Loading...
Coppell Cross L3-CS 960725DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: S-IllS, Btwger gd~ff, zoning clumge from C (Conunercial) to C- S.H.P. (Commercial, Special Use Permit) to allow the dm,elolmwnt of a 3,800 s.f. drive-through restaurant, tocated at the southwest corner of MtwAtthur Bl~. and Riverckase Drive, at the request of DRC DATE: Jury 25, 1996 and August 1, 1996 CONTACT: M'~e Martin, F,.I.T., Asdstant City Engineer 004-3679) oo~r va~gnrA ov ~ /REVISED COMMENT STATUS: ................ AFTER P&Z Site Plan 1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from the order board back. 2) Provide an eastbound right turn lane on the abandoned Riverchase Dr. 3) Provide 30' radius for trucks. 4) Provide paving, utility, grading and drainage plans. 5) Provide channelization island for the driveway off of MacArthur. Contact Atul Patel for more details at 304-3682. 6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting with oncoming traffic. 7) The driveway south of the site must meet driveway spacing requirements. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: S-IllS. Bs~er ~ne. zoning ckange from C (Commoz~) to C- $. U.P. (Co~,~erc~l, $pecial U~e Permit) to ~ the of a $,800 s.f. drive-tkrougk restaura~ located at tke corner of MacArtkur ~ and Riverckase Drive, at tke request of A~kwin Pari~ Architectural Design and Engineering. DRC DATE: July 25, 1996 and August 1, 1996 CONTACT: w~e Mantn, ~.L T., ~ C~ty ~.n~4neer COMMENT STATUS: m,~', ,,~.,,,~.~ ~,v /FINAL Site. Plan 1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from the order board back. 2) Provide an eastbound right mm lane on the abandoned Riverchase Dr. 3) Provide 30' radius for trucks. 4) Provide paving, utility, grading and drainage plans. 5) Provide channelization island for the driveway off of MacArthur. Contact Ami Patel for more details at 304-3682. 6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting with oncoming traffic. 7) The driveway south of the site must meet driveway spacing requirements. DEVELOPMENT REVIEW COMMI2TEE ENGINEERING COMMENTS ITEM: S-IllS. B~,~r ~g. zoM~g cim~ge ~ C (Co~rdal) ~o C- S.U.P. (Commerci~ Special Use Pomit) t~ ~ tke de~dopmest of a $, 800 s.f. d~ve-tlmmgk r~tmmm~ located at tl~ so~almea comer of MacArtlmr Bl~ a~l ~erclmse Drip, at tl~ request of DRC DAT~: July 25, 199ff and August 1, 199ff CONTACT: kF~e COMMENT STAT(J$: PRE£1MINARY Site Plan 1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from the order board back. 2) Provide an eastbound right turn lane on the abandoned Riverchase Dr. 3) Provide 30' radius for trucks. 4) Provide paving, utility, grading and drainage plans. 5) Provide channelization island for the driveway off of MacArthur. Contact Atul Patel for more details at 304-3682. 6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting with oncoming traffic. ?) The driveway south of the site must meet driveway spacing requirements.