Loading...
Coppell Cross L3-CS 990311 /~ The City With A Beautiful Future ' /L___...,/ P.O. BOX478 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 Dinesh N. Engineer, P.E. Rekha Engineering, Inc. 5301 Hollister Road, Suite 485 Houston, TX 77040 Assessment Letter FILE Dear Mr. Engineer Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in thc mount of $9,911.10 and forward to thc Finance Department along with a copy of the Fcc Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Please refer to the attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, M~ Mart', . . Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services 'Project: Date: DEVELOPMENT FEE TABLE Coppell Crossing, Lot 1 Block 1 (Burger King) 3/9/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142.80 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $57.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $4,286.10 $4,286.10 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project Street Sign Fee Information not Available (100 % due prior to Acceptance of Project [I Construction Inspection Fee iaformation not Available II TOTAL $10,376.65 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $9,911.10 DEVELOPMENT FEE WORKSHEET PROJECT: Coppell Crossing, Lot 1 Block 1 (Burger King) DATE: 3/9/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): I - 1 1/2 inch = 5 ESU's I - 1 inch = 2.5 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 7.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $142.80 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigation/Fireline Water Meter Fee: Total 0: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $57.75 Domestic Water Meter Deposit Fee: Total 0: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigatioa/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: @ $450.00 ea. Wastewater Tap Inspection Fee: Total 0: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $3,375.00 $100.00 $142.80 $57.75 $0.00 $0.00 $35.00 $30.00 $2,250.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $o.oo $4,286.10~ Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Avail. Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: CoppeH Crossing, Lot 1, Block 1 (Burger King) 3/9/99 ROADWAY IMPACT Service Area * 7 Category ** Comrnereial Land Use ** Fast Food Restaurant Development Units ** 3.925 Vehicle Miles per Development Unit ** 3.64 Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle M_ilea per Development Unit) x (Fee per Vehicle Mile) = $3O0 $4,286.10: * (Figure 2 - Roadway Tmpact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.