or imprisonment u i� 8ection 1001. CLICENSta�� ERTIF TITI C - - -- _ EfjAW mROWELL -- MPANY NAME q 46 8 ;4 ADDRESS cf�- CITY +�y� ®�« /`�' �4 G alp+ STATE ZIP SIGNATURE — — -- - �,�i�® _- __ Tx DATE / PHONE .s- zi��z-sem � Copies should be ma of this Certificate for: 1) community official, 2) insurance agent/company, and 3) building owner. COMMENTS: ON WITH SLAB ON PILES, BASEMENT PIERS, OR COLUMNS A v A A y CONES ZONES ZONES ZONES ZONES REMERFNCE REFERENCE. LE VFL BASE IEVEL REFERENCE FLOOD LEVEL ELEVATION -- t RACE FUK) ADJACENT REFEHF_NI;E ELEVAIION REFERENCE ADJACFNT GRADE - LEVEL BASE ELEVATION LEVE1. GRADE ADJACENT` GRADE. The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones. Elevations for all A Zones should be measured at the top of the reference level floor. Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. Page ? HR SURVEY PLAT HR LOT 33R, BLOCK E, OF REPLA 34, BLOCK E, GIBBS STATION PHASE TWO, AN ADDITION TO THE CITY OF COPPELL, DALLAS COUNTY, TEXAS. LOT 32R X10'' $ 129.87, w a 06 5 S 39 3�_Zqq,, $ Z\ 1 ko � f 1.0' Vj 1 F THIS PORTION OF THIS PROPERTY LIES WITHIN THE 100 YEAR FLOODPLAIN y t. ai PER THE PLAT w O h ej N co THIGH BANK-,,,., LOT 33R BLK. E 8.0' t. b y FORMBOARD SURVEY 8.0' W w b 25' BUILDING LINE mt` p0 N K � Cb I U3 92 21 10 to, UTILITY ESA1'T 5' TU ESM'T CALL 70.20' MEAS. CH. 70.40' ( R=975.0' ) 9 h w t: N Z\ ko ko f 1.0' h ai w LOT 34R 8.0' a O N CIO k 1080 CREEK CROSSING I hereby certify that on the—=day of /t16 • 1995 this survey was made on the ground ae per the field notes shown on this survey and is true, correct, and accurate as to the dimensions of the subject property and size, location and type of buildings and improvements thereon, if any. The survey shows all easements and visible easements of which I have knowledge or have been advised affecting the subject properly. Then are no encroachments, conflicts, or probvsions visible on the ground other than those shown. ni Date AUGUST 31, 1995 JOBGF No. 19 LEGEND 0 1/2" Steel / Iron Rod Found O f/2" Steel / Iron Rod Set Property Line Food Fence — . — . — . — — Chain Link / wire Pence x—x—x—x—x Overhead Electric E E— E — Scale: I" = Z-,5-' sG HARRY R 0 WELL d Associates, INC. Surveying k Engin 1301 Elm Street Ste. 20f Carrollton, Texas 75006 w m� W N RMWAY/FLOODPWN EASEWEvT I I I I i � �► tZE.SI OE1�1C,E 0 AL,Tlt�S(a e�a�ve I � I N �5' TiJ ELEC. E9dL�;"'� -I • !f -O MEWALK PM aW CODE I i I I I I I I I I I I I I, IV CREEK CROSSING W ''(6 uJ 10 ------��IT�� I PLANS ARE REVIEWED FOR APPROVAL, OF SINGLE FAMILY Rs_ IDENCE 011: y. OTHEP =- :PICTIONS OR CALL -OUTS ON PLOT PLAN �� BEEN REVIEWER ARE MI APPROVED. ir.1W OF COPPELL REVIEWE z DATE Ap(,r.r.;:; of the plans and specifications shall not t;: + : , 'near! construction in direct cc','. tl )m 'oppell Building Codes �3 3_ Zoll .. NORTH 0mratpr cot, 0 C SITE PLAN SC: 1"-20'-0" LOT 33R BLOCK E GIBBS STATION PHASE TWO COPPELL, TEXAS H d M E S