Loading...
Coppell Cross L5-CS000330 (2)DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coo_veil Crossing, Lot $, Block 1, Final Plat and Site Plan, to allow the development of $,046 square foot retail building on approximately 1 acre property located along the west side of S. MacArthur Boulevard, approximately $80' north of the D~4.R.T. right-of-way, at tke request of Dm4d Cannon & Associates. DRC DATE: March 30, 2000 and April 6, 2000 CONTACT: Mike Martin, P.E., Assistant City Engineer 072-304-3679) COMMENT STA T-.IS: ,/PRELIMINARY ~'TI~ T A T Provide preliminary utility plan so staff can determine if easements are needed. Any existing easements shown on plat needed to be labeled with the recorded volumn and page.