Loading...
FEMA-EC951003E BUILDING PERMIT APPLICATION IVjil11*1 .-. AUG 2295 3-915 Job Address: cl\�C-\ Date: Lot: \ Block: Subdivision: Phase or Section Number: Owner - Address: .,-., ���.�� Phone #: Contractor: Address. Phone #: Description of Work to be Done Class of Work: New ❑ Addition ❑ Alteration ❑ Repair ❑ Demolition Area of Building in Square Feet First Floor C=� Garage Value of Work be C \� Second Floor D to Performed Other GRAY AREA FOR OFFICE USE ONLY NOTICE PerT11itFee: I ' Pt Nrurnber» `. c This permit becomes null and void if work or construction authorized is not commenced within 180 days, or construction on work is suspended or abandoned for a period of 180 days Zor*v blauka; � i1C�( �i�SS �: at any time after work is commenced. r I hereby certify that I have read and examined this application and know the same to be true App oved ®y, t Date: and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to Comments: give authority to violate or cancel the provisions of any other federal, state or local law regulating construction of the performance of construction. Signa re of Contractor or Apthorized Agent Print Name\ Electrical Contractor Plumbing Contractor Mechanical Contractor FPMC - 1 (d/9d1 3-915 A O.M.B. NO. 'W-0077 ELEVATION CERTIFICATE E'PihsMay',1,1996 FEDERAL EMERGENCY MANAGEMEN$ AGENCY NATIONAL FLOOD INSURANCE PROGRAM " M ATTENTION: Use of this certificate do6d not provide a waiver of the flood insurance purchase requirement. This form Is used only to provide elevation information necessary to ensure compliance with applicable community floodplain management ordinances, to delprmine the proper insurance premium rate, and/or to support a request for a Letter of Map Amendment or Revision (LOMA or LOMR). Instructions for completing this form can be found on th6 following pages. SECTION A PROPERTY INFORMATION 1 FOR INSURANCE COMPANY USE ,1011 -DING OWNFn S NAME 1 POLICY NUMBER sTnEFT ADDRESS (Including Apt.. Unit, Suits and/or Bldg. Number) OR P.O. ROUTE AND BOX NUMBER COMPANY NAIC NUMBER OTIiER DESCRIPTION (Lot and Block Numbers, etc.) tr.Cs_-r_�'s l_ Vis�o c�y 41 Gems smT goo , PN Qsc stti o Cr, v STATE ZiP CODE SECTION B FLOOD INSURANCE RATE MAP (FIRM) INFORMATION Provide the following from the proper FIRM (See Instructions): 1 COMMUNITY NUMrtEn 2. PANEL NUMBER 3. SUFFIX 4. DATE OF FIRM INDEX 5. FIRM ZONE B. BASE FLOOD ELEYATIQN (in AO Zones, use depth) • gt$ot-I o oo\o E pPCt . �5, ��� x, QE AA -1 7. Indicate the elevation datum system used on the FIRM for Base Flood Elevations (BFE): ❑ NGVD '29 ❑ Other (describe on back) 8 For Zones A or V, where no BFE is provided on the. FIRM, and,the poMmunity, his established a SFE for this building oft*. indicato the community's BFE L_j__ II_J . U feet NGVD (or other FIRM datum -she Section B, item 7), SECTION C BUILDING ELEVATION INFORMATION 1. Using the Elevation Certificate Instructions, indicate the diagram number from the diagrams found on Pages 5 and 6 that best describes the subject building's reference level 2(a). FIRM Zones Al -A30, AE, AH, and A (with BFE). The top of the reference level floor from the telected diagram is at'an elevation of L_! __t4 ` 1.17 feet NGVD (or other FIRM datum -sob Section B, Item 7). (b). FIRM Zones VI -V30, VE, and V (with BFE). The bottom of the lowest horizontal structural member of the reference level from the selected diagram, is at an elevation of L_LI I I .0 feet NGVD (or other FIRM datum -906 Section B, Item 7). (c). FIRM Zone A (without BFE). The floor used as the reference level from the selected diagram is L_iJ H feet above ❑ or . below i (check one) the highest grade adjacent to the building. (d). FIRM Zone AO. The floor used as the reference level from thG selected diagram is i � I .L l feet above ❑ or below ❑ (check one) the highest grade adjacent to the building.,, If ng,fiood depth number Is available, Is the building's lowest floor (reference level) elevated in accordance with the community's floodplain management ordinance? ❑' Yes ❑ Nib ❑ Unknown 3. Indicate the elevation datum system used in determining the above reference level elevations: ❑ NGV^ '29 ❑ Other (describe under Comments on Page 2). (NOTE: if the elevation datum used In measuring the elevations Is different than that used on the FIRM (see Section B. Item 7J, then convert the elevations to the datum systdm used on the FIRM and show the comvrsion equation. under Comments on Page 2.) 4. Elevation reference mark used appears on FiRM: i" Yes ❑ No (See Instructions on Page 4) 5. The reference level elevation Is based on: ❑ actual construction ❑ construction drawings Use of construetion drawings is only valid if the building does not yet have the r9fdr6nce f6vel flbdr in place; in which rise this certificate will only be valid for the building during the course of construction. A post -construction Elevation Certificate will be required once construction is complete.) 6. The elevation of the lowest grade immediately adjacent to the building Is: 1 1 415 15 .2 .feet NGVD (or other FIRM datum -see Section R, Item 7). - SECTION D COMMUNITY INFORMATION i. if the community official responsible for verifying building elevations specifies that the reference level Indicated in Seetion•C,-item t is not the "InweSt floor" as defined in the community's floodplain management ordinance, the elevation of the building's "lowest floor" As defined by the ordinance is: L i i_j . U feet NGVD (or other FIRM datum -see Section B, Item 7). 2. Date Gf ';he start of construction or substantial improvement T tr r c i nnrNnn, it rr,,niwi,z ort: orwOOF S)r>F FOR COlTnNUATIcN SECTION E CERTIFICATION This certification is to be signed by a land surveyor, engineer, or architect who is authorized by state or local law to certify elevation information when the elevation information for Zones At -A30, AE, AH, A (with SFE),V1-V30,VE, and V (with FIFE) is required. Cnmmunity officials who are authorized by local law or ordinance to provide floodplain management information, may also sign the certification. In the case of Zones AO and A (without a FEMA or community Issued BFE), a building official, a property owner, or an owner's representative may also sign the certification. Rpfprence level diagrams 6. 7 and 8 - Distinguishing Features -if the certifier is unable to certify to breakaway/non-breakaway wall, enclosure size, location of servicing equipment, area use, wail openings, or unfinished area Feature(s), then list the Feeture(s) not included in the certification under Comments below. The diagram number, Section C, Item 1, must still be entered.._ I certify that the information in Sections B and C on this certificate represents my best efforts to interpret t 4100/8 1 understand that any false statement may be punishable by fine or Imprisonment under 18 U.S. Code, S 0 66., .r cFnTIrIFn'S NAME LICENSE NUMBER (or Affix Seel) � TITLE COMPANY NAME Sv W "O2 9iyOaE.�>i1r�{O --- — AnDf1FSS CMY ZIP F o. PSo Yc 13 S 5 r° ----------- ULL I or To tJ Ty - 160'J el DATE PHONE 10- o3-Ibs 8\-t 26t 28� o Copies should be made of this Certificate for: 1) community official, 2) Insurance agent/company, and 3) building owner. COMMENTS:'?NC-N.__MLy-R..l_y1p11E,gi� F(ZQM�arJS'((2,�f(�t01�1 P�ba�s. F�es2 GtP�PyR� STDe��oN Q►�p '\'� " %% . __T c�sT__\ GEN?EYZ OF QELIrS56 10 -LET- Ott SOOT" 5\Qe OF P4t2.t! WAS( F ulp. G-,0 y" WEST' _6F ._ 4tr �Tla\ -- OF _ 1►J --- -SEc.T lot) O talc ta2THU R. t�t.�P QpKt> SIS`{ F3t-V D �I.EV a 4 5 31 X___Gvt' 1N_GL�=1��-tl`'}C2`.�t'\O1J,.0C MS„R.THUI�. �1�0 +t'A(WAY F3L�IU. 4S3.g,3 SON WITH ON PILES, BASEMENT PIERS, OR COLUMNS A V A A v jt 70PIFS ZONES ZONES ZONES ZONES 1 REFERENCE ncrrnrrK:r BASE LEygl, REFERENCE LEVEL FLOOD LEVEL L ELEVATION c a fd rnsE 1•'' ' •'tn' 0As6 ri000 ADJACENT REFERENCE FLOOD„ ECEVAtION�' nFFFRENf:F. ADJACENT GRADE r� LEVEL ELEVATION LEVEL GRADE . ,., ..- ` ''i?. f. •. .. i.;>:.: ;_r.; ., :•�I ADJACENT?. ,... GRADE The diagrams above illustrate the points at which the elevations should be measured in A Zones and V Zones. „Flevations for all A Zones should be measured at the top of the reference level floor. 'Elevations for all V Zones should be measured at the bottom of the lowest horizontal structural member. Paqe 2 PLAN! API FAMW CA'U HAVE AND HOU L COVERA "I do hereby certify that this drawing or plan and related specifications meet all local code requirements and are in substantial conformity with V.A. Minimum Property Requirements." David 1300 Post Ook 8W., WeekleyHomes Suite 1600 Houston, Texas 77056 (7Q)963-0500GGpro --4 --- — project: 019 1 TC 451.8E subdiv: GIBBS STATION II plan: N 531 C 20 TC 451.60 Int: 15 blh: A sect: THE TOP OF SLAB MUST BE CIBBS CR0,,S-'SI!V(; SET A MINIMUM OF 2-2x6'S ABOVE THE HIGHEST GRADE ELEVATION OF THE BUILDING PAD. "I do hereby certify that this drawing or plan and related specifications meet all local code requirements and are in substantial conformity with V.A. Minimum Property Requirements." David 1300 Post Ook 8W., WeekleyHomes Suite 1600 Houston, Texas 77056 (7Q)963-0500GGpro date: 5-10-95 project: 019 address: 949 GIBB S CROSSING job: 0125 subdiv: GIBBS STATION II plan: N 531 C FLATWORK FENCE S0D Int: 15 blh: A sect: ;nale:l" =20'