Coppell Cross L5-CS 991028DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Coppell Crossing Addition, Lot 5, Block 1, Final Plat and Site Plan Review, to
allow the development of a 9,942 square foot office/showroom facility on
approximately 1.1 acres of property, located along the west side of MacArthur
Boulevard, approximately 580' north of the D.A.ILT. right-of-way, at the
request of Dunaway Associates, In~
DRC DATE: October 28, 1999 and November 4, 1999
CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679)
COMMENT STA TUS: PRELL~,~.LnZA~R Y
Show a 40' drainage easement for the 2-7'x4' box culvert.
The proposed box culvert should be located such that the proposed building or its attached
walkway does not interfere with the required easement.