Level 3-PT20082008/20/2020Scott LattaThe contractor shall submit the Completion Verification Noticeform on page 4 upon completion of the work. UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1.A copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. 8.Repair existing utilities that are damaged, including but not limited to clean-outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility-operations-division 972/ 462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN. 214/ 320-5455 (Mike Rasmussen)940/ 898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 214/ 215-3031 (Rich Millenman)817/ 588-5800 COSERV Gas & Electric DENTON CO. LEVEE DISTRICT 940/ 321-7800 x 7624 (Greg Ward)214/ 352-5118 (Richard Hightower) EXPLORER PIPELINE Atmos Energy 918/ 493-5100 (Patrick Nwakoby)972/360-4428 (Gary Dickinson) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates 972/ 318-5277 (344 - 8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16.“Clean-up” requires returning work area to pre-project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) Page 3 of 4 Page 4 of 4 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Order # (if applicable) Sub-contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Follow-up needed? Follow-up scheduled for Yes No and found to be acceptable / not acceptable because of Streets Maintenance Division on