Coppell Cross L3-CS 960725DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: S-IllS, Btwger gd~ff, zoning clumge from C (Conunercial) to C-
S.H.P. (Commercial, Special Use Permit) to allow the dm,elolmwnt
of a 3,800 s.f. drive-through restaurant, tocated at the southwest
corner of MtwAtthur Bl~. and Riverckase Drive, at the request of
DRC DATE: Jury 25, 1996 and August 1, 1996
CONTACT: M'~e Martin, F,.I.T., Asdstant City Engineer 004-3679)
oo~r va~gnrA ov ~ /REVISED
COMMENT STATUS: ................
AFTER P&Z
Site Plan
1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from
the order board back.
2) Provide an eastbound right turn lane on the abandoned Riverchase Dr.
3) Provide 30' radius for trucks.
4) Provide paving, utility, grading and drainage plans.
5) Provide channelization island for the driveway off of MacArthur. Contact Atul Patel for
more details at 304-3682.
6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting
with oncoming traffic.
7) The driveway south of the site must meet driveway spacing requirements.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: S-IllS. Bs~er ~ne. zoning ckange from C (Commoz~) to C-
$. U.P. (Co~,~erc~l, $pecial U~e Permit) to ~ the
of a $,800 s.f. drive-tkrougk restaura~ located at tke
corner of MacArtkur ~ and Riverckase Drive, at tke request of
A~kwin Pari~ Architectural Design and Engineering.
DRC DATE: July 25, 1996 and August 1, 1996
CONTACT: w~e Mantn, ~.L T., ~ C~ty ~.n~4neer
COMMENT STATUS: m,~', ,,~.,,,~.~ ~,v /FINAL
Site. Plan
1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from
the order board back.
2) Provide an eastbound right mm lane on the abandoned Riverchase Dr.
3) Provide 30' radius for trucks.
4) Provide paving, utility, grading and drainage plans.
5) Provide channelization island for the driveway off of MacArthur. Contact Ami Patel for
more details at 304-3682.
6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting
with oncoming traffic.
7) The driveway south of the site must meet driveway spacing requirements.
DEVELOPMENT REVIEW COMMI2TEE
ENGINEERING COMMENTS
ITEM: S-IllS. B~,~r ~g. zoM~g cim~ge ~ C (Co~rdal) ~o C-
S.U.P. (Commerci~ Special Use Pomit) t~ ~ tke de~dopmest
of a $, 800 s.f. d~ve-tlmmgk r~tmmm~ located at tl~ so~almea
comer of MacArtlmr Bl~ a~l ~erclmse Drip, at tl~ request of
DRC DAT~: July 25, 199ff and August 1, 199ff
CONTACT: kF~e
COMMENT STAT(J$: PRE£1MINARY
Site Plan
1) In the drive thru, provide 4 stacking spaces between the window and order board and 4 from
the order board back.
2) Provide an eastbound right turn lane on the abandoned Riverchase Dr.
3) Provide 30' radius for trucks.
4) Provide paving, utility, grading and drainage plans.
5) Provide channelization island for the driveway off of MacArthur. Contact Atul Patel for
more details at 304-3682.
6) Angle parking on south and north side of building to eliminate drive thru traffic conflicting
with oncoming traffic.
?) The driveway south of the site must meet driveway spacing requirements.